The document provided is an Addendum #3 to the Bidding Documents for the City of Newport, Oregon Water Treatment Plant Pall XR System Improvements project. The addendum outlines changes to the specifications, including updating the responsibilities of the membrane supplier, Aria Filtra, formerly known as Pall Corporation. Aria Filtra will be responsible for procuring some of the components required to install the XR system and will provide certain services during construction, with payments made by the Owner through the Contractor.

The related state and local contract opportunity is for the Water Treatment Plant XR System Improvements project, which consists of constructing an Excess Recirculation system, ground improvements, and a garage. The project is located in Lincoln County and Newberg City, Oregon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Newport, Oregon

Water Treatment Plant Pall XR System Improvements

Bidding Documents

Addendum #3

1/2/2024

The following changes shall be made to the specifica-ons:

• Sec-on 01 10 00, 1.03A.1.a:

o Replace all text with the following:

“The membrane supplier (Pall Corpora-on now doing business as Aria Filtra) will be responsible for procurement of some of the components required to install the XR system as described in Appendix A of the Project Manual and drawing G-

602. Responsibili-es for installa-on of the procured equipment is delineated further in this Sec-on and Sec-on 01 16 00 Owner-Furnished Equipment and in the Drawings. Aria Filtra will serve as an equipment supplier paid through the contractor by a purchase order as described in paragraph 1.05 of this Sec-on.”

• Sec-on 01 10 00, 1.05D.:

o Replace all text with the following:

“As an equipment supplier to the Contractor, Aria Filtra will provide the following services during construc-on. Money due to Aria Filtra for these services will be paid by OWNER through CONTRACTOR as listed in Bid Form.”

o Sub items 1.05D.1. and 1.05D.2. remain unchanged.