NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx

DOCX document 19 KB Posted

Attached to
Z2DA--T2 DB 442-22-004 Add Lightning Protection to campus (VA-22-00068380)
Solicitation number
36C25922R0089
Issued by

About this file

This document contains a calculation worksheet for self-performed and subcontracted work on a federal construction contract. The solicitation is for design, installation, testing, verification and commissioning of a lightning protection system for multiple buildings and structures at the Cheyenne VA Medical Center campus in Wyoming. Key requirements include installing lightning protection at the Residential Rehabilitation Treatment Program building, three community living centers, an MRI building, eleven additional buildings, photovoltaic parking canopies and an above-ground fueling station. Offerors must perform a minimum of 15% of contract costs using their own employees or the employees of other eligible service-disabled veteran-owned small businesses, and the worksheet provides a template for calculating self-performance.

View the file

Other files

File Type Posted
36C25922R0089 0001.docx DOCX document
Site Specific Lightning Protection Specifications - updated.pdf PDF
3-10-2021 - Past Performance Questionnaire.docx DOCX document
36C25922R0089_1.docx DOCX document
Cheyenne_VAMC_LRA.pdf PDF
Site Specific Lightning Protection Specifications.docx DOCX document
CVAMC Lightning Risk Assessment Data JMEdit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK

IAW VARR 852.219 -10 Limitations on Subcontracting, Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes) of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran-owned small business concerns. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division and name
SDVOSB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $_________________

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $__________________

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$__________________
4. Self-performed work = Line 3/Line 1 x 100 =__________%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

I certify the above representations are true and correct to the best of my knowledge.

___________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)

File details come from the government source that posted it. Updated .