Sheet1
| Attachment E - RFQ Question Submittal Form | ||||||
| Question No. | RFP Attachment No. | REFERENCE | QUESTION | GOVERNMENT RESPONSE | ||
| Page | Section | Para. | ||||
| 1 | 2(SOW) | 2 | 1 | b | Are electric door closures on the chambers acceptable? | Yes, electric closing mechanisms are permissable. |
| 2 | 2(SOW) | 2 | 1 | c | Is an air exchange or airflow required for the chambers? | There is no strict requirement. Air ciculation is for comfort only (and not to cool equipment). |
| 3 | 2 (SOW) | 3 | 1 | d.1 | Is the power line filtering required to be UL approved? | UL Certification is not required on the power filters. |
| 4 | 2(SOW) | 12 | 5 | b | Can the stirrers be horizontal? | The stirrers shall be the orientation specified in the SOW |
| 5 | 2(SOW) | 10 | 4 | b | Is velcro an acceptable adhesive for the anechoic absorber material? | Hook and loop fasteners (e.g., Velcro) material is one possibility. The method of fastener the absorber will be evaluated as part of the technical approach. |
| 6 | 2(SOW) | 11 | 4 | j | For the required 12" x 12" removable apeture, will this cause noise interference if the apeture is open? | This opening should not impact the overall shielding of the two chambers together. |
| 7 | 2(SOW) | 11 | 4 | f | Does the flooring absorber material have to be rubber coated? | No. |
| 8 | 2(SOW) | Are there any color restrictions on the chambers? | There are no color preferences. | |||
| 9 | 2(SOW) | 2 | 1 | a | Can the contractor attach things to the concrete floor? | As described in the SOW, the contractor may anchor the chambers to the existing concrete floor |
| 10 | 2(SOW) | 3 | 1 | c | Can the air vents be located on the top of the chambers? | If the chamber is up against the ceiling tiles, there should not be a vent on the ceiling of the chamber. |
| 11 | 2(SOW) | Is there any special NIST training reqired for the contractor? | No special NIST training is required, however contractors are expected to follow safe work practices. | |||
| 12 | 2(SOW) | ? | Does NIST have a preference on the type of display controllers used? | No preference. | ||
| 13 | 2(SOW) | 3 | 1 | c | Can the contractor tie into the existing HVAC of the building? | No. |
| 14 | Is the contractor responsible for preparing the room for installation (HVAC, electrical, moving of fire suppresion)? | NIST will prepare the room ahead of the chamber installation | ||||
| 15 | Can the contractor use the front doors of Bldg 3 for accessing the building? | Yes, provided the floor is protected from scuffing and damage | ||||
| 16 | Can the contractor store materials on-site? | With advance notice, this can be arranged. | ||||
| 17 | 2(SOW) | 5 | 2 | a | What is the name of the NIST authorized Fire Suppression company and who is the point of contact? | Tech Electronics, 1351 West 121st Ave, Denver, CO 80234, 303-438-8088 |
| 18 | 2(SOW) | Are the chambers required to be moveable? | No. All four chambers will be fixed. |