NGWMN_FY26_Attachment_C_Proposal Checklist_2026.pdf
PDF 162 KB Posted
- Attached to
- Groundwater and Streamflow Information Program, National Ground-Water Monitoring Network
- Opportunity number
- G26AS00002
About this file
This is a proposal checklist for the National Groundwater Monitoring Network (NGWMN) grant program. The checklist is designed to ensure that applicants submitting proposals meet all requirements across multiple objectives (labeled 1, 2A, 2B, 3, 4, 5, and 6) before final submission. Proposals must be submitted by 4 p.m. EST on the due date, with federal funding capped at $150,000 per year. Applicants must verify their eligibility before submission and ensure that all detailed budgets correspond to each objective applied for, or proposals will not be reviewed.
The checklist encompasses general requirements including proposal formatting (PDF, less than 20 pages excluding figures and tables, minimum 12-point font), accuracy of budgets using the suggested format, proofreading, and inclusion of supporting documentation such as a Data Management Plan, staff qualifications, letters of support, and negotiated rate agreements for indirect costs. Specific requirements vary by objective: Objectives 1, 2A, 2B, and 3 require no match funding and no travel costs; Objectives 4, 5, and 6 require at least 25% in-kind services match. Maps and site tables must include NGWMN ID, principal aquifer, and well depth. Objective 2A funding is limited to $20,000 per year for agencies serving fewer than 500 sites, with justification required for additional costs. Objective 5 (well drilling) requires detailed cost breakdowns by component (mobilization, per-foot cost, travel, casing, grout), inclusion of the SF-424D Construction Assurances Form, and water-level monitoring equipment for newly drilled wells added to the Waterlevel Network. The checklist requires sign-off by the Principal Investigator and a reviewer with completion date documentation.
NGWMN_FY26_Attachment_C_Proposal Checklist_2026.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State
Agency
Principal Investigator Name
Checklist items
(Enter 'Y' or 'NA' in each light grey box) 1 2A 2B 3 4 5 6
Proposal has been proofread
Budgets have been checked for accuracy and use of the suggested format
Proposed project start and end dates are within range
Federal funding is less than $150,000 per year
Proposal is less than 20 pages excluding figures and tables. Font size is at least 12 pt (even on tables)
Proposal is in PDF Format and includes all tables, figures, budgets, the Data Management Plan, and letters of support.
Adequate background information is provided
Agencies that provide data to the NGWMN through another agencies database must describe the delivery in the Background Information section
Includes table of recent NGWMN projects
Framework document or Tip Sheets are referenced
References NGWMN Well Density guidelines when proposing gap filling activities
Letter of support from local USGS WSC if monitoring is part of a USGS Cooperative Matching Funds project
Letter of support from other agencies that will be participating in the project
Staff qualifications are shown for staff listed in budgets
Data Management plan is included
If requesting indirect costs, current Negotiated Rate
Agreement is included, unless de minimis rate applied
NGWMN Proposal Checklist
Overall
Proposal
Objectives included in Proposal
General Requirements
Reminders
Proposal must be submitted by 4 pm EST on the proposal due date. Late proposals will not be considered for funding
Check applicant eligibility requirements in Eligibility section of the Program Announcement to be sure you are eligible for funding
Proposals that do not include a detailed budget for each Objective applied for will not be reviewed
1 2A 2B 3 4 5 6
Includes a table of sites for which work is proposed
Tables of sites include the NGWMN ID, the Principal
Aquifer, and the well depth
Includes a map of all sites for which work is proposed
Maps have a scale bar, north arrow, and explanation
Maps include the Principal Aquifer
Zoomed in maps include an inset map
Includes overall project budget
Includes detailed budget for each objective
Uses budget formats in the Program Announcement
Detailed budgets include the Objective summary table
Costs and hours for the work are reasonable
Tasks in workplan are listed in detailed budget
Budgets are separated out by individual task and by staff member (not lumped for each staff member)
In-kind services work tasks are itemized
Costs for tasks done by contractors are itemized
Describes existing monitoring networks
Describes data storage and IT infrastructure
Describes approach for developing web services
Discusses how new sites will help fill gaps in NGWMN
(references well density guidelines)
Includes map of potential sites that includes existing
NGWMN sites
References site selection and classification tip sheets
No work is proposed under Objectives 4, 5, or 6
New Data Provider Project Requirements
Budgets
Maps and Tables
ObjectivesOverall
Proposal Checklist items
No Federal funds are requested for data collection, data entry, or data management for routine data collection
The need for the work is justified
All sites for which work is proposed are in NGWMN
Registry
Includes a table of sites for which work will be done under the objective
Includes a map of sites for which work will be done under the objective
States the benefits of the work to the NGWMN
Workplan for objective includes detailed tasks
Tasks in workplan are in detailed budgets
Includes timeline for each objective.
Timelines include annual progress report (for multi-year projects) and the final project report
Equipment with a single item cost of more than $10,000 has a quote included in the proposal
Data collection methods are described in the Data
Management Plan
Data collection quality assurance is described in the
Data Management Plan
Workplan includes task for final report
Checklist items Overall
Proposal
Objectives
Objective requirements
No match is required for Objectives 1, 2A, 2B, or 3
Provides at least 25% in-kind services match for
Objectives 4, 5, or 6
No funding for travel under Objectives 1, 2A, 2B, or 6
2A: Includes task to verify that data is flowing to the
NGWMN
2A: Funding is less than $20,000 per year for agencies serving less than 500 sites
2A: Agencies with more than 500 sites that are requesting more than $20,000 under Objective 2A must justify the additional costs
3-6: Data from agency is flowing to the NGWMN.
4: A paragraph is included for each well for which well rehabilitation, redevelopment, or repair is proposed
4-5: Equipment rental fees are reasonable and justified
5: Includes a table of proposed wells to be drilled with the cost per well shown
5: Map shows proposed new sites and all existing
NGWMN sites
5: A paragraph is included for each well for for which drilling is proposed
5: Drilling costs are split out in budget table
(mobilization, per foot cost, travel, casing, grout, etc)
5: Construction Assurances Form (SF-424D) is attached
5: Newly drilled wells that will be added to the Water-level Network are to be equiped with water-level monitoring equipment
6: Make, model, and cost of proposed equipment is provided
6: Per well limits are not exceeded
Requirements for specific objectives
Date Completed
Name of Principal Investigator who completed checklist
Name of individual who reviewed proposal and checklist
ObjectivesOverall
Proposal Checklist items
File details come from the government source that posted it. Updated .