Questions and answers

Q 1. Bullet resistant booths must be steel, aluminum does not carry a bullet resistance level. How would you like to proceed?

A 1. We would like to proceed with the steel.

Q 2. Iron panels cannot be inserted in the interior to provide bullet resistance. How would you like to proceed?

A 2. It has to be Level 3 Bullet Resistant, purpose what is fusible, and commonly used for these types of security booths.

Q 3. A 5’x7’ roof on a 4’x6’ booth would provide a 1’ full perimeter overhang, not a 4” overhang.

Please advise which is preferred.

A 3. Purpose a size that can go on the roof to provide an overhang.

Q 4. Counter will need to be at least 21” deep to provide a drawer below. How would you like to proceed?

A 4. 21” counter is acceptable.

Q 5. We will not provide exterior load centers, interior only. Is this ok?

A 5. Yes.

Q 6. Cannot provide baseboard heaters (they are junk!), can provide a wall mounted fan forced electric heater. Does this suffice?

A 6. Alternative heater is acceptable.

Q 7. True tinted glazing is not rated by %, 15% is only available with film and we do not provide film tint.

A 7. Please advise what tint is available.

Q 8. Safety package is not something we stock and will need to be provided by others.

A 8. Ok and proceed

Q 9. Will need site photos of each install location in order to provide install price.

A 9. Installation not needed. Only delivery and off loading

Q 10. Can you please advise the material to be used for framing (You can't weld aluminum to steel and I'm not sure why they would wont the top frame aluminum and the bottom steel, the bottom is moor subject to weathering)?

A 10. We will accept steel.

Q 11. Please confirm the concrete pad will be provided and pre-installed by the government.

A 11. Yes, the concrete pads will pre-installed by the government.