About this file
The document is a Procurement Request Form and Project Overview Form for the Mississippi Department of Marine Resources (DMR), specifically for the Grand Bay National Estuarine Research (NERR) Coastal Resource Center Seal and Weatherize project. The proposed project will take place at the Grand Bay National Estuarine Research Reserve's Coastal Resources Center in Moss Point, MS, with a total projected cost of $150,000. The project aims to remove old rotting wood around building edges, soffits, and windows, and replace it with composite materials to make the building more resilient to storms and pest infestations, using sustainable and innovative materials.
The project's minimum qualifications require bidders to provide three professional references, proof of license and insurance, and experience with construction and weatherization. The scope of work includes removing rotten wood, sealing building edges and windows with expanding foam sealants, and coordinating with the GBNEER Facilities Manager. Deliverables include repaired building areas with specified materials, weekly email coordination, and monthly invoicing. The project is funded through a PAC award (ION 3000040250/2000010765) entitled "Increasing Resilience to Storms and Operational Functionality with Retrofits and Upgrades at Grand Bay National Estuarine Research Reserve's Coastal Resource Center, Part 1".
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADVERTISEMENT_GBNERR SOFFIT PROJECT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement Request Form
□ Purchase □ Work Order □ MOU/MOA □ Other ___________________ Please specify type of request
To be completed and returned to the Procurement Director
Required Information for Procurement
Office/Bureau
Project Manager
Project Name
Funding Source Internal Order or Cost Center Number
Total Projected Cost
Commodities
□ Under $75,000-Quotes □ Over $75,000-Formal
Services
□ Under $75,000-Quotes □ Over $75,000-Formal
Procurement Deadline When do you need it?
Approval (Routed by Procurement)
Project Manager Date
Office Director Date
Grants Bureau Date
Tidelands/GOMESA Date
Procurement Director Date
CSO Date
CFO Date
Date Executive Director
Ayesha Gray (Jul 16, 2025 15:16 CDT)
✔ Invitation to Bid
150000
Rick Burris (Jul 17, 2025 08:45 EDT)
Joe Spraggins (Aug 7, 2025 10:19:30 CDT)
Project Overview Form
Project Summary
Short Summary of project
Scope of Work
Describe, in detail, the minimum requirements that will need to be performed under a resulting contract
Deliverables
Describe the outcome desired to complete the project, including any reporting and invoicing requirements and their frequency
Approval (Routed by Procurement)
Office Director Date
Project Manager Date
Procurement Office Only
Assigned To Date
Notes:
Minimum Qualifications
List any required qualifications, certifications, special equipment, etc. that are mandatory for satisfactory completion of project
Additional Information
NERR_SoffitRepair_Procurement-Request-For m-(Rev2025) Final Audit Report 2025-08-07
Created: 2025-07-16
By: Rick Kinnard (rick.kinnard@dmr.ms.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA7ExjsX9xIvBw_XGbVABBRrldL0MBLHX2
"NERR_SoffitRepair_Procurement-Request-Form-(Rev2025)" Hi story
Document created by Rick Kinnard (rick.kinnard@dmr.ms.gov)
2025-07-16 - 7:50:29 PM GMT
Document emailed to Ayesha Gray (ayesha.gray@dmr.ms.gov) for signature
2025-07-16 - 7:51:21 PM GMT
Email viewed by Ayesha Gray (ayesha.gray@dmr.ms.gov)
2025-07-16 - 8:12:14 PM GMT
Document e-signed by Ayesha Gray (ayesha.gray@dmr.ms.gov) Signature Date: 2025-07-16 - 8:16:14 PM GMT - Time Source: server
Document emailed to Sonja Slater (sonja.slater@dmr.ms.gov) for signature
2025-07-16 - 8:16:17 PM GMT
Email viewed by Sonja Slater (sonja.slater@dmr.ms.gov)
2025-07-16 - 8:27:18 PM GMT
Document e-signed by Sonja Slater (sonja.slater@dmr.ms.gov) Signature Date: 2025-07-16 - 8:31:15 PM GMT - Time Source: server
Document emailed to Rick Kinnard (rick.kinnard@dmr.ms.gov) for signature
2025-07-16 - 8:31:17 PM GMT
Email viewed by Rick Kinnard (rick.kinnard@dmr.ms.gov)
2025-07-16 - 8:32:41 PM GMT
Document e-signed by Rick Kinnard (rick.kinnard@dmr.ms.gov) Signature Date: 2025-07-16 - 8:32:53 PM GMT - Time Source: server
Document emailed to Rick Burris (rick.burris@dmr.ms.gov) for signature
2025-07-16 - 8:32:55 PM GMT
Email viewed by Rick Burris (rick.burris@dmr.ms.gov)
2025-07-16 - 8:33:28 PM GMT
Document e-signed by Rick Burris (rick.burris@dmr.ms.gov) Signature Date: 2025-07-17 - 12:45:40 PM GMT - Time Source: server
Document emailed to Leslie Brewer (leslie.brewer@dmr.ms.gov) for signature
2025-07-17 - 12:45:42 PM GMT
Email viewed by Leslie Brewer (leslie.brewer@dmr.ms.gov)
2025-07-17 - 12:45:59 PM GMT
Document e-signed by Leslie Brewer (leslie.brewer@dmr.ms.gov) Signature Date: 2025-07-17 - 1:14:48 PM GMT - Time Source: server
Document emailed to Joe Spraggins (joe.spraggins@dmr.ms.gov) for signature
2025-07-17 - 1:14:50 PM GMT
Email viewed by Joe Spraggins (joe.spraggins@dmr.ms.gov)
2025-07-17 - 9:22:08 PM GMT
Email viewed by Joe Spraggins (joe.spraggins@dmr.ms.gov)
2025-08-07 - 12:54:07 PM GMT
Document e-signed by Joe Spraggins (joe.spraggins@dmr.ms.gov) Signature Date: 2025-08-07 - 3:19:30 PM GMT - Time Source: server
Agreement completed.
2025-08-07 - 3:19:30 PM GMT
| Project Manager: Ayesha Gray |
| Funding Source Internal Order or Cost Center Number: 2000010765 |
| Project Short Summary: The proposed project will take place at the Grand Bay National Estuarine Research Reserve (GNDNERR) Coastal Resources Center in Moss Point, MS. The project will accomplish the following goal: to remove old rotting wood around windows and soffits, and seal and weatherize those areas of the building to make it more resilient to storms and resistant to pest infestations. Throughout the proposed project resilient and sustainable design components and materials will be used such as composite lumber to seal and weatherize. |
| Statement of Work Describe: 1.1 Remove all rotten wood along building edges, soffits and windows and dispose of and replace with composite material (when possible) resistant to wood rot and water damage that matches the color and character of existing building features. Where composite materials are not available in needed sizes, treated lumber will be used and fascia boards will be wrapped in metal to match existing roof flashing. |
1.2 Seal all building edges, gaps in soffits and around windows with expanding foam such as FROTH-PAK Spray Foam Sealant by Dupont (see relevant information here) or other equivalent material to ensure the building is fully weatherized and protected from pest infestations.
1.3 Contractor will coordinate all activities with GBNERR Facilities Manager including regular visual inspections of work progress and provide regular written (by email) updates weekly.
Deliverables: Repaired building in specific areas identified in Figure 1 with specified materials Coordination with Facilities Manager on all work Weekly updates by email Monthly invoicing
| Minimum Qualifications: Bidders will provide three professional references and proof of license and insurance. Experience with construction, weatherizing is required. |
| Additional Information: The proposed project will retrofit the building in the areas specified in Figure 1 to remove rotting wood and replace with composite or other durable material to seal, weatherize, and improve resilience to water/wind damage and prevention of pest infestations. To accomplish this sealing and weatherizing, we aim to use the latest innovations in sustainable and eco-friendly materials including composite wood (resistant to fire and rot) and expanding foam sealants that are made with sustainable non-toxic ingredients (e.g., FROTH-PAK Spray Foam Sealant by Dupont, see relevant information here). |
Description directly from the PAC award (ION 3000040350/2000010765) entitled "Increasing Resilience to Storms and Operational Functionality with Retrofits and Upgrades at Grand Bay National Estuarine Research Reserve’s Coastal Resource Center, Part 1"
| Notes: | |
| Office/Bureau: Grand Bay NERR | |
| Project Name: Coastal Resource Center Seal and Weatherize | |
| 2025-08-07T15:19:36+0000 | |
| Certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .