Nashville Full RFP.pdf

PDF 133 KB Posted

Attached to
REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES
Solicitation number
PE-61050-NONST-2026-000000009
Issued by
Berrien County, Georgia

About this file

This is a Request for Proposals issued by the City of Nashville, Georgia for engineering services to support community and economic development projects. The City seeks a qualified engineering firm to provide pre- and post-award services including preliminary engineering reports, planning, design, cost estimating, bidding, contracting, construction oversight, quality control, and project closeout. The projects focus on critical public infrastructure improvements in water, sewer, street paving, and drainage systems. The firm selected will be responsible for obtaining and maintaining Build America Buy America (BABA) documentation, including manufacturer certifications, throughout construction and transferring these materials to the grant recipient at project completion. Proposals must be received by 2:00 p.m. on December 22, 2025, at the City of Nashville offices located at 405 W. Washington Avenue, P.O. Box 495, Nashville, GA 31639. Interested firms should contact Lindsay Ray at the Southern Georgia RC at (229) 333-5277 to request the Statement of Qualifications Form, Section 3 Forms (if applicable), and RFP scoring criteria. The selected engineer may be retained to provide services for future community and economic development projects over a limited time period based on grant funding availability.

The City of Nashville is pursuing federal and state funding through the Community Development Block Grant (CDBG) Annual Competition, Employee Incentive Program (EIP), Redevelopment Fund (RDF), and Immediate Threat and Danger (ITAD) programs administered by the Georgia Department of Community Affairs (DCA). All contracts are subject to federal and state provisions prescribed by the DCA. Evaluation will be based on qualifications, timeframes, and costs, with scoring criteria including years in business, resource capability, community knowledge, professional licenses, experience with CDBG projects, preliminary engineering report timeline capability (no later than 30 days after selection), key personnel qualifications, and three references. Firms must provide detailed cost estimates covering all services from design through project closeout, including costs for the preliminary engineering report if applicable. Section 3 Business Concerns are encouraged to apply. The City is committed to fair housing practices and compliance with all applicable civil rights and accessibility laws, including Title VI of the Civil Rights Act of 1964, the Fair Housing Act, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act, and the Build America Buy America Act.

View the file

Other files

File Type Posted
Engineering SOQ.pdf PDF
Section 3 Package.pdf PDF
Engineering Score Sheets.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Nashville 405 W. Washington Avenue/P.O. Box 495

Nashville, GA 31639

(229) 686-5527

November 19, 2025

REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES

The City of Nashville is requesting qualifications and proposals for selection of an Engineering Firm to provide pre- and post-award services for various community and economic development projects. Pre-and post-award services will include, but are not limited to, preparing preliminary engineering report, planning, design, cost estimating, bidding, contracting, construction oversight, quality control, and project closeout. As a basic service, all engineering contracts will also include obtaining and maintaining all Build America Buy America (BABA) documentation (particularly manufacturer’s certifications) during construction, which shall be transferred to the grant recipient. The engineer will need to certify to this action at the end of the project. The City is in dire need of Public Infrastructure Improvements, including, but not limited to, water, sewer, street paving, and/or drainage, and is considering applying for federal and/or state funding for Community Development Block Grant (CDBG) Annual Competition, Employee Incentive Program (EIP), Redevelopment Fund (RDF), and/or Immediate Threat and Danger (ITAD) funds through the Georgia Department of Community Affairs

(DCA).

Selection of an Engineer for the project will be based on qualifications as they relate to community and economic development needs. All contracts are subject to Federal and State contract provisions prescribed by the Georgia DCA. Selection could allow your firm to provide pre- and post-award Engineering Services for future community and economic development projects for a limited time period based on the funding of the grant.

Firms interested in submitting proposals for this project are asked to contact Lindsay Ray at the Southern Georgia RC, 1937 Carlton Adams Drive, Valdosta, GA 31602, (229) 333-5277 to request the Statement of Qualifications Form, the Section 3 Forms (Only Submit with your Proposal if you are claiming Section 3 Status), and the RFP scoring criterion. Your firm will be asked to mail your reply to the following:

City of Nashville 405 W. Washington Avenue

P.O. Box 495 Nashville, GA 31639

Office No. (229) 686-5527

Proposals mailed to or received at any location other than the above address will not be accepted.

Proposals must be received at the above address no later than 2:00 p.m. December 22, 2025. No proposals will be accepted after this time and date. The City of Nashville reserves the right to accept or reject any and all proposals and to waive informalities in the proposal process.

The City of Nashville is committed to Affirmatively Further Fair Housing. This project is covered under the requirements of Section 3 of the HUD Act of 1968. This contract opportunity is a Section 3 Covered Contract. Section 3 Business Concerns are encouraged to apply. The City of Nashville also abides by the following laws as they pertain to HUD Assisted Projects: Title VI of the Civil Rights Act of 1964;

Section 109 of the Housing and Community Development Act of 1974, Title 1; Title VII of the Civil Rights Act of 1968 (Fair Housing Act); Section 104(b)(2) of the Housing and Community Development Act of 1974; Section 504 of the Rehabilitation Act of 1973 as amended; Title II of the Americans with Disabilities Act of 1990 (ADA); the Architectural Barriers Act of 1968; and the Build America Buy America Act (BABA). The City of Nashville is committed to providing all persons with equal access to its services, programs, activities, education and employment regardless of race, color, national origin, religion, sex, familial status, disability or age.

Request For Proposals City of Nashville

Page Two

Selections will be based on qualifications, timeframes, and monies, as they relate to the following.

However, your firm is encouraged to request the Statement of Qualifications form and the RFP scoring criterion. Scoring of RFP’s will be as follows: Poor (1 point), Fair (2 points), Good (3 points), and Excellent (4 points).

QUALIFICATIONS AND TIME FRAMES:

1. Years in Business in Present Form.

2. Firm’s History and Resource Capability to Perform Required Services.

3. Firm’s knowledge of the community.

4. Titles, Names, and Addresses of all Officers.

5. List categories in which firm is legally qualified to do business. Include Licenses and Registrations where applicable.

6. Does your firm carry errors and omissions insurance?

7. Will your firm be able to provide necessary documentation for the application, including preliminary engineering reports, maps, and cost estimates as per CDBG application requirements if your firm is selected as project engineer?

8. Can your firm meet the draft PER deadline of no later than 30 days after selection as project engineer?

9. Has your firm been involved in applying for funds through DCA’s Community Development

Block Grant (CDBG) program? If “YES”, give specific projects, including project name, location, owner, year, grant/total project amount, contact person(s), and nature of firm’s responsibility.

10. If your firm is selected for this project, and the grant is approved, what timeframe do you feel you will need to have final plans and specifications ready for approval by any and all applicable agencies? Please provide this information in months, such as 3 months after Notice of Award of all grants, etc.

11. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.

12. List three (3) references for the Firm.

13. Are you a Section 3 Business Concern?

COST:

Please provide a specific cost estimate of what you will charge the City to provide Engineering services for this project from start to final close-out, to include but not limited to the following:

• Cost estimates

• Preparation of Plans and Specs and Final Design

• Surveying, for application purposes and for final project, if funded

• Bid Documents

• Assistance in Bid Opening

• Perform Bid Analysis

• Management of Contractor Performance, Inspections, Preparation of Change Orders, and Approval of Contractor’s Request for Payments

• Prepare and submit all required Reports and Documentation to DCA

• BABA Documentation

1. If you are awarded the design, bid phase, and inspection for this project, what would your fee be?

2. Does your firm charge for the preliminary engineering report (PER)? If yes, what would the charge be?

Please be sure to state all costs in your proposal.

If you have any questions pertaining to this RFP, please call Lindsay Ray at (229)333-5277, or email lray@sgrc.us.

cc: City of Nashville CDBG EIP

File SGRC Procurement File mailto:lray@sgrc.us.

QUALIFICATIONS AND TIME FRAMES:
COST:

File details come from the government source that posted it. Updated .