This is Amendment 0003 to solicitation NAVMWR-25-R-0007 for installation of a wave attenuator at Joint Base Pearl Harbor-Hickam (JBPHH), issued by CNIC Facilities and Construction Contracting. The amendment extends the Request for Offer closing date to March 6, 2025 and replaces Section J-14 Wage Determination with an updated version.

The amendment provides clarifications through Q&A, confirming that the wave attenuator length shall be 300 feet within a maximum extent area of 538 feet, concrete anchor blocks are acceptable for moorage, contractors must provide detailed pricing breakdowns, and contractors are responsible for obtaining all permits including NPDES. Other key clarifications include: the intended equipment life span is 15 years, funding is confirmed, water quality monitoring and marine mammal/endangered species monitoring are required during construction with 160 hours allocated for work stoppages, Hawaii Excise Tax (4.712%) must be included in proposals, and no bid bond is required. The amendment also includes updated Davis-Bacon Act wage determinations for Hawaii.

View the file

Other files

File Type Posted
NAVMWR-25-R-0007-0004.pdf PDF
NAVMWR-25-R-0007-0002.pdf PDF
NAVMWR-25-R-0007-0001.pdf PDF
NAVMWR-25-R-0007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

1 5

0003 20 FEB 2025 R20-20 R20-20

N944

CNIC Facilities and Construction Contracting A'Keesha Stark, Contracting Officer 5720 Integrity Drive, Lassen Building 457 Millington, TN 38055 901-874-6680 / akeesha.r.stark.naf@us.navy.mil

Nika Maldonado, Contract Specialist 901-930-7728 nika.n.maldonado.naf@us.navy.mil

NAVMWR-25-R-0007

29 January 2025

Install Wave Attenuator

JBPHH, HI

Continued on page 2.

A'Keesha Stark, Contracting Officer

Block 14 Continued:

A. Changes:

1. Reference Section L-23.C.

The Request for Offer Closing Date is extended to 6 March 2025.

2. Section J-14. Wage Determination is deleted in its entirety and replaced with Attachment A.

B. Clarifications:

Q-1. Please clarify the linear footage of the attenuator as the Statement of work states “floating wave attenuator system is approximately 300 feet long” yet Section J shows a dimension of 150” on one side and a dimension of 200” on the other side, in between those two dimensions in section J is a radius measures approximately 205” which would be a total length of 600”.

A-1. The length of the wave attenuator shall be 300’. The area that can be included is shown on the map (538’) is the maximum extent of the wave attenuator. What this means is that the arched portion (111’) and the balance (189’) shall be in one side or the other side of the straight sections, not to exceed 300’.

Q-2. According to the Statement of Work the wave attenuators secure to the ocean floor. Are concrete anchor blocks acceptable for moorage?

A-2. Yes, concrete anchor blocks is acceptable for moorage.

Q-3. Section B, Paragraph B-3.B states “The breakdown of lump sums offered in Section B shall be in sufficient detail to permit an analysis of (1) material, (2) labor, (3) equipment, (4) subcontract, and (5) overhead costs as well as profit.” Will CNIC provide a revised bid form that provides a format to detail this information in the proposals?

A-3. No, Offerors will include with Section B a breakdown of pricing that shall be in sufficient detail to permit an analysis of materials, labor, equipment, subcontract, overhead, and profit.

Q-4. Section C, Paragraph B.a states the definition of “Base” is Naval Support Activity Hampton Roads. Please confirm that the “Base” for this contract is Joint Base Pearl Harbor- Hickam.

A-4. The Base is Joint Base Pearl Harbor-Hickam.

Q-5. Section C, Paragraph D.1 states that NAFI has obtained approvals through ACOE, NOAA, DOH Water, and NAVFAC Environmental. Please provide copies of all permit documents that NAFI has for this project and confirm what additional permits, if any, the Contractor is required to obtain for this project.

A-5. Copies of all permits obtained by the NAFI will be provided to the awarded contractor, this is a Design/Build project and it is the responsibility of the awarded contractor to ensure that all permits are obtained and current. The NAFI is not responsible for permits.

Q-6. Section C, Paragraph D.1 states that NAFI has obtained approvals through ACOE, NOAA, DOH Water, and NAVFAC Environmental. Please confirm if the Contractor is responsible for obtaining the National Pollution Discharge Elimination System permit or will the Government provide this permit.

A-6. Confirmed, the contractor is responsible for obtaining the NPEDS permit.

Q-7. Section C, Paragraph C-1 states that the design life required for the facility shall be at least 15 years. Section H, Paragraph A states that the intended life span of the wave attenuator is 20 years. Please confirm the intended life span for this project.

A-7. 15 years is the intended life span of the equipment.

Q-8. Section H, Paragraph H-1.A states “This is a Navy Non-Appropriated Fund (NAF) procurement and is not funded by any Appropriated Funds of the United States. No appropriated funds of the Unites States shall be obligated, due or payable as a result of this contract. Please confirm that funding is in place for this project.

A-8. Confirmed

Q-9. Section H, Paragraph H-33 states that the contractor shall provide and maintain environmental protection during contract period and that contractors shall comply with all Federal, State, and local regulations pertaining to water, air, solid waste, and noise pollution.

Will this project require Water Quality Monitoring in accordance with the State of Hawaii, Department of Health, Clean Water Branch? Will this project require Marine Mammal and/or Endangered Species Act monitors throughout in-water construction activities? If yes to either question, please provide requirements for these environmental monitoring activities.

A-9. Yes to both questions. The water quality requires sampling before work starts, sampling during work and samples at work completion among other requirements. These are available from DOH CWB. On previous projects in the area, Mammal/Endangered Species Monitoring, applies to any in-water work, involves having a person observing whether any endangered species enter the area and then alerting the crews to stop work until the animal leaves the area on its own. It cannot be encouraged to leave. The contract requires that the contractor verify any requirements.

Q-10. Section I, Paragraph I-20 outlines the taxes that the Contractor is required to include in the proposal. Please confirm that the Contractor is required to include the 4.712% Hawaii General Excise Tas (HIGET) in their proposals.

A-10. All offerors shall include HET (Hawaii Excise Tax) in their proposals.

Q-11. Section I, Paragraph I-71 includes the requirements for Payment and Performance Bonds;

however, there is no discussion on a Bid Bond. Please confirm that a Bid Bond is not required for this project.

A-11. Confirmed.

Q-12. Please define the desired wave transmission and other desired performance criteria within the marina following installation of the new wave attenuator.

A-12. The requirement is discussed in the studies provided.

Q-13. Section J-10 contains the Wind-Wave Interaction Study performed by Buchart Horn, Inc.

in November 2016. Is the selected Contractor allowed to use this study as the basis for its design or will the Contractor be required to prepare its own analysis and submit its own study on which its design is based?

Q-13. All information provided by the government are for information only despite being produced 1 day or 8 years prior. Verification of the information by the contractor is highly encourage.

Q-14. Our design firm has reviewed RFP Section C-3 Design Requirements and determined that new wave attenuator, a “whisper wave” product (or equal) required by RFP Section C-3, D.2.

Purchase and Installation of Wave Attenuator will not meet the design requirements. Please confirm that Contractor can provide a wave attenuator system that provides sufficient wave attenuating capacity that meets the Design Requirements even though it may not be equal to a “whisper wave” system.

A-14. Confirmed, it is the responsibility of the offeror to propose a product that meets (or exceeds) the intended design requirements.

Q-15. RFP Section C-4 General Construction Requirements, paragraph A.8. states: “Should any endangered species enter the area work will be stopped until the endangered animal has left the project area on its own accord. “Since Pearl Harbor is known for having an active Green Sea Turtle population, the time delay for endangered species entering the work area may be significant. Please advise how the Contractor will be compensated for any delays due to any endangered species entering the work area since it’s impossible to quantify this prior to submitting the proposal. At the very least, please provide the total hours of delay Contractors should account for in preparing their proposals.

A-15. Include and allowance of 160 hours of work stoppage due to Endangered Species Work Stoppage to include time to document the siting, species and time that work was stopped.

Q-16. Reference RFP Section C-2 Project Information, D. Project Description:

RFP Section C-2 Project Information, D. Project Description states: “The project includes installing a new floating wave attenuator system that is approximately 300 feet long and securing it to the ocean floor in the configuration noted herein.”

RFP Attachment J-7 Dimensioned Wave Attenuator Layout (see below) shows a total length for wave attenuator of approximately 538 feet including the 120 feet radius x 90-degree arc section.

This is significantly longer than 300 feet. Please confirm the required length of the new floating wave attenuator system.

A-16. The length of the wave attenuator shall be 300’. The area that can be included is shown on the map (538’) is the maximum extent of the wave attenuator. What this means is that the arched portion (111’) and the balance (189’) shall be in one side or the other side of the straight sections, not to exceed 300’.

Q-17. Since this is a design-build project with a unique scope of work that requires a significant pre-proposal design effort to confirm adequacy of wave attenuator system to meet the design parameters, please consider extending the bid date 6 weeks.

A-17. Solicitation will not be extended 6 weeks but see above, for extension to 6 March 2025.

Q-18. Reference RFP Section J, Attachment J-10 Wind-Wave Interaction Study prepared by Buchart Horn, Inc., dated November 2016. The design wave height has not been clearly defined in the Wind-Wave Interaction Study. Table 4. Recommended Design Waves shown below provides wave heights for two conditions.

The paragraph prior to the above Table 4. states:

Section C-2 Project Information, 2. Purchase and Installation of Wave Attenuator, paragraph b.

states: “The attenuation system shall be able to withstand the greater of; waves at least 4’ high or as called for in the wind wave analysis.” For bidding purposes, please confirm the selected Contractor is required to use the Wind-Wave Interaction Study prepared by Buchart Horn, Inc., dated November 2016 as the basis for its design. Also, given the ambiguous design wave height language included in the RFP documents, please clearly specify the design wave height to be used for the proposal (i.e., 3.0 ft, 3.3 ft, 4.0’, 5.4 ft, or other).

A-17. Contract states to comply with all applicable UFCs and the information enclosed in the RFI indicates a Recommended Wave Height listed in UFC3-301-01. Again, information provided by the government is for information only and the proposer is required to verify the information.

A A

"General Decision Number: HI20250001 02/14/2025

Superseded General Decision Number: HI20240001

State: Hawaii

Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential

Counties: Hawaii Statewide.

BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION PROJECTS

(consisting of single-family homes and apartments up to and including 4 stories); HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS AND DREDGING

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

If the contract is entered into on or after January 30, 2022, or the contract is renewed or extended (e.g., an option is exercised) on or after January 30, 2022:

• Executive Order 14026 generally applies to the contract.

• The contractor must pay all covered workers at least $17.75 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025.

If the contract was awarded on or between January 1, 2015 and January 29, 2022, and the contract is not renewed or extended on or after January 30, 2022:

• Executive Order 13658 generally applies to the contract.

• The contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on that contract in 2025.

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

NAVMWR-25-R-0007 Install Wave Attenuator

JBPHH, HI

SECTION J Page 72 of 92

Modification Number Publication Date 0 01/03/2025 1 01/24/2025 2 01/31/2025 3 02/14/2025

ASBE0132-001 09/01/2024

Rates Fringes Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls......................................................................$ 45.80 30.35

* BOIL0627-005 01/01/2025

Rates Fringes BOILERMAKER..................................................................$ 49.37 31.25

BRHI0001-001 09/05/2023

Rates Fringes

BRICKLAYER

Bricklayers and Stonemasons…………………………..$ 48.03 32.23 Pointers, Caulkers and Weatherproofers...............................................................$ 48.28 32.23

BRHI0001-002 09/05/2023

Rates Fringes Tile, Marble & Terrazzo Worker Terrazzo Base Grinders.....................................................$ 44.69 33.00 Terrazzo Floor Grinders and Tenders.......................................................................$ 43.14 33.00 Tile, Marble and Terrazzo Workers.............................................................................$ 46.50 33.00

CARP0745-001 10/01/2021

Rates Fringes

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 73 of 92

Carpenters:

Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;

Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........................................................$ 51.25 24.84 Millwrights and Machine Erectors.............................................................................$ 51.50 24.84 Power Saw Operators (2 h.p. and over)....................................................................$ 51.40 24.84

CARP0745-002 09/04/2023

Rates Fringes Drywall and Acoustical Workers and Lathers..............................................................$ 53.00 27.74

ELEC1186-001 08/25/2024

Rates Fringes Electricians:

Cable Splicers...................................................................$ 62.77 32.46 Electricians.......................................................................$ 55.55 32.25 Telecommunication worker..............................................$ 40.00 15.50

ELEC1186-002 08/25/2024

Rates Fringes Line Construction:

Cable Splicers...................................................................$ 62.77 32.46 Groundmen/Truck Drivers................................................$ 41.66 26.50 Heavy Equipment Operators.............................................$ 50.00 29.90 Linemen.............................................................................$ 55.55 32.25 Telecommunication worker...............................................$ 40.00 15.50

ELEV0126-001 01/01/2024

Rates Fringes ELEVATOR MECHANIC.....................................................$ 70.90 37.885+a+b

a. VACATION: Employer contributes 8% of basic hourly rate for 5 year’s service and 6% of basic hourly rate for 6 months to 5 year’s service as vacation pay credit.

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 74 of 92

ENGI0003-002 09/02/2024

Rates Fringes Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)....................................................$ 78.96 36.825 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)………………………………..$ 69.59 36.825 Stand-by Diver (Aqua Lung) (Scuba)............................................................................$ 60.21 36.825 Diver (Other than Aqua Lung) Diver (Other than Aqua Lung)................................................................................$ 78.96 36.825 Diver Tender (Other than Aqua Lung).............................$ 57.18 36.825 Stand-by Diver (Other than Aqua Lung)..........................$ 60.21 36.825 Helicopter Work Airborne Hoist Operator for Helicopter.............................$ 58.76 36.825 Co-Pilot of Helicopter........................................................$ 58.90 36.825 Pilot of Helicopter..............................................................$ 59.07 36.825 Power equipment operator -tunnel work GROUP 1..........................................................................$ 55.20 36.825 GROUP 2..........................................................................$ 55.31 36.825 GROUP 3..........................................................................$ 55.48 36.825 GROUP 4..........................................................................$ 55.75 36.825 GROUP 5..........................................................................$ 56.06 36.825 GROUP 6..........................................................................$ 56.71 36.825 GROUP 7..........................................................................$ 57.03 36.825 GROUP 8..........................................................................$ 57.14 36.825 GROUP 9..........................................................................$ 57.25 36.825 GROUP 9A.......................................................................$ 57.48 36.825 GROUP 10.........................................................................$ 57.54 36.825 GROUP 10A......................................................................$ 57.69 36.825 GROUP 11.........................................................................$ 57.84 36.825 GROUP 12.........................................................................$ 58.20 36.825 GROUP 12A......................................................................$ 58.56 36.825 Power equipment operators:

GROUP 1..........................................................................$ 54.90 36.825 GROUP 2..........................................................................$ 55.01 36.825 GROUP 3..........................................................................$ 55.18 36.825 GROUP 4..........................................................................$ 55.45 36.825 GROUP 5..........................................................................$ 55.76 36.825 GROUP 6..........................................................................$ 56.41 36.825 GROUP 7..........................................................................$ 56.73 36.825 GROUP 8..........................................................................$ 56.84 36.825 GROUP 9..........................................................................$ 56.95 36.825 GROUP 9A.......................................................................$ 57.18 36.825 GROUP 10.........................................................................$ 57.24 36.825

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 75 of 92

GROUP 10A...................................................................$ 57.39 36.825 GROUP 11......................................................................$ 57.54 36.825 GROUP 12......................................................................$ 57.90 36.825 GROUP 12A....................................................................$ 58.26 36.825 GROUP 13......................................................................$ 55.18 36.825 GROUP 13A....................................................................$ 55.45 36.825 GROUP 13B....................................................................$ 55.76 36.825 GROUP 13C....................................................................$ 56.41 36.825 GROUP 13D....................................................................$ 56.73 36.825 GROUP 13E.....................................................................$ 56.84 36.825

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Fork Lift (up to and including 10 tons); Partsman (heavy duty repair shop parts room when needed).

GROUP 2: Conveyor Operator (Handling building material); Hydraulic Monitor; Mixer Box Operator (Concrete Plant).

GROUP 3: Brakeman; Deckhand; Fireman; Oiler; Oiler/Gradechecker; Signalman;

Switchman; Highline Cableway Signalman; Bargeman; Bunkerman; Concrete Curing Machine (self-propelled, automatically applied unit on streets, highways, airports and canals);

Leveeman; Roller (5 tons and under); Tugger Hoist.

GROUP 4: Boom Truck or dual purpose ""A"" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction); Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).

GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines (""Bank"" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete Guns;

Lubrication and Service Engineer (Grease Rack); Screedman.

GROUP 6: Boom Truck or Dual Purpose ""A""Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4 cu. yd.); Concrete Batch Plants (wet or dry); Concrete Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals);

Conveyor or Concrete Pump (Truck or Equipment Mounted); Drilling Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis Internal Full Slab Vibrator (on airports, highways, canals and warehouses);

Man or Material Hoist; Mechanical Concrete Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast Concrete Cleaning Machine;

Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo Operator (setting slip forms, etc., in tunnels); Rollers (over 5 tons); Self-propelled Compactor (single engine); Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 76 of 92 forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform (50 feet of platform or less).

GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John Deere 450, and similar); Dual Drum Mixer, Extend Lift; Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu. yds. up to and including 6 yards.); Mechanical Finisher or Spreader Machine (asphalt), (Barber Greene and similar) (Screedman required); Mine or Shaft Hoist; Mobile Concrete Mixer (over 5 tons);

Pipe Bending Machine (pipelines only); Pipe Cleaning Machine (tractor propelled and supported); Pipe Wrapping Machine (tractor propelled and supported); Roller Operator (Asphalt); Self-Propelled Elevating Grade Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.); Water Tanker (pulled by Euclids, T- Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).

GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing); Cast-in-Place Pipe Laying Machine; Concrete Batch Plant (multiple units); Conveyor Operator (tunnel); Deckmate; Dozer (D-6 and similar); Finishing Machine Operator (airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine (Conveyor-type);

No-Joint Pipe Laying Machine; Portable Crushing and Screening Plant; Power Blade Operator (under 12); Saurman Type Dragline (up to and including 5 yds.); Stationary Pipe Wrapping, Cleaning and Bending Machine; Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial Platform (over 50 feet of platform).

GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor Loaderand Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).

GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including 20 cu. yds); Self-propelled Compactor with Dozer; Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu.

yds) (621 Band and similar); Sheep's Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).

GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper (Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu. yds.); Self-propelled, rubber-tired Earthmoving Equipment (over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar);

Soil Stabilizer (P & H or equal); Sub-Grader (Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper); Watch Engineer.

GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons);

Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (up to and including 1 cu.

yd.); Dozer D9-L; Dozer (D-10, HD41 and similar) (all attachments); Gradall (up to and including 1 cu. yd.); Hydraulic Backhoe (over 3/4 cu. yds. up to and including 2 cu. yds.);

Mobile Truck Crane Operator (up to and including 25 tons) (Mobile Truck Crane Driver

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 77 of 92

Required); Self-propelled Boom Type Lifting Device (Center Mount) (up to and including 25 tons) (Grove, Drott, P&H, Pettibone and similar; Trencher (over 6 feet and 750 h.p. or more);

Watch Engineer (steam or electric).

GROUP 11: Automatic Slip Form Paver (concrete or asphalt); Band Wagon (in conjunction with Wheel Excavator); Cable-operated Crawler Cranes (over 25 tons but less than 50 tons);

Cable-operated Power Shovel, Clamshell, Dragline and Backhoe (over 1 cu. yd. up to 7 cu.

yds.); Gradall (over 1 cu. yds. up to 7 cu. yds.); DW-10, 20, etc. (Tandem); Earthmoving Machines (multiple propulsion power units and 2 or more Scrapers) (up to and including 35 cu.

yds.,"" struck"" m.r.c.); Highline Cableway; Hydraulic Backhoe (over 2 cu. yds. up to and including 4 cu. yds.); Leverman; Lift Slab Machine; Loader (over 12 cu. yds); Master Boat Operator; Mobile Truck Crane Operator (over 25 tons but less than 50 tons); (Mobile Truck Crane Driver required); Pre-stress Wire Wrapping Machine; Self-propelled Boom-type Lifting Device (Center Mount) (over 25 tons m.r.c); Self-propelled Compactor (with multiple-ropulsion power units); Single Engine Rubber Tired Earthmoving Machine (with Tandem Scraper);

Tandem Cats; Trencher (pulling attached shield).

GROUP 12: Clamshell or Dipper Operator; Derricks; Drill Rigs; Multi-Propulsion Earthmoving Machines (2 or more Scrapers) (over 35 cu. yds ""struck""m.r.c.); Operators (Derricks, Piledrivers and Cranes); Power Shovels and Draglines (7 cu. yds. m.r.c. and over);

Self-propelled rubber-tired Earthmoving equipment (over 31 cu. yds.) (657B and similar);

Wheel Excavator (up to and including 750 cu. yds. per hour); Wheel Excavator (over 750 cu.

yds. per hour).

GROUP 12A: Dozer (D-11 or similar or larger); Hydraulic Excavators (over 4 cu. yds.);

Lifting cranes (50 tons and over); Pioneering Dozer/Backhoe (initial clearing and excavation for the purpose of providing access for other equipment where the terrain worked involves 1-to- 1 slopes that are 50 feet in height or depth, the scope of this work does not include normal clearing and grubbing on usual hilly terrain nor the excavation work once the access is provided); Power Blade Operator (Cat 12 or equivalent or over); Straddle Lifts (over 50 tons);

Tower Crane, Mobile; Traveling Truss Cranes; Universal, Liebher, Linden, and similar types of Tower Cranes (in the erection, dismantling, and moving of equipment there shall be an additional Operating Engineer or Heavy Duty Repairman); Yo-Yo Cat or Dozer.

GROUP 13: Truck Driver (Utility, Flatbed, etc.)

GROUP 13A: Dump Truck, 8 cu.yds. and under (water level); Water Truck (up to and including 2,000 gallons).

GROUP 13B: Water Truck (over 2,000 gallons); Tandem Dump Truck, over 8 cu. yds. (water level).

GROUP 13C: Truck Driver (Semi-trailer. Rock Cans, Semi-Dump or Roll-Offs).

GROUP 13D: Truck Driver (Slip-In or Pup).

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 78 of 92

GROUP 13E: End Dumps, Unlicensed (Euclid, Mack, Caterpillar or similar); Tractor Trailer (Hauling Equipment); Tandem Trucks hooked up to Trailer (Hauling Equipment)

BOOMS AND/OR LEADS (HOURLY PREMIUMS):

The Operator of a crane (under 50 tons) with a boom of 80 feet or more (including jib), or of a crane (under 50 tons) with leads of 100 feet or more, shall receive a per hour premium for each hour worked on said crane (under 50 tons) in accordance with the following schedule:

Booms of 80 feet up to but not including 130 feet or Leads of 100 feet up to but not including 130 feet 0.50

Booms and/or Leads of 130 feet up to but not including 180 feet 0.75 Booms and/or Leads of 180 feet up to and including 250 feet 1.15 Booms and/or Leads over 250 feet 1.50

The Operator of a crane (50 tons and over) with a boom of 180 feet or more (including jib) shall receive a per hour premium for each hour worked on said crane (50 tons and over) in accordance with the following schedule:

Booms of 180 feet up to and including 250 feet 1.25 Booms over 250 feet 1.75

ENGI0003-004 09/02/2024

Rates Fringes Dredging: (Boat Operators) Boat Deckhand.................................................................$ 55.18 36.70 Boat Operator...................................................................$ 57.39 36.70 Master Boat Operator.......................................................$ 57.54 36.70 Dredging: (Clamshell or Dipper Dredging) GROUP 1.........................................................................$ 57.90 36.70 GROUP 2.........................................................................$ 57.24 36.70 GROUP 3.........................................................................$ 56.84 36.70 GROUP 4.........................................................................$ 55.18 36.70 Dredging: (Derricks) GROUP 1.........................................................................$ 57.90 36.70 GROUP 2.........................................................................$ 57.24 36.70 GROUP 3.........................................................................$ 56.84 36.70 GROUP 4.........................................................................$ 55.18 36.70 Dredging: (Hydraulic Suction Dredges) GROUP 1.........................................................................$ 57.54 36.70 GROUP 2.........................................................................$ 57.39 36.70 GROUP 3.........................................................................$ 57.24 36.70 GROUP 4.........................................................................$ 57.18 36.70 GROUP 5.........................................................................$ 37.88 26.76

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 79 of 92

Group 5............................................................................$ 56.84 36.70 GROUP 6.........................................................................$ 37.77 26.76 Group 6............................................................................$ 56.73 36.70 GROUP 7.........................................................................$ 36.22 26.76 Group 7............................................................................$ 55.18 36.70

CLAMSHELL OR DIPPER DREDGING CLASSIFICATIONS

GROUP 1: Clamshell or Dipper Operator.

GROUP 2: Mechanic or Welder; Watch Engineer.

GROUP 3: Barge Mate; Deckmate.

GROUP 4: Bargeman; Deckhand; Fireman; Oiler.

HYDRAULIC SUCTION DREDGING CLASSIFICATIONS

GROUP 1: Leverman.

GROUP 2: Watch Engineer (steam or electric).

GROUP 3: Mechanic or Welder.

GROUP 4: Dozer Operator.

GROUP 5: Deckmate.

GROUP 6: Winchman (Stern Winch on Dredge) GROUP 7: Deckhand (can operate anchor scow under direction of Deckmate); Fireman;

Leveeman; Oiler.

DERRICK CLASSIFICATIONS

GROUP 1: Operators (Derricks, Piledrivers and Cranes).

GROUP 2: Saurman Type Dragline (over 5 cubic yards).

GROUP 3: Deckmate; Saurman Type Dragline (up to and including 5 yards).

GROUP 4: Deckhand, Fireman, Oiler.

ENGI0003-044 09/02/2024

Rates Fringes

Power Equipment Operators

(PAVING)

Asphalt Concrete Material Transfer.............................................................................$ 55.88 37.32 Asphalt Plant Operator......................................................$ 56.31 37.32 Asphalt Raker....................................................................$ 54.92 37.32 Asphalt Spreader Operator................................................$ 56.40 37.32 Cold Planer........................................................................$ 56.71 37.32 Combination Loader/Backhoe (over 3/4 cu.yd.)...............$ 54.92 37.32 Combination Loader/Backhoe (up to 3/4 cu.yd.)..............$ 53.94 37.32 Concrete Saws and/or Grinder (self-propelled unit on streets, highways, NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 80 of 92 airports and canals)...........................................................$ 55.88 37.32 Grader...............................................................................$ 56.71 37.32 Laborer, Hand Roller........................................................$ 54.42 37.32 Loader (2 1/2 cu. yds. and under)................................................................................$ 55.88 37.32 Loader (over 2 1/2 cu.

yds. to and including 5

cu. yds.).............................................................................$ 56.20 37.32 Roller Operator (five tons and under)..........................................................................$ 54.65 37.32 Roller Operator (over five tons)...................................................................................$ 56.08 37.32 Screed Person....................................................................$ 55.88 37.32 Soil Stabilizer....................................................................$ 56.71 37.32

IRON0625-001 09/01/2024

Rates Fringes Ironworkers:...........................................................................$ 48.00 41.86

a. Employees will be paid $.50 per hour more while working in tunnels and coffer dams; $1.00 per hour more when required to work under or are covered with water (submerged) and when they are required to work on the summit of Mauna Kea, Mauna Loa or Haleakala.

LABO0368-001 09/02/2024

Rates Fringes Laborers:

Driller...............................................................................$ 44.75 25.96 Final Clean Up.................................................................$ 31.40 21.37 Gunite/Shotcrete Operator and High Scaler................................................................$ 42.25 25.96 Laborer I...........................................................................$ 41.75 25.96 Laborer II.........................................................................$ 39.15 25.96 Mason Tender/Hod Carrier...............................................$ 42.25 25.96 Powderman.......................................................................$ 42.75 25.96 Window Washer (bosun chair)…………………………..$ 41.25 25.96

LABORERS CLASSIFICATIONS

Laborer I: Air Blasting run by electric or pneumatic compressor; Asphalt Laborer, Ironer, Raker, Luteman, and Handroller, and all types of Asphalt Spreader Boxes; Asphalt Shoveler;

Assembly and Installation of Multiplates, Liner Plates, Rings, Mesh, Mats; Batching Plant (portable and temporary); Boring Machine Operator (under streets and sidewalks);

Buggymobile; Burning and Welding; Chainsaw, Faller, Logloader, and Bucker; Compactors (Jackson Jumping Jack and similar); Concrete Bucket Dumpman; Concrete Chipping; Concrete Chuteman/Hoseman (pouring concrete) (the handling of the chute from ready-mix trucks for such jobs as walls, slabs, decks, floors, foundations, footings, curbs, gutters, and sidewalks);

Concrete Core Cutter (Walls, Floors, and Ceiling); Concrete Grinding or Sanding; Concrete:

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 81 of 92

Hooking on, signaling, dumping of concrete for treme work over water on caissons, pilings, abutments, etc.; Concrete: Mixing, handling, conveying, pouring, vibrating, otherwise placing of concrete or aggregates or by any other process; Concrete: Operation of motorized wheelbarrows or buggies or machines of similar character, whether run by gas, diesel, or electric power; Concrete Placement Machine Operator: operation of Somero Hammerhead, Copperheads, or similar machines; Concrete Pump Machine (laying, coupling, uncoupling of all connections and cleaning of equipment); Concrete and/or Asphalt Saw (Walking or Handtype) (cutting walls or flatwork) (scoring old or new concrete and/or asphalt) (cutting for expansion joints) (streets and ways for laying of pipe, cable or conduit for all purposes);

Concrete Shovelers/Laborers (Wet or Dry); Concrete Screeding for Rough Strike-Off: Rodding or striking-off, by hand or mechanical means prior to finishing; Concrete Vibrator Operator;

Coring Holes: Walls, footings, piers or other obstructions for passage of pipes or conduits for any purpose and the pouring of concrete to secure the hole; Cribbers, Shorer, Lagging, Sheeting, and Trench Jacking and Bracing, Hand-Guided Lagging Hammer Whaling Bracing;

Curbing (Concrete and Asphalt); Curing of Concrete (impervious membrane and form oiler) mortar and other materials by any mode or method; Cut Granite Curb Setter (setting, leveling and grouting of all precast concrete or stone curbs); Cutting and Burning Torch (demolition);

Dri Pak-It Machine; Environmental Abatement: removal of asbestos, lead, and bio hazardous materials (EPA and/or OSHA certified); Falling, bucking, yarding, loading or burning of all trees or timber on construction site; Forklift (9 ft. and under); Gas, Pneumatic, and Electric tools; Grating and Grill work for drains or other purposes; Green Cutter of concrete or aggregate in any form, by hand, mechanical means, grindstone or air and/or water; Grout:

Spreading for any purpose; Guinea Chaser (Grade Checker) for general utility trenches, sitework, and excavation; Headerboard Man (Asphalt or Concrete); Heat Welder of Plastic (Laborers' AGC certified workers) (when work involves waterproofing for waterponds, artificial lakes and reservoir) heat welding for sewer pipes and fusion of HDPE pipes; Heavy Highway Laborer (Rigging, signaling, handling, and installation of pre-cast catch basins, manholes, curbs and gutters); High Pressure Nozzleman - Hydraulic Monitor (over 100# pressure); Jackhammer Operator; Jacking of slip forms: All semi and unskilled work connected therewithin; Laying of all multi-cell conduit or multi-purpose pipe; Magnesite and Mastic Workers (Wet or Dry)(including mixer operator);Mortar Man; Mortar Mixer (Block, Brick, Masonry, and Plastering); Nozzleman (Sandblasting and/or Water Blasting): handling, placing and operation of nozzle; Operation, Manual or Hydraulic jacking of shields and the use of such other mechanical equipment as may be necessary; Pavement Breakers; Paving, curbing and surfacing of streets, ways, courts, under and overpasses, bridges, approaches, slope walls, and all other labor connected therewith; Pilecutters; Pipe Accessment in place, bolting and lining up of sectional metal or other pipe including corrugated pipe; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, HDPE, metallic or non-metallic, conduit, and any other stationary-type of tubular device used for conveying of any substance or element, whether water, sewage, solid, gas, air, or other product whatsoever and without regard to the nature of material from which tubular material is fabricated; No-joint pipe and stripping of same, Pipewrapper, Caulker, Bander, Kettlemen, and men applying asphalt, Laykold, treating Creosote and similar-type materials (6-inch) pipe and over); Piping:

resurfacing and paving of all ditches in preparation for laying of all pipes; Pipe laying of lateral sewer pipe from main or side sewer to buildings or structure (except Contactor may direct work

NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 82 of 92 be done under proper supervision); Pipe laying, leveling and marking of the joint used for main or side sewers and storm sewers; Laying of all clay, terra cotta, ironstone, vitrified concrete, HDPE or other pipe for drainage; Placing and setting of water mains, gas mains and all pipe including removal of skids; Plaster Mortar Mixer/Pump; Pneumatic Impact Wrench; Portable Sawmill Operation: Choker setters, off bearers, and lumber handlers connected with clearing;

Posthole Digger (Hand Held, Gas, Air and Electric); Powderman's Tender; Power Broom Sweepers (Small); Preparation and Compaction of roadbeds for railroad track laying, highway construction, and the preparation of trenches, footings, etc., for cross-country transmission by pipelines, electrical transmission or underground lines or cables (by mechanical means);

Raising of structure by manual or hydraulic jacks or other methods and resetting of structure in new locations, including all concrete work; Ramming or compaction; Rigging in connection with Laborers' work (except demolition), Signaling (including the use of walkie talkie) Choke Setting, tag line usage; Tagging and Signaling of building materials into high rise units; Riprap, Stonepaver, and Rock Slinger (includes placement of stacked concrete, wet or dry and loading, unloading, signaling, slinging and setting of other similar materials); Rotary Scarifier (including multiple head concrete chipping Scarifier); Salamander Heater, Drying of plaster, concrete mortar or other aggregate; Scaffold Erector Leadman; Scaffolds: (Swing and hanging) including maintenance thereof; Scaler; Septic Tank/Cesspool and Drain Fields Digger and Installer; Shredder/Chipper (tree branches, brush, etc.); Stripping and Setting Forms; Stripping of Forms: Other than panel forms which are to be re-used in their original form, and stripping of forms on all flat arch work; Tampers (Barko, Wacker, and similar type); Tank Scaler and Cleaners; Tarman; Tree Climbers and Trimmers; Trencher (includes hand-held, Davis T-66 and similar type); Trucks (flatbed up to and including 2 1/2 tons when used in connection with on-site Laborers'work; Trucks (Refuse and Garbage Disposal) (from job site to dump); Vibra- Screed (Bull Float in connection with Laborers' work); Well Points, Installation of or any other dewatering system.

Laborer II: Asphalt Plant Laborer; Boring Machine Tender; Bridge Laborer; Burning of all debris (crates, boxes, packaging waste materials); Chainman, Rodmen, and Grade Markers;

Cleaning, clearing, grading and/or removal for streets, highways, roadways, aprons, runways, sidewalks, parking areas, airports, approaches, and other similar installations; Cleaning or reconditioning of streets, ways, sewers and waterlines, all maintenance work and work of an unskilled and semi-skilled nature; Concrete Bucket Tender (Groundman) hooking and unhooking of bucket; Concrete Forms; moving, cleaning, oiling and carrying to the next point of erection of all forms; Concrete Products Plant Laborers; Conveyor Tender (conveying of building materials); Crushed Stone Yards and Gravel and Sand Pit Laborers and all other similar plants; Demolition, Wrecking and Salvage Laborers: Wrecking and dismantling of buildings and all structures, with use of cutting or wrecking tools, breaking away, cleaning and removal of all fixtures, All hooking, unhooking, signaling of materials for salvage or scrap removed by crane or derrick; Digging under streets, roadways, aprons or other paved surfaces;

Driller's Tender; Chuck Tender, Outside Nipper; Dry-packing of concrete (plugging and filling of she-bolt holes); Fence and/or Guardrail Erector: Dismantling and/or re-installation of all fence; Finegrader; Firewatcher; Flagman (Coning, preparing, stablishing and removing portable roadway barricade devices); Signal Men on all construction work defined herein, including Traffic Control Signal Men at construction site; General Excavation; Backfilling, Grading and all other labor connected therewith; Digging of trenches, ditches and manholes and the leveling, NAVMWR-25-R-0007 Install Wave Attenuator

SECTION J Page 83 of 92 grading and other preparation prior to laying pipe or conduit for any purpose; Excavations and foundations for buildings, piers, foundations and holes, and all other construction. Preparation of street ways and bridges; General Laborer: Cleaning and Clearing of all debris and surplus material. Clean-up of right-of-way. Clearing and slashing of brush or trees by hand or mechanical cutting. General Clean up: sweeping, cleaning, wash-down, wiping of construction facility and equipment (other than ""Light Clean up (Janitorial) Laborer. Garbage and Debris Handlers and Cleaners. Appliance Handling (job site) (after delivery unlading in storage area);

Ground and Soil Treatment Work (Pest Control); Gunite/Shotcrete Operator Tender; Junk Yard Laborers (same as Salvage Yard); Laser Beam ""Target Man"" in connection with Laborers' work; Layout Person for Plastic (when work involves waterproofing for waterponds, artificial lakes and reservoirs); Limbers, Brush Loaders, and Pilers; Loading, Unloading, carrying, distributing and handling of all rods and material for use in reinforcing concrete construction (except when a derrick or outrigger operated by other than hand power is used); Loading, unloading, sorting, stockpiling, handling and distribution of water mains, gas mains and all pipes; Loading and unloading of all materials, fixtures, furnishings and appliances from point of delivery to stockpile to point of installation; hooking and signaling from truck, conveyance or stockpile; Material Yard Laborers; Pipelayer Tender; Pipewrapper, Caulker, Bander,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .