NASRF Hatchery Buildings Q_A1_1.docx
DOCX document 214 KB Posted
- Solicitation number
- IFB1 PMAA 2017000283 3
- Issued by
- Alamosa County, Colorado
About this file
This is a Questions and Answers document for Invitation for Bid (IFB) 2017-283 issued by Colorado Parks and Wildlife for the Native Aquatics Species Restoration Facility (NASRF) Hatchery Buildings project. The document addresses clarifications regarding the construction of two buildings: the Staging Building and the Isolation Building, including specifications for electrical systems, plumbing infrastructure, HVAC equipment, water temperature systems, and building materials. Key clarifications include confirmation that 200 amps of electrical power will be available at the Staging Building location, that propane tank leasing arrangements are acceptable, that interior light fixtures shall be Luminaired LED "VPF 8 Series" or approved equivalents, and that exhaust louvers shall be manual operated. The document notes that a state plumbing permit will be required and that the project is not subject to Davis-Bacon wage requirements.
Additional technical clarifications address structural and operational details, including that translucent panels on the Isolation Building shall be 2 feet as shown in the drawings, that the drain line ties to a depth of 10 feet below grade, that hot water supply starts at 85 degrees Fahrenheit, that the effluent collection vault bottom is 9 feet below grade, and that water line insulation will be installed by the hatchery after project completion and is not included in the bid scope. The document explicitly states that these questions and answers do not constitute an Addendum and do not require acknowledgment in the bid package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT QUESTIONS
Native Aquatics Species Restoration Facility – Hatchery Buildings
June 15, 2017
IFB1: 2017*283
Question: Can you provide a specific light fixture?
Answer: The interior light fixtures shall be Luminaired LED “VPF 8 Series” or approved equivalent per specifications.
Question: Will 200 amps be available at the location shown for the Staging Building?
Answer: Initial electrician inspection has indicated that 200 amps will be available at this location. Bid the project accordingly.
Question: The specifications state that the contractor will provide the propane tank however Amerigas does not sell propane tanks, they are leased. Will leasing a tank be acceptable?
Answer: The contractor be responsible for arranging a leasing agreement with the gas company in this case.
Question: Can the Staging Building stem wall be raised to a constant elevation?
Answer: Bid the building as specified. Should a more cost effective option be identified that may be addressed after an award is made.
Question: Will there be a conflict with the location of the heaters and doors in the Staging Building?
Answer: There should not be a conflict with these locations; bid them as specified. The exact heater location may be adjusted during the construction phase if need be.
Question: Is the dimension “D” on the drain detail the starting or finishing depth?
Answer: This dimension is meant as the beginning depth. However this should not change the scope of bids and may be readdressed during the construction phase.
Question: Are the OHD outlets meant to be overhead door outlets?
Answer: These overhead outlets are not door outlets – they will be used for hatchery equipment.
Question: Can you provide the depth of the drain line that the Staging Building will tie to?
Answer: According to previous as builts the drain line lies 10’ below grade.
Question: What is the temperature of the hot water line?
Answer: The water temperature starts at 85°F.
Question: Will a plumbing permit be required for the project?
Answer: A state plumbing permit will be required.
Question: The drawings show a 2’ translucent panel on the Isolation Building but the specifications call for an 18” panel – can you clarify the discrepancy?
Answer: The panels shall be 2’ as shown in the drawings. This will be addressed in Amendment 1.
Question: Will a guard rail be required around the UV vault area in the Isolation Building?
Answer: Bid the project as indicated in the drawings and specifications. A guard rail may be addressed either in the construction phase or by the hatchery after project completion.
Question: Shall the exhaust louvers be automatic or manual operated?
Answer: The exhaust louvers shall be manual operated. This will be addressed in Amendment 1.
Question: How deep is the effluent collection vault?
Answer: According to previous as builts the bottom of the effluent collection vault lies 9’ below grade.
Question: Will insulation be required on the water lines to the Isolation Building?
Answer: Insulation will be installed by the hatchery after the project is complete and will not be included as a portion of this bid.
Question: How will the water lines enter the buildings and will interior plumbing be required?
Answer: Supply lines shall be installed with a 4” check valve and accessible 4” gate valve immediately upon entering the buildings as specified in the drawings.
Question: Is this project an elevated wage Davis-Bacon job?
Answer: No.
Note these questions and answers are not an Addendum and do not need to be acknowledged as such in the bid package.
Bob D. Broscheid, Director, Colorado Parks and Wildlife • Parks and Wildlife Commission: Robert W. Bray • Chris Castilian Jeanne Horne John Howard, Vice-Chair Bill Kane • Dale Pizel James Pribyl, Chair James Vigil Dean Wingfield Michelle Zimmerman, Secretary Alex Zipp Bob D. Broscheid, Director, Colorado Parks and Wildlife • Parks and Wildlife Commission: Robert W. Bray • Chris Castilian Jeanne Horne John Howard, Vice-Chair Bill Kane • Dale Pizel James Pribyl, Chair James Vigil Dean Wingfield Michelle Zimmerman, Secretary Alex Zipp image1.jpeg image2.png image3.png