Crosswalk_template.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Prefabricated Guard Booths(3 EA)
- Solicitation number
- NIH-OLAO-OD3-RFQ-5442883
About this file
Crosswalk template **Required complete and submitted with your quote.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_.pdf | ||
| SOW_-_3_Guard_Booth.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Crosswalk
| Crosswalk | ||
| Vendor Name and Address: | Date: |
| SOW Minimum requirement | Page Number/Section(s) from Vendor Porposal | Compliance with SOW Requirement (Yes /No) | If no, how will the requirement be met? |
| (1) Structure and pre installed fixture | |||
| 4' x 6' Custom Booth | |||
| Framing: durable weather resistant aluminum | |||
| Walls: double layer of insulated pre-painted galvanized iron panels, with UL 752 | |||
| Level 3 Bullet Resistant interior panels | |||
| Insulation: 2” weather-resistant R10 insulation | |||
| Color: indigo blue exterior & light gray interior | |||
| Door: UL 752 Level 3 Bullet Resistant lockable swing door | |||
| Windows: UL 752 Level 3 Bullet Resistant Fixed Windows and Framing | |||
| Roof: 5’ x 7’ roof to offer 4" overhang all around booth | |||
| Floor: galvanized diamond floor plate on steel forklift able base-frame | |||
| Electricity: (4) 110V outlets, ceiling light with switch, exterior connection box, (60 |
AMP Load) Breaker Panel Box -60 Amp Main Breaker, 10 Circuit
| Rooftop AC System - Wired and Installed |
| Two Baseboard Heaters - 750 watt each (120V) |
| Tinted windows - 15% black tint |
| Desk: 12” built-in desk with drawer along 4’ side opposite door |
| (2) Safety Package |
| Fire Extinguisher |
| Smoke Detector |
| First Aid Kit |
| Wall Mounted Flashlight Set of 4 anchoring bracket. |
| (3) Delivery and shipping |
| Delivery to three locations with-in the NIH main compouse: |
| Unload the units with a warehouse forklift, position on a concrete pad which will be pre-installed at the designated locations. |
| Number of days from the award date to delivery |
File details come from the government source that posted it.