nga_rfp_08_050_01 amendment 002 signed.pdf

PDF 232 KB Posted

Attached to
Servicing chiller plant refrigeration pump down/recovery tank unit
Solicitation number
NGA-RFP-08-050A
Issued by

About this file

NGA RFP 08 050-01 amendment 002 clarifications

View the file

Other files

File Type Posted
nga_rfp_08_051_01_amendment_001.pdf PDF
nga_rfp_08_051_01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

August 19, 2008

NGA RFP 08-050-01 Amendment 002

During a Thursday, August 14, 2008 site visit at the National Gallery of Art (NGA) regarding the above subject project, inquiries regarding the condition of the refrigerant compressor and condenser were presented by the contractors in attendance. The response to these and other questions are noted below;

1. What is the operational status of the recovery unit’s refrigerant compressor?

NGA: Compressor was put in use approximately 18 months ago during the Gallery’s chiller plant renovation project and is considered fully operational.

2. What is the operational status of the recovery unit’s condenser?

NGA: Condenser was put into operation approximately 18 months ago during the Gallery’s chiller plant renovation project and is considered fully operational.

3. Are access valves for both liquid and vapor lines to be installed in the existing refrigerant piping at the Chiller?

NGA: No.

4. Are the bypass/transfer valves at the vapor line to the compressor to be replaced?

NGA: Yes. These bypass/transfer valves are threaded angle shut-off type and to be replaced with matching size and type.

5. What type of compressor oil meets manufacturer’s recommendations?

NGA: Oil type (synthetic), grade and viscosity must satisfy compressor manufacturer recommendations and be in compliance with the intent of the projects statement of work.

IDCode:
Page: 1
Pages: 2
AmendNo: Amendment 002
EffDate: 8/19/08
ReqNo:
ProjNo:
IssCode:
IssuedBy: National Gallery of Art

2000B South Club Drive Landover, MD 20785

AdmCode:
AdminBy:
ContName: Solicitation Mailing List
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolAmdNo:
AmendDate:
ModNo: NGA-RFP-08-050-01
ModDate: 8/8/08
NoCopies:
Amended: Yes
ApprData:
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: No
Copies:
Descript: The purpose of this amendment is to provide clarifications resulting from the 8/14/2008 site visit at the National Gallery of Art. Please see the attached.

Due date and time of proposals, and all other terms and conditions remain unchanged.

SignName:
SignTitl:
ContDate:
CoName:
CoTitle: Geoffrey Spotts, Contracting Officer
CODate:
SolChgYs: Off
SolChgNo: No
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
2008-08-19T16:16:13-0400
Geoffrey Spotts
I am the author of this document