New Construction (May 2026) (002).pdf
PDF 90 KB Posted
- Attached to
- Weld County CBOC
- Solicitation number
- 36C24W26R0049
- Issued by
-
Department of Veterans Affairs
About this file
This document is Exhibit H for a Real Property Lease (RLP) No. 36C24W26R0049, establishing new construction requirements and submission standards for federal real estate solicitations.
The exhibit mandates that offerors for new construction projects submit three primary documentation packages. First, a Fire Protection and Life Safety (FPLS) submittal must identify the applicable Building Code and edition to which construction will conform, along with written commitment to meet all mandatory FPLS lease requirements. Second, for projects 10,000 rentable square feet and above, offerors must provide either Leadership in Energy and Environmental Design for New Construction (LEED-NC) Silver certification documentation or Green Globes for New Construction (GG-NC) Two Green Globes level certification documentation. For LEED pursuance, offerors must submit a scorecard or checklist with a statement explaining how each proposed credit will be achieved and identify U.S. Green Building Council LEED Accredited Professionals serving on the project team. For Green Globes pursuance, identification of Green Globes Professionals is optional but must be disclosed if included. Third, offerors must provide a detailed construction schedule delineating permitting, design, and construction phases with completion dates for principal work categories, aligned with the Government's required occupancy date and lease-specified milestones. Additionally, a Department of Labor Wage Determination document is required as part of the RLP documentation package.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP NO. 36C24W26R0049, PAGE 1 VA MODIFIED TEMPLATE R100, NEW
CONSTRUCTION EXHIBIT H (5/26)
RLP EXHIBIT H NEW CONSTRUCTION
NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026)
The following is added to the RLP paragraph titled: “List of RLP Documents” in the table in sub-paragraph A:
Document Name No. of Pages Exhibit DOL Wage Determination
NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026)
The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirements and additional submittals.
Document Name Exhibit H: New Construction
FPLS Submittal for New Construction NC 1.02 A LEED-NC Silver or Green Globes for New Construction (GG-NC) Certification Documentation NC 1.02 B Construction Schedule for New Construction NC 1.02 C
A. Fire Protection and Life Safety (FPLS) Submittal for New Construction. As part of the FPLS Submittal Information, for offers of new construction, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.
B. LEED-NC Silver for New Construction Certification Documentation. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Leadership in Energy and Environmental Design® for New Construction (LEED-NC) credits for Silver level certification. For LEED, this documentation is the LEED-NC scorecard. Along with the proposed scorecard or checklist, the Offeror must submit a brief statement outlining how each of the proposed credits will be achieved. If pursuing LEED-NC, the Offeror must identify the U.S.
Green Building Council LEED Accredited Professionals as team members, including their roles throughout the project.
B. Green Globes for New Construction (GG-NC) Certification Documentation. For projects 10,000 RSF and above, the Offeror must provide documentation of the proposed Green Globes for New Construction (GG-NC) credits for Two Green Globes level certification. If pursuing Green Globes-NC, the Offeror may add GBI Green GlobesProfessionals (GGPs) to the project team, but it is not required. If one or more GGPs are added, the Offeror must identify any GGPs as team members, including their roles throughout the project.
C. Construction Schedule for New Construction. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.
| RLP EXHIBIT H NEW CONSTRUCTION |
| NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026) |
| NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026) |
File details come from the government source that posted it. Updated .