NFFN71102201330 SOW FIGURE 3 - Cold Room Placement in Turtle Barn Elevation View (1).pdf

PDF 405 KB Posted

Attached to
Installation of Cold Room, Upgrade Electrical Panel, Add Dedicated Electrical Panel & Wire Lights & Outlets for Cold Room, and Install Split System HVAC in Cold Room at NOAA NMFS Galveston, TX
Solicitation number
NF-FN7110-22-01330MWH
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23’WIDE X 8’2” TALL

DOOR

MDBC CORAL PROPAGATION PILOT STUDY

GALVESTON COLD ROOM

ELEVATION LAYOUT OF POTENTIAL

COLD ROOM SIZESSCALE 1:70

3/9/2022 BEN HIGGINS

CAD

Figure 3

EXISTING TANK

Yellow is floor slope ~2” over 20’

Center Line

File details come from the government source that posted it. Updated .