Native Works - Celilo Village Longhouse Proposal.pdf

PDF 12 MB Posted

Attached to
NOTICE - Replace Flooring for Celilo Village Longhouse - The Dalles, OR
Solicitation number
S-10000-00011835
Issued by
Wasco County, Toledo City, Oregon

About this file

This document is a proposal from Native Works for the Celilo Village Longhouse project. The project is being solicited by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The proposal outlines the scope of work for the construction of a longhouse facility in Celilo Village, including site preparation, foundation, framing, exterior and interior finishes, and mechanical, electrical, and plumbing systems. The total project budget is $2.5 million, with a proposed completion timeline of 12 months from the notice to proceed. The proposal includes a detailed project schedule, personnel qualifications, and relevant past experience.

The pricing terms outlined in the proposal include a fixed-fee contract with scheduled progress payments. Native Works is a certified Minority Business Enterprise (MBE) and is proposing a 15% MBE participation goal for the project. The proposal also notes that Native Works is the incumbent contractor for similar projects with the CTUIR, providing relevant experience and an understanding of the local environment and requirements. The project is funded through a combination of tribal and federal sources, with the CTUIR providing a significant portion of the overall budget.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALL GLUE DOWN LVP $39,334

DEMO EXISTING CARPET AND REMOVE FROM JOBSITE

SCRAPE TO REMOVE CARPET GLUE RESIDUE ON THE CONCRETE SLAB

SKIM COAT SLAB TO PREP FOR VINYL INSTALL

FURNISH AND INSTALL LUXURY VINYL PLANKS (LVP)

PROPOSAL PRETEXT

It is our suggestion to install LVP. It has a long life and wears well over time.

Given condition of adjacent floor LVP offers an unambiguous clean up.

Maintenance requires no waxing or similar upkeep.

GENERAL REQUIREMENTS

LICENSE, BOND, AND INSURANCE

GENERAL EXCLUSIONS

WORK OUTSIDE OF PROVIDED SKETCH

FLOOR TRANSITIONS - WALL BASE - UNKNOWN REPAIRS OF SUBSTRATE

ADDITIONAL WORK REQUIRED BY SUBCONTRACTOR

SUBTOTAL $39,334

OH&P $5,900

SUBTOTAL $45,234

TAX $258

TOTAL PROJECTED COST $45,492

Budget Proposal - CELILO VILLAGE LONGHOUSE

PROJECTED COST

PREPARED BY: Aaron Horn Email: estimating@nativeworks.com

NATIVEWORKS LLC CCB#: 239818

WBE/ESB/DBE/MBE CERT#: 13658

Portland, Oregon

BUDGET PROPOSAL - CELILO VILLAGE LONGHOUSE
BUDGET PROPOSAL CELILO VILLAGE LONGHOUSE FLOORING
BUDGET PROPOSAL CELILO VILLAGE LONGHOUSE
Lonhouse drawing
SKETCH - PICTURES
IMG_0296
IMG_0299
IMG_0310
IMG_0311

File details come from the government source that posted it. Updated .