NCR MATOC Rate Sheet v2.pdf
PDF 101 KB Posted
- Solicitation number
- W51EW72-6-R-NCR2-SOW2
- Issued by
-
Department of the Army
About this file
This document is a Rate Sheet for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC) with RFP # W51EW7-25-R-A006. The rate sheet provides Not-To-Exceed (NTE) hourly rates for professional labor categories across a five-year base ordering period and two option years, specifically for labor categories including Program Manager, Project Superintendent, and Quality Control Inspector. The rates are fully burdened with fringe benefits and apply to professional labor categories not subject to the Construction Wage Rate Requirements Statute.
The rate sheet includes two key tables: one for NTE hourly rates across years and another for applied percentages for General & Administrative (G&A) and Profit categories. Notably, G&A and Profit percentages are set at 0.0% for all years, and bonds are to be calculated as a pure cost with no additional overhead, profit, or G&A applied. The document emphasizes that these rates will be incorporated into the base contract, and contractors may quote rates lower than but not exceeding the stated rates when preparing Task Order price proposals. Individual Task Orders may include all, some, or none of these rate categories based on specific requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT NCR MATOC SOW 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Category N T
E H ou rl y R at es
B as ic
Y ea r
N T
E H ou rl y R at es
B as ic Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R
O pt io n Y ea r
N T
E H ou rl y R io n Y ea r
Program Manager
Project Superintendant
Quality Control Inspector
Category N T
E A pp lie d Pe rc en ta ge
B as ic Y ea r
N T
E A pp lie d Pe rc en ta ge
B as ic Y ea r
N T
E A pp lie d Pe rc en ta ge ic
Y ea r
N T
E A pp lie d Pe rc en ic
Y ea r
N T
E A pp lie d Pe rc en ic
Y ea r
N T
E A pp lie d Pe rc en io n Y ea r
N T
E A pp lie d Pe rc en ta ge
O pt io n
Y ea r
G&A (Applied to total cost less bonds) Profit (Applied to total cost to include G&A less bonds)
Five (5) Year Base Ordering Period
Five (5) Year Base Ordering Period
Bonds shall only be cost, no profit, G&A or overhead allowed on bonding
NOTE: These rates will be incorporated into the base contract and all rates in this attachment shall be Not To Exceed (NTE) rates the offerors will use when preparing Task Order price proposals. Contractors may quote less than the stated rates but are not to exceed what is in this attachment for each Task Order. Based on individual task Order Requirements, task Orders may include all, some or none of these rate categories.
Attachment XX - Rate Sheet National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
RFP # W51EW7-25-R-A006
Professional Labor Category Rate Requirements- Not Subject to the Construction Wage Rate Requirements Statute
All rates are NTE per year and are hourly rates and are fully burdened w/Fringe Benefits. *Fully burdened hourly labor rates for the six (6) month extension of services option ordering period will be the same as the fully burdened hourly rate for the option year two (2) ordering period
Sheet1
| Text1: |
| Text2: |
| Text3: |
| Text10: |
| Text12: |
| Text13: |
| Text14: |
| Text9: |
| Text8: |
| Text7: |
| Text6: |
| Text5: |
| Text4: |
| Text15: |
| Text16: |
| Text21: |
| Text20: |
| Text19: |
| Text18: |
| Text17: |
| Text11: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
File details come from the government source that posted it. Updated .