26-02193 Requirements and Specifications.pdf

PDF 173 KB Posted

Attached to
NIST NB688000-26-02193 EIMAC Vacuum Tubes
Solicitation number
NB688000-26-02193_EIMAC_Vacuum_Tubes
Issued by

About this file

This is a Requirements/Specifications document for vacuum tubes needed by the National Institute of Standards and Technology (NIST), Physics Measurement Laboratory (PML), Time & Frequency Division.

NIST requires reliable vacuum tubes for the WWV and WWVB radio transmitters to broadcast at frequencies of 2.5, 5, 10, 15, 20, and 25 MHz as well as 60 kHz. The specific tube models required are the 4-400C, 4CX5000A, and 4CX15000A, with warranty coverage of 12 months/3500 hours prorated for the 4-400C, 12 months/10,000 hours prorated for the 4CX5000A, and 12 months/5000 hours prorated for the 4CX15000A. Delivery must be completed within 2 weeks after receipt of order (ARO) and requires direct delivery to the building via UPS or FedEx; the tubes are small enough to fit in one or two boxes and can be handed off to station staff. No planning site visits, electronic media, installation services, facility utilities, training, inspection and acceptance testing, maintenance, government-furnished materials, or travel are required. Item-specific quantities and detailed specifications are referenced in an attached Word document. The document is a template version 1.0 from 2019 and does not specify pricing terms, set-asides, response dates, or award dates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

Requirements / Specifications: WWV WWVB Vacuum Tubes 1 Version 1.0 (2019) Double-click on for further assistance.

Use this document to detail specifications/requirements for an item and/or ancillary services.

TITLE: WWV WWVB Vacuum Tubes Requesting Lab/Division/Group: PML / Time & Frequency Division / Time Realization and Distribution Group

General Statement of Need The transmitters at WWV and WWVB require reliable tubes that provide a consistent broadcast of the following frequencies: 2.5, 5, 10, 15, 20, and 25 MHz as well as 60 kHz.

Items and/or Ancillary Services

Item 1: See Word doc (attachment) Quantity: [Enter quantity here.] Specifications: [List specifications here as Specification 1.1, Specification 1.2, etc.

Separately Priced Options and Services:

Item 2: [List minimum specifications.

Quantity: [Enter quantity here.] Specifications: [Enter quantity here.]

[List any other item(s) or service requirements here using the same format above.]

Service Requirements / Item Specifications

Section Requirements/Specifications Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote]

Shipping & Delivery ☐ N/A

[Enter shipping and delivery information by item here.] Shipping criteria:

☐ Partial delivery acceptable ☒ Direct delivery to building required Shipping criteria: Direct delivery to building, These tubes are not huge and may come in one box or two boxes and can easily be handed off to station staff by UPS or FedEx.

Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria:

Requirements / Specifications: WWV WWVB Vacuum Tubes 2

☒ Delivery of goods, installation, and training shall be completed no later than: 2 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other:

Electronic Media ☒ N/A

[Enter electronic media requirements by item here.] ☐ Software ☐ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here]

Installation ☒ N/A

[Enter installation requirements by item here.] ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other [Enter details here.] Note: When installation is required, TPOC or COR shall be the coordination point.

Facility / Utility Considerations ☒ N/A

[List site specific utility considerations by item here.] ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate quote]

Requirements / Specifications: WWV WWVB Vacuum Tubes 3

Warranty ☐ N/A

[Choose warranty type here.] [If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.] What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☒ Warranty length: [Enter warranty length here] Period Length:4-400C - 12 MONTHS / 3500 HOURS PRORATED

4CX5000A - 12 MONTHS / 10000 HOURS PRORATED

4CX15000A - 12 MONTHS / 5000 HOURS PRORATED

Training ☒ N/A

[Training requirements (who, when, what, where) here. If on-site, is travel necessary?] ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training:

☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point.

Inspection and Acceptance ☒ N/A

[Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☐ Gov’t acceptance expected to take longer than 7 business days: [Duration] ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here]

Maintenance ☒ N/A

[Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included?

☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.)

☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4

Government Furnished Material / Equipment ☒ N/A

[List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equipment which will leave gov't site (TPOC must coordinate with division property custodian) Serial Number: [Enter Serial Number here] Description: [Enter description here]

Requirements / Specifications: WWV WWVB Vacuum Tubes 4

NIST property number: [Enter NIST property number here] ☐ Other: [Enter other details here]

Travel ☒ N/A

[Describe any travel requirements per item here] ☐ Explain: [Explain here] ☐ Other: [Enter other requirements here] Vendor: To the maximum extent possible, include as part of appropriate sections above (maintenance, repair, etc.). Otherwise, it will be a separate line item, reimbursable per the Federal Travel Regulation.

Provide suggestions to improve this form by clicking here.

https://oaam.nist.gov/OAAMAcquisitions/FormFeedback/default.aspx

Use this document to detail specifications/requirements for an item and/or ancillary services.
TITLE: WWV WWVB Vacuum Tubes
Requesting Lab/Division/Group: PML / Time & Frequency Division / Time Realization and Distribution Group
General Statement of Need
Provide suggestions to improve this form by clicking here.

File details come from the government source that posted it. Updated .