NASF BOS Section C.pdf

PDF 3 MB Posted

Attached to
Base Operations Support Contract (BOSC) for Naval Air Station Fallon, Nevada Federal contract opportunity
Solicitation number
N6247323R3218
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document provides details on an upcoming Base Operations Support Contract solicitation for Naval Air Station Fallon in Nevada. The Naval Facilities Engineering Command Southwest will issue the solicitation on March 14, 2024 via a virtual pre-solicitation conference on Microsoft Teams. The solicitation will be posted on SAM.gov when available. The contract will have a one-year base period and four one-year option periods exercisable by the government. The services required include base operations support for Naval Air Station Fallon. All responsible 8(a) small businesses are encouraged to submit a quotation. Prospective offerors must register in the System for Award Management to be considered for award, as registration is required by the proposal submission deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Contract (BOSC) for Naval Air Station Fallon, Nevada, newest first.
File Type Posted
Pre-Solicitation Conference Advertisement NASF PIEE.pdf PDF
SOI for PIEE rev1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0501040 – Ground Electronics Spec Item Title

1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification; Training and Licensing

2.3 Special Requirements

2.3.1 Maintenance Data Accounting Tool (MDAT) Data Collection and Reporting

2.3.2 Biennial NATOPS Evaluation

2.4 References and Technical Documents

2.5 Records and Reports

3 Recurring Work

3.1 Preventive Maintenance (PM) Program

3.1.1 ATC Communications Equipment

3.1.2 Precision Approach Equipment

3.1.3 Non-precision Approach Equipment

3.1.4 ATC Ancillary Equipment

3.1.5 NAVAIDS

3.1.6 METOC Equipment

3.1.7 Other Aviation Equipment

3.1.8 Non-Aviation Equipment

3.1.9 FRTC RASS Radars

3.2 Corrective Maintenance (CM)

3.2.1 Trouble Calls for NAALS Equipment

3.2.2 Non-emergent Trouble Calls

3.2.3 Logistic Support

3.2.4 Casualty Reports (CASREPs)

3.2.5 FRTC RASS Radar Corrective Maintenance

3.3 Ground Inspection Program

3.3.1 Scheduled Ground Inspection (Not Used)

3.3.2 Post-CM Ground Inspection

3.3.3 Test Equipment Calibration and Management

3.3.4 Base Electronic System Engineering Plan (BESEP) Support 4 Non-Recurring Work

Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform maintenance and support of ground electronics equipment at Naval Air Station Fallon (NASF), the Fallon Range Training Complex (FRTC), Special Areas and Remote Sites listed in J-0501040-16.

1.1

Concept of Operations

The intent of Section 0501040 is to specify the requirements for Corrective and Preventive Maintenance (CM, PM) of NAS Fallon (NASF) Air Operations identified systems and equipment. Corrective Maintenance is the maintenance and repair necessary to keep all assigned systems and equipment fully functional and operational to support Air Operations and Air Wing training. Preventive Maintenance is the maintenance necessary to keep all assigned systems and equipment within the developed In-Service Engineering Activity and manufactures standards using assigned Navy 3M program.

• NASF Air Operations systems/equipment will take priority over Non-NASF Air Operations systems/equipment.

Item

Title Description

2 Management and Administration

Assist the Ground Electronics Maintenance Officer in the management of NAS Fallon’s Ground Electronics Program and maintain an ATC Facility Electronics Manual IAW with OPNAVINST 3721.5 Series

2.1 Definitions and

Acronyms

Definitions and acronyms are listed in J-0501040-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience, and skills required for efficient operation, maintenance, and repair in support of the ground electronics function. The Contractor shall provide immediate replacement of personnel in the event a technician receives a suspension of qualification.

The Contractor shall provide a Ground Electronics Supervisor/Manager with a minimum of an Associate’s Degree or equivalent military electronics training; five years of Electronic Maintenance Supervision qualified in appropriate 3M Performance Qualification Standards (PQS) level and knowledgeable in Air Traffic Control Equipment maintenance requirements and programs.

Item

Title Description

2.2.1 Certification, Training, and Licensing

Contractor personnel shall meet the following certification, training, and licensing requirements:

The Contractor shall establish and maintain a written training and qualification program. Personnel performing maintenance on NAALS systems and equipment shall meet the requirements of OPNAVINST 3721.5, Naval Air Traffic Control, Air Navigation Aids, and Landing Systems (NAALS) Program. Training plans shall include but not limited to current technical knowledge, airfield safety, electronic safety, and CPR qualification and shall meet the requirements of NAVSEA 4790.8, Ships’ Maintenance and Material Management (3-M) Manual and OPNAVINST

5100.23 Navy Occupational Safety and Health Program Manual Appendix 6-A. The Contractor shall submit a copy of the Training Program per Section F.

The Contractor shall assign applicable In Service Engineering Activity (ISEA) approved job qualification requirements (JQRs) for each Air Traffic Control (ATC) system per OPNAVINST 3721.5. The Contractor shall have sufficient qualified technicians to meet performance standards prior to contract start.

Maintenance technicians shall have documented qualifications as outlined in OPNAVINST 3721.5 prior to performing maintenance and ground inspection on applicable NAALS systems and equipment. Maintenance technicians shall be designated in writing by the Ground Electronics Maintenance Officer (GEMO) for each system that they are qualified.

Personnel responsible for operation of vehicles on the airfield must complete Airfield Vehicle Operator’s Instruction Course (AVOIC) training and receive a license to operate vehicles on the airfield. AVOIC training and licensing is provided by the Government and must be scheduled with the Government and IAW NASFINST 3700.3 Series. Records of completed AVOIC training and licensing shall be maintained by the Contractor and made available for review by the KO upon request.

Personnel responsible for logistic support must be experienced in the utilization of the Naval Supply System, well versed in the FAA-AAC-229 logistic support agreement and acquisition regulations, and may be required to interact with ISEA and Equipment Managers.

The Contractor shall maintain training, certification and licensing records for employees and make them available to the KO within two hours of request.

Training, certification and licensing records shall be kept current and on file for the duration of the contract including all option periods.

Newly hired personnel shall complete 3M and Local Facility certifications within 60 days of hiring.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3 Special

Requirements

Test Equipment not provided by the government will be the contractor’s responsibility. Personal Protective Equipment is the contractor’s responsibility.

Preventive and Corrective Maintenance that will impact Airfield Operations shall be scheduled during non-airfield hours. RASS Test Equipment is Government Furnished/Contractor Maintained/Contractor Replaced See J-0501040-17

Item

Title Description

2.3.1 Maintenance

Data Accounting System (MDAS) Data Collection and Reporting

The Contractor shall report maintenance actions via MDAS Quarterly Reporting Tool (available at the ATC website) that provides accountability to the data element report requirements of MDAS 13-Week Report to Space and Naval Warfare Systems Command (SPAWAR).

All systems and equipment shall be identified by nomenclature, type, and quantity in the MDAS program application. All systems and equipment failures must be tracked by number of failures and downtime in hours and shall be identified in the MDAS program application. All Contractor preventative maintenance (PM) and corrective maintenance (CM) hours shall be tracked and entered into the MDAS line item pertaining to the specific equipment for that specific day which the action was accomplished. All materials and parts shall be tracked and entered into MDAS program application including parts cost, logistic delay time and other costs.

The information provided to MDAS must be maintained accurate and current. All data shall be entered and verified on a weekly basis at a minimum.

2.3.2 Biennial

NATOPS

Evaluation

The Contractor shall ensure that all records are maintained accurate and current to support audits and quality assurance inspections. This includes records of personnel training and qualifications, technician JQRs, logistical data for material ordering and tracking, Casualty Reports (CASREPs), MDAT reporting data, and other administrative requirements per NAVAIR 00-80T-114, NATOPS Air Traffic Control Manual.

The Contractor shall provide support for the biennial NATOPS evaluation performed by applicable Type Commander. This visit is a complete inspection of ground electronic maintenance operations, including:

-Equipment, systems, technical and administrative procedures and manpower as they apply to NAALS guide lines and instructions -Equipment/System Operational Availability (Ao) history -Personnel training records as applied to NAALS equipment and system qualifications -Compliance with OPNAV, Type Commander, and applicable Federal Aviation Administration (FAA) instructions and Technical Orders pertaining to Naval Air Station (NAS) as directed by CNO N785F and Naval Airspace and Air Traffic Control Standards and Evaluation Agency (NAATSEA).

-Logistic Support and cost of system ownership

-Current Flight Check Data for all major systems

2.4 References and

Technical Documents

References and technical documents are listed in J-0501040-02.

2.5 Records and

Reports

Records and reports are listed in Section F of the solicitation. The Contractor shall submit accurate and complete documents within the required timeframes.

Transmission of all Section F shall be maintained on the Government furnished share drive. The Technical Point of Contact (TPOC) shall provide authorization access for the Contractor.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work The Contractor shall maintain, repair, and verify ground electronics systems and equipment to ensure ATC systems are fully functional and operational to support the air operations mission.

The Contractor shall comply with applicable FAA, DoD, DoN, NAVAIR, and other directives, instructions, and references listed in J-0501040- 02.

Per EE 003-BA-GDY- 010/GEMO and OPNAVINST

3721.5 the Ground Electronics Maintenance Department (GEMD) is responsible for ensuring the reliability and accuracy of assigned ATC and air navigation equipment at NASF area of responsibilty.

Equipment adjustment, repair, and calibration must meet established procedures and shall be accomplished in accordance with applicable technical manuals, instructions, and directives.

Air navigation equipment not performing within the ISEA established standards and tolerances must be removed from service. Air traffic control personnel must be promptly advised of the condition to enable a Notice To Airmen (NOTAM) action within 15 min.

The Contactor shall conduct a joint initial inventory with the Government TPOC within 30 days of contract start. Ensure that all equipment listed is current and correct and submitted in accordance with Section F.

Equipment adjustment, repair, and calibration that affect air field operations shall be performed during non- air field hours.

Assist the GEMO in the required Bi-annual equipment/system validation

100 percent of Ground electronics systems and equipment are maintained to operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

Ground inspections are completed as required following PM and CM.

No major deficiencies are noted during the biennial Type Commander Quality Assurance Inspection.

Shall not exceed one validated customer comment per month.

Item

Title Performance Objective

Related Information Performance Standard provided by SPAWARS Configuration Data Management Team.

The Contractor shall manage the DPAS program for all Ground Electronics equipment that meets the requirement of

COMNAVREGSWINST

7320.1 Series and perform the

responsibilities of the Program Manager Property Coordinator.

Barcode property tags will be obtained from CNRSW N8 DPAS Coordinator and all required property paper work will be submitted for additions and deletions to CNRSW N8 DPAS Coordinator with copies to the GEMO.

The Contractor shall assist outside activities in the upgrade and installation of approved engineering changes to assigned systems and equipment within this annex as requested by the government.

Informational Note:

Working hours for this Annex shall be:

One hour before field opening to field closure.

Normal Field Hours are:

For Daylight Savings Time:

0730-2300 -Monday - Friday

1000 - 1800 Saturday 1200 - 1800 Sunday

Informational Note:

One field hour consist of (2 GEMD Technicians for GEMD only).

Field hours may be extended by Air OPS Officer up to a total of 100 field-hours before use of FEDMALL or task order.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall maintain the Command History/Monthly Summary Report.

Government Furnished Facilities (GFF) for this Annex is listed under Annex 2, J- 0200000.

Government Furnished Equipment (GFE) is listed in Annex 2, J-0200000, unless otherwise specified.

3.1 Preventive

Maintenance (PM) Program

The Contractor shall implement a PM program for ground electronics systems and equipment to ensure ATC systems are fully functional and operational to support the air operations mission and air wing training.

Ground electronics equipment shall be managed in compliance with OPNAVINST 4790.1 Navy Reserve Maintenance and Material Management (3M), OPNAVINST 4790.4, Ships’ Maintenance and Material Management (3-M) System Policy, and maintained per NAVSEAINST 4790.8. The Contractor’s PM program shall incorporate Maintenance Requirement Cards (MRCs) established by the applicable ISEA. Where MRCs are not available, they shall be developed in accordance with NAVSEAINST 4790.8 Series or performed IAW manufacture suggested procedures and documented.

The contractor shall obtain approval from the GEMO for any changes to the PM program.

The systems and equipment, including associated inventories that shall be included in the PM program, are addressed in the PM spec items below.

The Contractor shall submit a PM program per Section F.

As part of the PM program, the Contractor shall submit a

Ground electronics systems and equipment are maintained to operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

Ao of NAALS equipment meets the standard of 99% as stated in CNO letter dated 26 July 2004, Ser 785F5/4U790359.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

Item

Title Performance Objective

Related Information Performance Standard corrosion control plan for all systems and equipment subjected to weather not covered by the 3M program.

The corrosion control plan shall be updated as necessary to minimize the premature deterioration of affected systems and equipment.

The Contractor shall review at the beginning of the week and schedule in advanced with ATC any PM that requires an equipment outage during airfield operating hours. Refer to Spec Item 3 for airfield operating hours.

Any equipment outage required by PM and not able to be accomplished during field hours due to operations shall be completed during non-field hours.

The Contractor shall submit weekly PM schedules and reports in accordance with NAVSEAINST 4790.8 and per Section F. Changes to PM schedule that require Department Head approval per NAVSEAINST 4790.8 must be submitted to GEMO for approval.

All PM hours shall be tracked and entered into the MDAT line item pertaining to the specific equipment for that specific day that the preventive maintenance was accomplished.

Upon completion of PM on NAALS equipment, the Contractor shall perform applicable ground inspection prior to restoring the system to service.

Item

Title Performance Objective

Related Information Performance Standard

Historical data for PM labor hours by equipment type is provided in J-0501040-04.

3.1.1 ATC

Communications Equipment

The Contractor shall perform PM on ATC communications equipment to ensure systems are fully functional and operational.

The ATC communications equipment inventory is provided in J-0501040-05.

The Contractor shall maintain all operating frequencies of communications equipment as set by the GEMO and Frequency Manager per OPNAVINST 2400.20, Navy Management of the Radio Frequency Spectrum.

The Contractor shall perform preventive maintenance on all ATC and Carrier Air Wing (CVW)/Squadron radios and circuits in accordance with NAVSEAINST 4790.8 Series

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

ATC communications systems and equipment are maintained to meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

3.1.2 Precision

Approach Equipment

The Contractor shall perform PM on precision approach equipment to ensure systems are fully

The precision approach equipment inventory is provided in J-0501040-06.

Upon completion of PM on precision approach equipment, the Contractor shall perform applicable ground inspection prior to restoring the system to service per Spec Item 3.3.

The Contractor shall perform preventive maintenance on all Precision Approach Equipment in accordance with NAVSEAINST 4790.8 Series.

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control

Precision approach systems and equipment are maintained to operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed

Item

Title Performance Objective

Related Information Performance Standard

Tower at all times when operating on the airfield.

3.1.3 Non-precision

Approach Equipment

The Contractor shall perform PM on non-precision approach equipment to ensure systems are fully functional and operational.

The non-precision approach equipment inventory is provided in J-0501040-07.

Upon completion of PM on non-precision approach equipment, the Contractor shall perform applicable ground inspection prior to restoring the system to service per Spec Item 3.3.

The Contractor shall perform preventive maintenance on all Non-precision Approach Equipment in accordance with NAVSEAINST 4790.8 Series.

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

Non-precision approach systems and equipment are maintained to operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

3.1.4 ATC Ancillary

Equipment

The Contractor shall perform PM on ATC ancillary equipment to ensure systems are fully functional and

The ATC ancillary equipment inventory is provided in J- 0501040-08.

The Contractor shall perform preventive maintenance on ATC Ancillary Equipment in accordance with NAVSEAINST

4790.8 Series.

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

Perform PM on identified UPS systems IAW with manufacture/industry standards and recommendations. All readings and/or reports will be kept on file by annex and made available for Government inspection.

ATC ancillary systems and equipment are maintained to meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed

Item

Title Performance Objective

Related Information Performance Standard

3.1.5 NAVAIDS The Contractor shall

perform PM on NAVAIDS to ensure systems are fully

The NAVAIDS inventory is provided in J-0501040-09.

Upon completion of PM on NAVAIDS, the Contractor shall perform applicable ground inspection prior to restoring the system to service per Spec Item 3.3.

The Contractor shall perform preventive maintenance on NAVAIDS Equipment in accordance with NAVSEAINST

4790.8 Series, The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

NAVAIDS systems and equipment are maintained to operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

3.1.6 METOC

Equipment

The Contractor shall perform PM on METOC equipment to ensure systems are fully functional and

The METOC equipment

0501040-10.

The Contractor shall perform preventive maintenance on METOC Equipment in accordance with NAVSEAINST

4790.8 Series.

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

METOC systems and equipment are maintained to meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

3.1.7 Other Aviation

Equipment

The Contractor shall perform PM on other aviation equipment to ensure systems are fully functional and operational.

The other aviation equipment

0501040-11.

Other aviation systems and equipment are maintained to meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed

Item

Title Performance Objective

Related Information Performance Standard per the Contractor’s work schedule.

3.1.8 Non-Aviation

Equipment

The Contractor shall perform PM on non-aviation equipment to ensure systems are fully functional and operational.

The non-aviation equipment inventory is provided in J- 0501040-12.

The Contractor shall perform preventive maintenance on ATC Ancillary Equipment in accordance with NAVSEAINST

4790.8 Series, if applicable.

The Government will provide initial 3M MIP’s and MRC’s.

The Contractor shall be in contact with the ATC Control Tower at all times when operating on the airfield.

Non-aviation systems and equipment are maintained to meet the operational requirements of intended design parameters.

PM is accomplished per the MRCs and 3-M program and completed per the Contractor’s work schedule.

3.1.9 FRTC RASS

Radars

The Contractor shall perform PM on

FRTC RASS

equipment to ensure systems are fully functional and operational

The Contractor shall perform preventive maintenance on the FRTC RASS sites J-0501040- 17, in accordance with NAVSEAINST 4790.8 Series, The Government will provide initial 3M MIP’s and MRC’s.

Access for maintenance on the FRTC RASS sites shall be coordinated with the Government FRTC Range Coordinator.

Maintenance that requires Equipment shut down shall be coordinated with the Government FRTC Range Coordinator.

Informational Note:

Total labor cost, material cost, equipment cost and travel cost for maintenance of the 3 RASS Radar sites located on the FRTC ranges shall be tracked separately and provided upon request to the COR and GEMO.

FRTC RASS systems and equipment are maintained to meet the operational requirements of intended design parameters.

3.2 Corrective

Maintenance

(CM)

The Contractor shall perform CM on ground electronics systems and

The Contractor shall maintain a trouble call log to document, at a minimum, the work center, equipment nomenclature, serial

Ground electronics systems and equipment are repaired to meet operational

Item

Title Performance Objective

Related Information Performance Standard equipment to ensure ATC systems are restored to a fully functional and operational condition in a timely manner to support the air operations mission.

number (if applicable), date and time of failure, description of malfunction, corrective action taken, part number of failed item replaced, labor hours used, and name of the maintenance technician. These logs shall be made available to the KO upon request.

The Contractor shall maintain a service work order log for all NAALS and Non-NAALS equipment and systems on the Government Installation share drive to document all CM see J- 0501040-12, for maintenance service work order log requirements.

During field hours specified in Spec Item 3, a qualified technician must be immediately available by radio contact or telephone and able to respond to the location of the service work orders within 15 minutes (NAALS trouble calls take priority).

Upon completion of CM on NAALS equipment, the Contractor shall perform applicable ground inspection prior to restoring the system to service per Spec Item 3.3.

All CM hours shall be tracked and entered into the MDAS line item pertaining to the specific equipment for that specific day that the CM was accomplished.

The Contractor is not authorized to perform equipment configuration changes or modifications that affect ATC per OPNAVINST 3721.5

If the Contractor identifies a validated need for an equipment modification, the contractor will performance standards and tolerances as specified by the ISEA and operational requirements of intended design parameters.

Trouble calls are responded to and appropriate reports are made within the specified time.

NAALS service work orders are responded to within the specified time.

Item

Title Performance Objective

Related Information Performance Standard assist the GEMO in submitting an Engineering Change Proposal (ECP) shall be submitted in accordance with

NAVAIRINST 4130.1,

NAVAIR Configuration Management Manual and per Section F.

Changes and upgrades to systems/equipment will be performed as requested by the GEMO when authorized by the

ISEA.

FAA Flight Check may be required for major part replacement as determined by technical publications, NAVAIR 16-1-520, and FAA requirements. The Contractor shall coordinate and support official flight inspections that may be required to restore equipment to full operation per NAVAIR 16-1-520, United States Standard Flight Inspection Manual.

Historical data for CM labors hours by equipment type is provided in J-0501040-04.

3.2.1 Trouble Calls for

NAALS

Equipment

The Contractor shall respond to trouble calls on NAALS equipment to ensure ATC systems are restored to a fully functional and operational condition in a timely manner.

The Contractor shall respond to all NAALS trouble calls with a qualified technician capable of effecting immediate repair or diagnosing the fault and contacting the appropriate technician with certification authority for the applicable system.

NAALS equipment includes but is not limited to Precision Approach Equipment, Non-precision Approach Equipment and NAVAIDS.

The Contractor shall supply a phone list with on-call technicians per Section F.

NAALS trouble calls are responded to within 15 minutes during the hours specified in J- 0501040-03.

If additional technicians with qualifications for the applicable system are required to complete repairs and restore equipment to operation, they respond within 30 minutes of initial notification.

Outside normal airfield operating hours NAALS trouble calls

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall report NAALS equipment failures for all major NAVAIDs that will result in outages exceeding one hour to the GEMO or the Operations Duty Officer (ODO) within 15 minutes of initial notification to enable NOTAM procedures to be executed. The Contractor shall report the nature of the failure and shall include an estimated time of repair. If applicable, the Contractor shall restore service to ATC systems by bringing on-line secondary systems prior to commencing repairs to the failed unit.

The Contractor shall perform CM by repair or replacement of system, equipment, sub-assembly or component at the least cost or time, as determined by Government urgency of repair, to enable return to full operational readiness and availability. The Contractor shall expedite completion of all repairs to maintain Ao standards.

The Contractor shall brief the GEMO, daily on any change of the status of non-operating system/equipment and the day it is returned to service.

are responded to within two hours.

Notification of outages exceeding one hour are made within specified times.

Ground electronics systems and equipment are repaired to meet operational performance standards and tolerances as specified by the ISEA and operational requirements of intended design parameters.

Ao of NAALS equipment meets the standard of 99% as stated in CNO letter dated 26 July 2004, Ser 785F5/4U790359.

3.2.2 Non-emergent

Trouble Calls respond to trouble calls on ground electronics systems and equipment to ensure ATC systems are restored to a fully functional and operational condition in a timely manner.

Non-emergent trouble calls apply to corrective maintenance on all ATC systems other than NAALS equipment.

Performance of non-emergent trouble calls is not required outside of hours specified in J- 0501040-03.

If applicable, the Contractor shall restore service to ATC systems by bringing on-line, secondary systems prior to commencing repairs to the failed unit.

Non-emergent trouble calls are responded to within 15 minutes.

Ground electronics systems and equipment are repaired to meet operational requirements of intended design parameters.

Non-emergent trouble calls are completed within 30 working days.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall complete non-emergent trouble calls within 30 working days. A listing of all non-emergent trouble calls not corrected within 30 working daysshall be submitted per Section F.

The Contractor shall expedite completion of all repairs to maintain Ao standards.

Contractor will provide FM conventional radio programming, hero checks, troubleshooting services for all NASF and tenant command radios.

Repairs shall be performed on Air Operations FM conventional radios only (inventory not to exceed 150 radios, list to be provided by GEMO). When repairs for other activities are required Contractor will refer the customer to the GEMO for repair options.

The Contractor shall provide a computer to perform FM radio maintenance and programming (keeping current on programing software for NASF Air Operations radios will be responsibility of the Contractor). Activities purchasing new radios will provide the latest version of software for their radios.

3.2.3 Logistic Support The Contractor shall

process all orders for material and parts to ensure PM and CM is completed in a timely manner.

Logistics support personnel shall work with GEMD technicians to accurately and rapidly procure required materials and parts.

All National Stock Number (NSN) requisitions for NASF systems must be routed through the GEMO for approval on locally prepared DD Form

All material required for PM is ordered and received in sufficient time to support scheduled maintenance.

All material and parts required for CM are processed within one workday of request.

Item

Title Performance Objective

Related Information Performance Standard

1348. Form is available electronically from Air Ops (see J-0501040-13) prior to ordering.

1. Government provided:

The Government will provide (fund) all NSN repair parts, materials, and supplies that are not commercially available via the GEMO/OPS Department

2. Contractor provided:

The Contractor shall provide all repair parts, materials, and supplies and outside repairs that are available commercially required for the operation and support of this Annex.

For any NSN item that has a long lead time and significantly degrades NASF airfield operations and the item can be repaired by an outside activity at less cost and time, the contractor as requested by the GEMO shall expedite the repair.

All material and parts shall be tracked and entered into the MDAT line item pertaining to the specific equipment for which the parts and materials were ordered. The date and time each order was placed and each part was received shall be entered to track mean logistics delay time.

Notify the GEMO of discrepancies when equipment, material loss, or damage is identified.

3.2.4 Casualty Reports

(CASREPs) prepare and submit information for CASREPs to ensure timely and accurate reporting of equipment failures

The Contractor shall prepare a CASREP for all equipment failures that affect the air operations mission in accordance with Naval Warfare Publications Library (NWP) Operational Reports NWP 1-

CASREPs are accurately prepared as specified.

CASREPs are submitted within six

Item

Title Performance Objective

Related Information Performance Standard that affect the air operations mission.

03.1. CASREPs shall be

submitted per Section F.

CASREP’s shall take priority over all other assignments given to the Contractor unless otherwise directed by the Government in writing.

A Casualty Correction Report (CASCOR) shall be prepared and submitted per Section F.

CASREP updates shall be prepared and submitted per Section F.

hours of reported failure.

3.2.5 FRTC RASS

Radars

The Contractor shall perform CM on

FRTC RASS

locations with equipment to ensure systems are fully functional and operational.

The Contractor shall perform corrective maintenance on FRTC RASS system and equipment in accordance with NAVSEAINST 4790.8 Series.

The Contractor shall provide all repair parts, materials, and supplies and outside repairs that are available commercially required for the operation and support of this System.

The Government (CNAP/NSWC) will provide (fund) all NSN repair parts, materials, and supplies that are not commercially available.

FRTC RASS systems and equipment are repaired to meet operational requirements of intended design parameters.

3.3 Ground Inspection

Program establish and implement a ground inspection program to ensure ATC systems are properly tested and verified to be operating within specified standards and tolerances to support the air operations mission.

ATC systems must comply with a certification process per OPNAVINST 3721.5. The initial certification, which establishes baseline tolerances, is performed by the ISEA and may include FAA Flight Check, if applicable. Once the system is certified, the standards and tolerances identified in system commissioning and baseline configuration shall be verified during ground inspection.

The Contractor shall establish a program to maintain continual compliance with flight inspection tolerances outlined in

Ground electronics systems and equipment are verified to be in compliance with operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

Ao of NAALS equipment meets the standard of 99% as stated in CNO letter

Item

Title Performance Objective

Related Information Performance Standard

NAVAIR 16-1-520. The Contractor shall submit the ground inspection program per Section F.

Only qualified technicians for the applicable system are authorized to perform ground inspection per OPNAVINST 3721.5.

dated 26 July 2004, Ser 785F5/4U790359.

Verification of certification parameters is accomplished per the ground inspection program following PM and CM as required.

3.3.1 Scheduled Ground

Inspection (Not Used)

The Contractor shall conduct ground inspection following PM of ground electronics systems and equipment to ensure ATC systems are properly tested and verified to be operating within specified standards and tolerances for ground inspection.

PMs that require ground inspection shall be clearly identified on associated MRCs.

Immediately following the completion of PM that requires ground inspection, the Contractor shall verify that the system is operating within established tolerances and report to the GEMO or ODO when complete.

The Contractor shall record verification of system operation on Equipment Performance Forms and maintain forms for ground inspection history per

OPNAVINST 3721.5.

Ground electronics systems and equipment are verified to be in compliance with operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

Verification of certification parameters is accomplished per the ground inspection program following PM as required.

3.3.2 Post-CM Ground

Inspection conduct ground inspection following CM to ensure ATC systems are properly tested and verified to be operating within specified standards and tolerances for ground inspection.

Immediately following the completion of CM that requires ground inspection, the Contractor shall verify that the system is operating within established tolerances and report to the GEMO or ODO when complete.

The Contractor shall record verification of system operation on provided ISEA Equipment Performance Forms and maintain forms for ground inspection history per

OPNAVINST 3721.5.

Informational Note:

ISEA provided performance forms will vary by equipment and checks. Forms may be part

Ground electronics systems and equipment are verified to be in compliance with operational performance standards and tolerances as specified by the ISEA and meet the operational requirements of intended design parameters.

Verification of certification parameters is accomplished per the ground inspection program following CM as required.

Item

Title Performance Objective

Related Information Performance Standard of the MRC’s or obtained from the ATC web site.

3.3.3 Test Equipment

Calibration and Management

The Contractor shall provide management of test equipment to ensure equipment is properly calibrated and available to support PM, CM and ground inspection.

The inventory of Government-furnished test equipment is included in Annex 2, J-0200000 and J-0501040-17.

The Contractor shall calibrate all test equipment and monitor test equipment calibration requirements, ensuring compliance with the Navy calibration program requirements. Calibration shall be performed by approved calibration facilities traceable to the National Bureau of Standards.

The calibration cycle shall be in accordance with Navy standards on any test equipment used to perform CM, PM and ground inspections on all equipment/systems listed J- 0501040-04 thru J-0501040-11.

The calibration cycle requirements may be found on the Navy ATC web site.

The Contractor shall ensure valid calibration certifications labels are prominently displayed. Test equipment not displaying a current approved calibration label, or having a calibration label marked “special calibration” shall not be used without the specific written authorization of the GEMO.

Electronics equipment shall be tagged as unserviceable until permission for use of that specific equipment is received from the GEMO or calibration requirements have been met.

The Contractor shall provide adequate protection of test equipment during transportation to and from job sites, calibration facilities and repair sites to ensure there is no damage.

All test equipment is within calibration standards as specified.

Test equipment calibration is current and completed in accordance with OP43P6, Metrology Automated System for Uniform Recall and Reporting (MEASURE) User’s Manual.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall incorporate new General/Special Purpose Electronics Test Equipment (GPETE/SPETE) provided by GEMO into the Ground Electronics Inventory as well as in the calibration program.

Test equipment calibration shall be completed in accordance with OP43P6, Metrology Automated System for Uniform Recall and Reporting (MEASURE) User’s Manual.

3.3.4 Base Electronics

System Engineering Plan

(BESEP)

The Contractor shall provide Facility Support of NAS Fallon BESEP Projects

The Contractor shall provide Facility Support of NAS Fallon Ground Electronics BESEP projects. Support to include labor, other direct cost and material for BESEP identified requirements as ordered by the

GEMO.

Informational Note:

NAS Fallon averages two BESEP projects a year not to exceed $5,000.00 cost per project.

Contractor support provided as required and identified in the

BESEP.

BESEP Project is not delayed by non-support of Contractor.

Item

Title Performance Objective Related Information Performance Standard

4 Non- Recurring Work

Non-recurring work may be ordered utilizing FedMALL in accordance with Section H or on a task order in accordance with the PROCEDURES

FOR ISSUING ORDERS

clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to non-recurring ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for non-recurring work will be the same as those in Spec Item 3 where applicable.

0501050 – Airfield Facilities

Table of Contents

1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Personnel Requirements

2.3 Special Requirements

2.4 References and Technical Documents

2.5 Records and Reports

3 Recurring Work

3.1 Airfield Operations

3.1.1 Arrival Services

3.1.1.1 “Follow-Me” Services

3.1.1.2 Parking

3.1.2 Airfield Support Services

3.1.2.1 Ground Support Equipment (GSE)

3.1.2.2 Aircraft Towing

3.1.2.3 Aircraft Salvage

3.1.3 Aircraft Services

3.1.3.1 Fuel Coordination

3.1.3.2 General Aircraft Services

3.1.4 Departure Services

3.1.4.1 Aircraft Start-up

3.1.4.2 Directing Aircraft

3.2 Aviation Safety Programs

3.2.1 Bird Air Strike Hazard (BASH)

3.2.2 Foreign Object Debris (FOD)

3.3 Airfield Equipment

3.3.1 Arresting Gear

3.3.1.1 Field Arrestment Services

3.3.2 Optical Landing Systems (OLS)

3.3.3 Airfield Lighting

3.3.3.1 Windsocks

3.3.4 Ground Support Equipment (GSE)

4 Non-Recurring Work

Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform services in support of airfield facilities at Naval Air Station Fallon (NASF), the Fallon Range Training Complex (FRTC) and Special Areas.

1.1 Concept of

Operations

The intent of 0501050 Airfield Facilities is to specify the requirements to perform airfield operations. Included are services such as airfield operations (T-line services), aviation safety programs, and equipment maintenance. The following services are not included in this Template:

• Repair and sustainment of airfield lighting systems is included in the 1502000 Facility Investment

• Airfield sweeping is included in the 1503060 Pavement Clearance

• Grounds Maintenance for Bird/Animal Aircraft Strike Hazard (BASH) requirements is included in the 1503050 Grounds Maintenance and Landscaping

Spec Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and acronyms are listed in J-0501050-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operation, maintenance and repair in support of airfield facilities services.

The Contractor shall provide an Airfield Facilities Supervisor/Manager with a baseline understanding of qualifications, technical knowledge, experience, and skills required for efficient operation, maintenance, and repair in support of Airfield Facilities Services. The manager shall be qualified at the appropriate 3M level for this annex. This manager can be dual hatted with the Terminal Operations Manager as set forth in 0501070. The DPAS Coordinator duties and Logistics person may be combined with the DPAS Coordinator duties and Logistics person for Annex 0501040.

The Contractor shall submit Airfield Facililties Supervisor/Manager qualifications per Section F.

2.2.1 Certification, Training, and Licensing

Specific certification, training, and licensing requirements are addressed as follows and in Spec Item 3.

Contractor personnel responsible for operation of vehicles on the airfield must complete Airfield Vehicle Operators Instruction Course (AVOIC) Training and receive a license to operate vehicles on the airfield. AVOIC training and licensing is provided by the Government and must be scheduled with the Airfield Facilities Manager (AFM) and in accordance with NASFINST 3700.3 Series. Records of completed AVOIC training and licensing shall be maintained by the Contractor and made available for review by the KO upon request.

Contractor personnel operating Grounds Support Equipment (GSE) shall be licensed per OPNAVINST 4790.2, The Naval Aviation Maintenance Program (NAMP) Volume V and have in their possession a valid U.S. Government "USN" Aviation Support Equipment Operator's Identification Card, OPNAV Form 4790/102, for the GSE being operated.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

Personnel performing maintenance on E-28 Arresting gear and Optical Landing Systems must be qualified as outlined in NAVSEA 4790.4 Series, Ships Maintenance and Material Management (3M) and have completed approved job qualification requirements (JQRs).

All airfield service division personnel operating and/or maintaining the e-28 arresting gear system are required to complete all training modules and performance tracking. Personnel will be monitored via the training progress report generated by the Computer Based Training (CBT). This training follows all e-28 arresting gear standard operating procedures and technical maintenance directives and will be documented as a CNIC

Spec Item

Title Description system qualification fundamental for all associated professional qualification standards. The CBT is to be completed concurrently with all professional qualification standard.

Newly hired personnel shall complete 3M and certifications within 60 days of hiring.

Personnel responsible for logistic support must be experienced in the utilization Specific certification, training, and licensing requirements are addressed as follows and in Spec Item 3.

The Contractor shall maintain training, certification and licensing records for employees and make them available to the AFM/TPOC within two hours of request. Training, certification and licensing records shall be kept current and on file for the duration of the contract including all option periods.

Personnel responsible for logistic support must be experienced in the utilization of the Naval Supply System.

2.3 Special

Requirements

Test Equipment not provided by the government will be the contractor’s responsibility. Personal Protective Equipment is the contractor’s responsibility. Preventive and Corrective Maintenance that will impact Airfield Operations shall be scheduled during non-airfield hours or in concurrence with the Airfield Manager (AFM) to minimize impact to flight operations.

2.3.1 Airfield Safety The Contractor shall comply with all safety included in References and Technical Documents listed in J-0501050-02 and Annex 2. All personnel working on airfield facilities shall use required Personal Protective Equipment (PPE).

2.3.2 Priority of Service The Contractor shall follow, in descending order, the priorities shown below for servicing aircraft when multiple simultaneous requests are received that exceed the Contractor’s peak capacity. The Government will direct modifications to these priorities as situations may require.

-Search and Rescue (SAR) aircraft -Medical Evacuation (MEDEVAC) aircraft -DoD and U.S. Government aircraft involved in operational missions -Air Mobility Command (AMC) aircraft -Other DoD and U.S. Government aircraft -Allied government aircraft -Civilian aircraft

2.3.3 Communications The Contractor shall operate and maintain a communications system using radio frequencies assigned as directed by the Government. The Contractor shall establish radio contact with Air Traffic Control (ATC) to receive runway and taxiway access and shall maintain contact with ATC at all times while on airfield surfaces. Due to safety considerations and regulations, it is mandatory that Contractor personnel be able to speak English fluently and enunciate clearly.

2,4 References and Technical Documents

References and Technical Documents are listed in J-0501050-02.

Spec Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work

The Contractor shall provide airfield facilities services to ensure aircraft are supported in a proper, safe, and timely manner.

The Contractor shall comply with applicable Federal Aviation Administration (FAA), DoD, DoN, Naval Air Systems Command (NAVAIR), and other references, instructions, and directives listed in J- 0501050-02.

Government Furnished Facilities (GFF) for this Annex is listed in J-0200000- 05.

Government Furnished Equipment (GFE) for this Annex is listed in J-0200000- 06 unless specified otherwise within this Annex.

The Contractor shall manage the DPAS program for all Airfield Facilities equipment that meets the requirement of

COMNAVREGSWINST

7320.1 Series and perform

the responsibilities of the Program Manager Property Coordinator. Barcode property tags will be obtained from CNRSW N8 DPAS Coordinator) and all required property paper work will be submitted for additions and deletions to

CNRSW N8 DPAS

Coordinator with copies to the GEMO.

Working hours for this Annex shall be:

45 minutes before field opening to fifteen minutes after field closure.

Normal Field Hours are:

0730-2300 Monday - Friday 1000 - 1800 Saturday 1200 - 1800 Sunday

Aircraft arrivals, servicing, and departures are properly supported within the specified time.

Airfield facilities services are provided without personnel and aircraft accidents or malfunctions due to Contractor negligence.

Safety programs are properly executed to mitigate hazards.

Airfield equipment is maintained and repaired to sustain a fully functional and operable condition as specified.

Spec Item

Title Performance Objective

Related Information Performance Standard

Informational Note:

Extended Airfield Hours.

Airfield hours may be extended by Government Air Field Manager up to a total of 100 airfield-hours (500 man hours as identified in Annex 0200000) before use of FEDMALL or task order.

Field hours may be adjusted by Government Air Operations to support mission. During Daylight- Savings time, the airfield hours are shifted occasionally (open later and close later) to allow for more…