Effective Date: TBD
Expiration Date: TBD
CHECK https://gddms.gsfc.nasa.gov/Windchill/app/
TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.
National Aeronautics and Space Administration
Goddard Space Flight Center
Greenbelt, Maryland
WFIRST-IC-LIST-0023, Revision -
Wide Field Infrared Survey Telescope (WFIRST), Code 448
Instrument Carrier (IC)
Flight Structure Fabrication
Deliverable Items List and Schedule (DILS)
Instrument Carrier (IC)
DRAFT
Month Day, Year https://gddms.gsfc.nasa.gov/Windchill/app/
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Deliverable Items List and Schedule Effective Date: TBD iii
CHECK https://ipdtdms.gsfc.nasa.gov
Flight Structure Fabrication
Deliverable Items List and Schedule (DILS)
Review/Signature/Approval Page
Prepared by:
Wes Alexander
Approved by:
Ryan Mcclelland
Electronic Approval available on-line at: https://ipdtdms.gsfc.nasa.gov https://ipdtdms.gsfc.nasa.gov/
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision iv
Preface
This document is a Wide Field Infrared Survey Telescope (WFIRST)
Configuration Management (CM)-controlled document. Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee.
Proposed changes shall be submitted to the WFIRST CM Office (CMO), along with supportive material justifying the proposed change.
In this document, a requirement is identified by “shall,” a good practice by “should,” permission by “may” or “can,” expectation by “will,” and descriptive material by “is.”
Questions or comments concerning this document should be addressed to:
WFIRST Configuration Management Office
Mail Stop 448
Goddard Space Flight Center
Greenbelt, Maryland 20771
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision v
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR & CCB/ERB Approval Date)
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision vi
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Related Documentation
1.3.1 Applicable Documents
1.3.2 Reference Documents
1.4 Proprietary Data
2 DELIVERABLES
2.1 Definition of Maturity, Definition of Categories, and Delivery Instructions
2.2 Flight Structure Fabrication Contract Deliverables Requirement List (CDRL)
2.3 Government Furnished Property (GFP) Deliverables
3 DELIVERABLE ITEM DESCRIPTIONS
3.1 Hardware Deliverable Item Description
3.2 Data Deliverable Item Description
3.2.1 Verification matrix for Specification
3.2.2 Verification matrix for SOW
3.2.3 Verification matrix for DILS
3.2.4 Work Breakdown Structure Diagram and Dictionary
3.2.5 Financial Management Reports
3.2.6 Integrated Master Schedule
3.2.7 Component and Subassembly Reports for All Subcontracted Items
3.2.8 Configuration Management Plan
3.2.9 Working Documents and Drawing List with revision levels
3.2.10 Digital Image and Video Records
3.2.11 Kick Off Presentation
3.2.12 Manufacturing Readiness Review (MMR)
3.2.13 Manufacturing Readiness Review (MMR)
3.2.14 Test Readiness Review (TRR)
3.2.15 Pre-Ship Review (PSR)
3.2.16 End Item Data Package
3.2.17 Monthly Status reports
3.2.18 Drawing Tree
3.2.19 Document Tree
3.2.20 Flight Structure Fabrication Contamination Control Implementation Plan
3.2.21 Tube Fabrication documentation
3.2.22 Adhesive control documentation
3.2.23 NDE Inspection Standard Documentation
3.2.24 Test Article inspection reports for the Process development
3.2.25 Spare Parts Plan and List
3.2.26 IC Development Test Assemblies Plan
3.2.27 Assembly Plan
3.2.28 Verification Plan
3.2.29 Individual Test Plans
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision vii
3.2.30 Test Procedures
3.2.31 Test Reports
3.2.32 Transportation Handling Plan and Procedures
APPENDIX A ABBREVIATIONS AND ACRONYMS
List of Tables
Table 1 Contractor Data Delivery and Schedule
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
1 INTRODUCTION
1.1 Purpose
This document is the Wide Field Infrared Survey Telescope (WFIRST) Instrument Carrier (IC)
Fabrication Deliverable Items List and Schedule (DILS). This document provides specific information on the hardware and data deliverables for the Flight Structure Fabrication.
1.2 Scope
This Deliverable Items List and Schedule (DILS) defines
a. Deliverables and Schedule for requirements provided in both the WFIRST-IC-SOW-
0001 and the WFIRST-IC-SPEC-0046 documents governing the development and delivery of the WFIRST Instrument Carrier, associated test hardware, and associated ground support equipment to NASA’s Goddard Space Flight Center.
b. Tasks necessary to develop test articles and test them in support of the WFIRST engineering design effort at NASA’s GSFC.
c. Tasks necessary to support the testing, evaluation, validation, and qualification of the IC flight structure at NASA’s GSFC
d. Tasks necessary to support the WFIRST in post-delivery support.
e. The reviews required for supporting the IC Fabrication effort
f. Financial and schedule documentation
1.3 Related Documentation
The latest versions of all documents below should be used. WFIRST documents can be obtained from URL: https://ipdtdms.gsfc.nasa.gov
1.3.1 Applicable Documents
The following documents apply directly to the performance of the contract. These documents establish detailed information necessary for the creation of the deliverables.
For traceability, each Applicable Document shall be traced down one level only: any applicable documents within the documents listed below are considered as applying directly to the performance of this contract. For example, the WFIRST MAR (WFIRST-SMA-REQ-0032) lists
NASA Procedural Requirements (NPR) 7150.2 as an applicable document. Therefore, NPR
7150.2 is an applicable document with respect to this DILS. However, the documents listed in
Section P.4 of NPR 7150.2 are not considered Applicable Documents for the purposes of this
DILS.
The MAR is an Applicable Document; to the extent defined in Section 4 of the Flight Structures
Fabrication SOW (WFIRST-IC-SOW-0001) all deliverables associated with the specified requirements shall be delivered in accordance with the corresponding MAR DID’s.
Document Number Title
WFIRST-SYS-PLAN-
WFIRST Contamination Control Plan
WFIRST-SMA-REQ-0032 WFIRST Mission Assurance Requirements
WFIRST-IC-SPEC-0046 WFIRST Project Instrument Carrier Fabrication Specification
Document
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
WFIRST-IC-SOW-0001 WFIRST Project Instrument Carrier Fabrication Statement of
Work
1.3.2 Reference Documents
The following documents are referenced herein and amplify or clarify the information presented in this document. These documents are not binding on the content of this document.
Document Number Title
GPR-1410.2E GSFC Configuration Management
1.4 Proprietary Data
Some of the content of documents may be of a proprietary nature to the document preparing/sending Party. In the event data is deemed to be proprietary, and for which protection is to be maintained, the sending Party shall mark the document with a notice to indicate that the data therein is proprietary and shall be used and disclosed by the receiving Party and its related entities (e.g., contractors and subcontractors) only for the purposes of fulfilling the receiving
Party’s responsibilities under the WFIRST Project, and that the identified and marked technical data shall not be disclosed or retransferred to any other entity without prior written permission of the document preparer.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
2 DELIVERABLES
2.1 Definition of Maturity, Definition of Categories, and Delivery Instructions
The following definitions apply to the "Maturity: Delivery Date”.
a) Maturity:
1) Preliminary. This refers to the initial submission of an item. To be completed with available information as of the time of preparation for the due date.
2) Update: The best up-to-date information available at the time.
3) Final. This refers to a completed, thorough submission of an item for approval, review, or information. This does not preclude updating later. Any updates shall require the same
"approval/review" process as was required for the previous submissions.
b) NASA Action Required Code
A Approval: Items in this category require review and approval by GSFC or its designated representatives prior to use or implementation. GSFC shall approve/disapprove within 30 working days of receipt.
Requirements for resubmission shall be specified in letter(s) of disapproval.
R Review: Documents in this category are to be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC shall review and comment within 20 working days of receipt.
I Information. Documents in this category are to be provided to GSFC or its designated representative for information purposes only. No
Government response is required.
c) Quantity: This provides the required number of copies for the deliverable.
2.2 Flight Structure Fabrication Contract Deliverables Requirement List (CDRL)
The Contractor Hardware Deliverable Items List is in the Contract.
The Contractor Data Delivery and Schedule is shown in Table 1.
The Contractor Hardware Deliverable Item Descriptions are in Section 3.1 of this document.
The Contractor Data Deliverable Item Descriptions are in Section 3.2 of this document.
Table 1 Contractor Data Delivery and Schedule
CDRL
No.
Title Reference Category Quant. Maturity: Delivery Date
PM-1 Verification matrix For
SPEC
SOW 2.1-C R 1 Preliminary with proposal
Baseline: at Kickoff meeting
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
No.
Title Reference Category Quant. Maturity: Delivery Date
PM-2 Verification matrix For
SOW
SOW 2.1-D R 1 Preliminary with proposal
Baseline: at Kickoff meeting
PM-3 Verification matrix For
DILS
SOW 2.1-E R 1 Preliminary with proposal
Baseline: at Kickoff meeting
PM-4 Flight Structure
Fabrication Work
Breakdown Structure
Diagram and Dictionary
SOW 2.1.2-B R 1 Preliminary: 15 Days
ACA
Updates: as WBS changes occur.
PM-5 Monthly Financial management reports
SOW 2.1.2-D R 1 Preliminary:
- 533Q report within 30 working days ACA.
- 533M reporting must begin no later than 30 days after incurrence of cost.
Updates:
- 533Q: Due on the
15th of the month preceding the quarter being reported in columns 8a, 8b, and
8c
- 533M: Due No Later
Than (NLT) 10 working days after the close of
Contractor’s monthly accounting period.
PM-6 Integrated Master
Schedule (IMS)
SOW 2.1.3-B A 1 Preliminary: 15 days
ACA.
Any changes to IMS shall be updated prior to the WFIRST Monthly
Review with updates by the end of 3rd week in the month.
PM-7 Component and
Subassembly Inspection
Reports for All
Subcontracted Items
SOW 2.1.4-E R 1 Final: Due when parts are delivered
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Title Reference Category Quant. Maturity: Delivery Date
PM-8 Configuration
Management Plan
SOW 2.1.5-B A 1 Preliminary: 20 days
ACA
Final: 40 days ACA
PM-9 Working Documents and
Drawing List with revision levels
SOW 2.1.5-E R 1 Bi weekly and updates at all reviews
PM-10 Digital Image and Video
Records Document
SOW 2.1.5-I R As needed Preliminary shall be part of the working floor travelers
All photo documentation will be provided along with the EIDP delivery.
PM-11 Kick off Meeting
Presentation package
SOW 2.2.2-A R 2 Preliminary 10 days before Kickoff meeting
Final day of Kick off meeting
PM-12 Manufacturing
Readiness Review (1)
(MRR) Presentation
Package
SOW 2.2.4-B-a A 2 Preliminary 7 calendar
Days before Review
Final 10 days after review
PM-13 Manufacturing
Readiness Review (2)
(MRR) Presentation
Package
SOW 2.2.4-B-b A 1 Preliminary 7 Calendar
Days before Review
Final 10 days after review
PM-14 Test Readiness Reviews
Package
SOW 2.2.4-C A 2 Min Preliminary: 7 calendar days before testing reviews
Final: 5 days after testing reviews
PM-15 Pre Ship/Acceptance
Review Package
SOW 2.2.4-D A 1 for each review
Preliminary: 7 Calendar
Days before Structure acceptance review
Final: before final acceptance
PM-16 End Item Acceptance
Data Package
SOW 2.2.4-E A 1 Preliminary 7 Calendar days before PSR
Final at PSR’s
PM-17 Monthly Status Report SOW 2.2.6-B R 1 Monthly Reports are due with updates by the end of 3rd week in the month.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Title Reference Category Quant. Maturity: Delivery Date
SE-1 Drawing Tree SOW 3.1.2 B R 1 Preliminary:5 days before each MRR and as changes are made
Final: PSR
SE-2 Document Tree SOW 3.1.2C R 1 Preliminary:5 days before each MRR and as changes are made
Final: PSR
SE-3 Flight Structure
Fabrication
Contamination Control
Implementation Plan
SOW 3.1.4-B A 1 Preliminary: 7 days before first MRR
Final: 10 days after first
MRR
SE-4 Tube fabrication traveler with all test, dimensional and NDE documentation
SOW 3.2.1-B/a A 1 each tube configuration
Plan at Kickoff
Final: 10 days before
Flight tube MRR
SE-5 Final report of adhesive control including Dams and Circular bonds
SOW 3.2.1-B/b A 1 Plan at Kickoff
Final: 10 days before
Flight tube MRR
SE-6 NDE Inspection
Standard documentation
SOW 3.2.1-B/c A 1 Plan at Kickoff
Final: 10 days before
Flight tube MRR
SE-7 Inspection reports SOW3.2.1-B/d A 1 Plan at Kickoff
Final: 10 days before
Flight tube MRR
SE-8 Spare Parts Plan and List SOW 3.2.3B A 1 Plan: at Kickoff
List: 7 days before tube fabrication MRR
IT-1 Component assembly and test plan
SOW 5.2-A R 1 Preliminary 20 days before any subscale testing
Final: 10 days prior to subscale testing
IT-2 Assembly Plan SOW 5.3A A 1 Preliminary 60 days before flight structure assembly MRR
Final 30 days before final assembly MRR
IT-3 Verification Plan SOW 5.4-A A 1 60 Days ACA
IT-4 Individual Test Plans SOW 5.4-B A 1 Final: 30 days prior to subscale test start
IT-5 Test Procedures SOW 5.4-D A 1 Final: 10 days prior to subscale test start
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Title Reference Category Quant. Maturity: Delivery Date
IT-6 Test Reports SOW 5.4-H R 1 per test Preliminary 2 days after test completion
10 days after test completion
IT-7 Transportation Handling
Plan and Procedures
SOW 5.5-B A 1 Preliminary: 60 days prior to IC CDR
Final: 30 days before
PSR
2.3 Government Furnished Property (GFP) Deliverables
Large Titanium forgings for fabricating nodes
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
3 DELIVERABLE ITEM DESCRIPTIONS
3.1 Hardware Deliverable Item Description
Title: Square Development Tubes 2242499 CDRL No.: HW-1
SOW Paragraph 6.7
Description:
Contractor shall deliver Three fully qualified Square development tubes using the same process that will be used for the flight fabrication per WFIRST-IC-SPEC-0046.
Applicable Documents: WFIRST-IC-SPEC-0046
Reference Documents: WFIRST-IC-SOW-0001
Title: Diamond development Tubes 2242498 CDRL No.: HW-2
SOW Paragraph 6.7
Description:
Contractor shall deliver Three fully qualified Diagonal development tubes using the same process that will be used for the flight fabrication per WFIRST-IC-SPEC-0046.
Title: Instrument Carrier Flight Structure CDRL No.: HW-3
Description:
Contractor shall deliver one fully qualified Instrument Carrier Flight Structure per WFIRST-
IC-SPEC-0046.
Title: Shipping Container CDRL No.: HW-4
Description:
Contractor shall deliver one Fabricated and Tested Shipping Container per WFIRST SPEC-
17050
Title: Spare Tubes CDRL No.: HW-5
Description:
Contractor shall deliver spare tubes per WFIRST SPEC-17050
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Title: Spare Gusset Material CDRL No.: HW-6
Description:
Contractor shall deliver spare gusset material per WFIRST-IC-SPEC-0046.
Title: Repair Panels CDRL No.: HW-7
Description:
Contractor shall deliver repair panels per WFIRST IC-SPEC-0046
Title: Completed Test Articles CDRL No.: HW-8
SOW Paragraph 9.7
Description:
Contractor shall deliver broken test articles.
Applicable Documents: None
Reference Documents: None
Title: Trials for adhesive processing CDRL No.: HW-9
SOW Paragraph 9.7
Description:
Contractor shall deliver Plexiglas trials repair articles, NDE Standards that can be used for inspection at GSFC and any broken test articles.
3.2 Data Deliverable Item Description
3.2.1 Verification matrix for Specification
Title: Verification Matrix for Specification CDRL No.: PM-1
SOW Paragraph: 2.1-C
Use:
Establish that all requirements will be met
Applicable Documents: None
Reference Documents: None
Maturity/Delivery Date:
Preliminary: with proposal
Baseline: Kick-off meeting.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Preparation Information:
This matrix establishes that the contractor shall meet all the requirements in the document and will be used for tracking progress
3.2.2 Verification matrix for SOW
Title: Verification Matrix for SOW CDRL No.: PM-2
SOW Paragraph: 2.1-D
Use:
Establish that all requirements will be met
Applicable Documents: None
Reference Documents: None
Maturity/Delivery Date:
3.2.3 Verification matrix for DILS
Title: Verification Matrix for DILS CDRL No.: PM-3
SOW Paragraph: 2.1-E
Use:
Establish that all requirements will be met
Applicable Documents: None
Reference Documents: None
Maturity/Delivery Date:
3.2.4 Work Breakdown Structure Diagram and Dictionary
Title: Work Breakdown Structure Diagram and Dictionary CDRL No.: PM-4
SOW Paragraph: 2.1.2-B
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Use:
The WBS establishes a product-oriented framework for reporting project cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, project visibility, and assignment of responsibilities.
Additionally, the WBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work.
The WBS Dictionary provides a narrative description of the work tasks and effort to be performed in each WBS element.
Maturity/Delivery Date:
Preliminary: 15 Days ACA
Updates: as WBS changes occur.
The WBS and WBS Dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:
a. WBS - A logical, hierarchical display of the subdivision of all project work to be completed. The WBS shall include the approved element title and element number.
b. WBS Dictionary - The WBS dictionary shall describe and document the work content of every WBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).
The WBS dictionary shall be arranged in the same order as the contract WBS.
3.2.5 Financial Management Reports
Title: Financial Management Reporting CDRL No.: PM-5
SOW Paragraph: 2.1.2-D
Use:
To provide data necessary for
a) Projecting costs and hours to ensure that dollar and labor resources realistically support project and program schedules;
b) Evaluating the Contractors’ actual cost and fee data in relation to negotiated contract value, estimated costs, and budget forecast data;
c) Planning, monitoring, and controlling project and program resources; and
d) Accruing cost in NASA’s accounting system.
Applicable Documents: NPR 9501.2E NASA Contractor Financial Management Reporting
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Maturity/Delivery Date:
Preliminary Submission:
The Contractor shall submit initial 533Q report within 30 working days ACA. The
533M reporting must begin no later than 30 days after incurrence of cost.
Further Submissions:
- 533Q: Due on the 15th of the month preceding the quarter being reported in columns 8a, 8b, and 8c
- 533M: Due No Later Than (NLT) 10 working days after the close of Contractor’s monthly accounting period.
Contents:
The 533M shall provide monthly data on actual and planned costs and labor hours, short-term projections, Estimate-to-Complete, and Contract Value, in accordance with
NPR 9501.2E.
The 533 shall provide monthly and quarterly contractual planned and actual expenditure data as defined by the Government including subcontractor data. It shall also include estimated cost to complete.
Financial reports shall be provided down to the WBS level 3.
The Financial Management Reports shall include reconciliation between the 533Q and the Integrated Program Management Report (IPMR). This reconciliation may be included within the required IPMR formats.
Format:
The NF 533 Financial Management Reports shall be prepared in accordance with
GSFC 52.242-90, Financial Management Reporting, and NASA FAR Supplement
(NFS) 1852.242-73, NASA Contractor Financial Management Reporting clauses.
3.2.6 Integrated Master Schedule
Title: Integrated Master Schedule CDRL No.: PM-6
SOW Paragraph: 2.1.3-B
Use:
For understanding and mapping out in detail the most efficient way of melding together all elements necessary for providing the program deliverables by their required delivery times.
The schedule shall encompass all phases of the program indicating critical path and schedule slack and reserve, including detailed subsystem schedules.
Maturity/Delivery Date:
Preliminary: 15 days ACA.
Change updates required at the end of the 3rd week of the month.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Detailed network diagrams shall be developed, delivered, and maintained for both the isolator and the launch lock schedule The Schedule shall reflect the significant activities in sufficient detail to permit adequate visibility into work progress. Schedules shall contain the approved baseline as well as current forecasted dates and shall be traceable to the approved Work
Breakdown Structure (WBS). All key milestones shall be clearly identified including: contract milestones, design reviews, readiness reviews, de-scope decision points and major receivables/deliverables among subsystems/organizations (including subcontractor effort).
Milestones shall be logically linked to related tasks. Clearly identified schedule margin tasks and dates needed for Government Furnished Property shall be included in the network. A log of changes to the schedule baseline shall be maintained and reported monthly. Critical paths, slack, and reserve shall be identified.
Scheduling Tool/Process: The Contractor shall use an application that is compatible to
Microsoft Project. The tool shall support data transfer and integration.
The following status and analysis reports shall be provided monthly:
Top-Level Contractor Summary Schedule: Top-level schedule (chart), in project compatible software, suitable for a formal presentation.
3.2.7 Component and Subassembly Reports for All Subcontracted Items
Title: Component and Subassembly Test Reports for All Subcontracted
Items
CDRL No: PM-7
SOW Paragraph: 2.1.4-E
Provides descriptions of , drawings, inspections results, and any failures/corrective actions
Maturity/Delivery Date:
Due when parts are delivered
Preparation Information:
As a minimum, these reports shall identify the requirements, drawings, inspections results, and any failures/corrective actions.
3.2.8 Configuration Management Plan
Title: Configuration Management Plan CDRL No.: PM-8
SOW Paragraph: 2.1.5-B
Use:
To define the Contractor’s configuration management system and to provide a means of control for all changes affecting form, fit, or function and any impact on performance, cost or schedule.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Reference Documents: GPR-1410.2E GSFC Configuration Management
Maturity/Delivery Date:
Preliminary: 20 days ACA
Final: 40 days ACA
- The plan shall describe the Contractor’s configuration management organization and personnel responsibilities.
- The plan shall describe the Contractor's configuration identification system, including drawing and specification standards.
- The plan shall accommodate the requirements of the contract relative to technical direction and approvals.
- The plan shall describe the Contractor's change control system and shall include sample change documents and/or forms.
- The plan shall define the interfaces between the Contractor's change control system and
GSFC CM Office.
- The plan shall describe which types of changes will be submitted to GSFC for approval, and the process for their submittal.
- The plan shall define the Contractor's engineering data management activities
(including archiving process), documentation approvals, release procedures, and categories of release.
- The plan shall describe the Contractor's configuration status accounting system including samples of lists and reports used.
- The plan shall describe the Contractor's approach to verification and configuration audit to ensure that performance and functional requirements have been achieved by the design.
- The plan shall describe Contractor’s approach for using photographs as part of the
Configuration Management/documentation process.
3.2.9 Working Documents and Drawing List with revision levels
Title: Document and drawing List revisions CDRL No.: PM-9
SOW Paragraph: 2.1.5-E
Use:
This will be to insure that correct versions of the documents and the drawings are provided to the floor for working documents
This will be provided every 2 weeks and at all reviews.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
3.2.10 Digital Image and Video Records
Title: Digital Image and Video Records Document CDRL No.: PM-10
SOW Paragraph: 2.1.5-I
Use:
Program status reviews; system, subsystem, and assembly packaging evaluations; and trouble shooting. Documentary electronic images of the flight structure fabrication during key phases of fabrication and Assembly, Integration, & Test.
Maturity/Delivery Date:
Preliminary should be part of the working floor travelers
All photo documentation will be provided along with the End Item Data Package
(EIDP) delivery.
- Images shall be provided in digital format (JPEG, PNG, or TIFF)
- Images shall include pictures of the major subsystems, critical assemblies, the full-up system, and major GSE items.
- Images shall serve as a record of the build-up of a major subassemblies and assemblies;
e.g., a typical electronic card, mother board, electronic subsystem with cover off, etc.
- Each image shall be identified with a label containing the following information:
assembly number, serial number, description (e.g. name of the assembly), date of image, and the supplier's company name.
- Each image shall include a scale reference (e.g. rule, standard cube).
- The subject shall appropriately fill the digital frame to allow for effective magnification. Images shall include pictures of environmental test fixtures.
- Images shall be of sufficient resolution to clearly show component placement, part marking, or details that are covered or obscured at subsequent levels of assembly and/or any other operation that renders subsequent inspection impractical.
Images shall be of sufficient resolution to permit identification of components and verification of wire routings.
3.2.11 Kick Off Presentation
Title: Kick Off Meeting Presentation Package CDRL No: PM-11
SOW Paragraph: 2.2.2-A
Use:
To provide technical and programmatic information in the form of presentation slides, drawings, schematics, and schedules for distribution at Kick off meeting.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Maturity/Delivery Date:
- Preliminary: 10 days before Kickoff meeting
- Final: Day of the Kick off meeting
The template(s) will be mutually agreed to between the Project and the Contractor. As a minimum the presentation package should cover the following areas:
Program Management organization Chart
Review of flow-down documentation (SOW, MAR, Spec, DILS, applicable documents
Review of key baseline assumptions
Quality Assurance including non- conformance processing
Design Description review of technical approach
Flight Heritage including review of applicable Lessons Learned
Review of Critical Processes
Facilities
Review of Potential Risks and risk mitigation plan
Review of key technical areas, confirmation of plans for TIMs
Schedule Review including critical path and margin
Review of Deliverable Items
3.2.12 Manufacturing Readiness Review (MMR)
Title: Manufacturing Readiness Review Presentation Package 1 CDRL No: PM-12
SOW Paragraph: 2.2.4-B
Use:
To provide technical information on the hardware before fabrication of flight tubes and gussets requirement
Applicable Documents: None
Reference Documents: None
Maturity/Delivery Date:
- Preliminary: 7 Calendar days before review
- Final: 10 days after review
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Fabrication and inspection flow
Key individuals working on the fabrication
Facilities
Quality/Verification plan
Contamination control plan
Material certifications and test reports
Mandrel evaluation or overall GSE
Thermal cycle details
Schedule
3.2.13 Manufacturing Readiness Review (MMR)
Title: Manufacturing Readiness Review Presentation Package 2 CDRL No: PM-13
SOW Paragraph: 2.2.4-B
Use:
To provide technical information on the hardware after all parts are fabricated for the development test assemblies and the test assemblies are ready to build and test
Maturity/Delivery Date:
- Preliminary: 7 Calendar days before review
- Final: 10 days after review
Fabrication and inspection flow
Assembly flow
Key individuals working on the fabrication
Facilities
Quality/Verification plan
Contamination control plan
Piece part inspection and test reports
Mandrel evaluation or overall GSE
Schedule
3.2.14 Test Readiness Review (TRR)
Title: Test Readiness Review Presentation Package CDRL No: PM-14
SOW Paragraph: 2.2.4.C
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
To provide technical information on the hardware design in preparation for testing of both the qualification unit and the flight units of each component such as the launch lock and the isolator.
Maturity/Delivery Date:
- Preliminary: 7 calendar days before testing reviews
- Final: 5 days after test
Preparation Information:
Review packages shall provide the information to fully understand the GSE, analysis, and testing of the subscale test articles. The presentation shall cover the following areas.
Quality Assurance
Facilities
Verification Test Plan (Including Performance Test Description)
Materials and Processes
Mechanical/Structural analyses
Test plans and test procedures
Schedule
Any risks
Issues and concerns
3.2.15 Pre-Ship Review (PSR)
Title: Pre-Ship/acceptance Review Presentations CDRL No: PM 15
SOW Paragraph: 2.2.4-D
Use:
The Pre-ship review will demonstrate that the contractor has completed all contractual requirements identified in the Spec and SOW of this contract.
Maturity/Delivery Date:
Preliminary 7 Calendar days before Flight Structure acceptance review
Final: presented before final acceptance
Preliminary EIDP shall be presented along with any design changes
- Final Verification Matrix for items in the SPEC DILS SOW and MAR
- Preliminary EIDP
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
3.2.16 End Item Data Package
Title: End Item Acceptance Data Package CDRL No: PM 16
SOW Paragraph: 2.2.4-E
Use:
The end Item data package documents the design fabrication, assembly, test, and integration of the hardware being delivered and is part of the end item delivery.
Maturity/Delivery Date:
Preliminary 7 calendar days before PSR’
Final at PSR’s
The following items shall be included:
- The deliverable item name, serial number, part number, and classification status
(Flight, non-flight, GSE, LLVIS
- Appropriate approval signatures.
- As Built Serialization
- As built configuration
- In process Work Orders (available for review at contractors)
- Final assemblies and test work orders
- Major MRB actions
- Major anomaly reports with root cause and corrective action disposition
- Acceptance test procedures and reports, including environmental testing
- As built parts and materials list.
- Chronological History including total operating hours, mechanical cycles and remaining cycle life
- As built final assembly drawings
- Photo documentation with images per 3.2.9
- Waivers/Deviations
- Operations manual including setting and resetting the assemblies while in use
Certificate of compliance
3.2.17 Monthly Status reports
Title: Monthly Status reports CDRL No: PM 17
SOW Paragraph: 2.2.6-B
Use:
Provide monthly status to identify technical and schedule progress
Applicable Documents: None
Reference Documents: None
Maturity/Delivery Date:
Monthly Reports are due with updates by the end of 3rd week in the month
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
a. Description of work performed, including updated milestone plan
b. Status of open waiver requests.
c. Cumulative action item list showing open and closed action items with
ECD and assigned responsibility, as well as status of any open action items.
d. Description of significant problems and proposed solutions.
e. Risk and Opportunity management listing and status.
f. Status of Class I and Class II changes.
g. Material Review Board status.
h. Part and material status including subtier supplier status.
i. SDRL delivery status.
j. Other items as defined in applicable sections of the MAR.
3.2.18 Drawing Tree
Title: Drawing Tree CDRL No: SE-1
SOW Paragraph: 3.1.2-B
For ready reference list of all GSE and flight drawings and documents.
Maturity/Delivery Date:
Preliminary: 5 days before each MRR
- The drawing tree shall list all drawings for the Flight structure and separately for the
GSE.
- The drawing trees shall be organized and identified to serve as a ready reference list.
- The drawing tree shall identify drawings by name and number.
- The drawing tree shall include a brief description of each drawing.
3.2.19 Document Tree
Title: Document Tree CDRL No: SE-2
SOW Paragraph: 3.1.2-C
For ready reference list of all GSE and flight documents.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Preliminary: 5 days before each MRR
- The document tree shall list all documents for the Flight Structure and separately for the GSE.
- The document trees shall be organized and identified to serve as a ready reference list.
- The document tree shall identify documents by name and number.
- The document tree shall include a brief description of each document.
3.2.20 Flight Structure Fabrication Contamination Control Implementation Plan
Title: Contamination Control Implementation Plan CDRL No: SE-3
SOW Paragraph: 3.1.4-B
Use:
To provide the details of how the contractor contamination control program will be implemented; this information will be reviewed to ensure consistency with the WFIRST contamination requirements.
Applicable Documents: WFIRST-SYS-PLAN-0051 WFIRST Contamination Control Plan
Maturity/Delivery Date:
Draft: 7 days before first MRR
Final: 7 days before flight fabrication MRR
The CCIP shall be prepared in compliance with the WFIRST Contamination Control Plan
(WFIRST-SYS-PLAN-0051), and shall:
1. Identify the contamination sensitive hardware
2. Contain a contamination budget for all phases of the ground and flight operations conducted by the Contractor
3. Reference or include as an appendix the analyses that were used to derive the contamination budget
4. Provide methodology for achieving and maintaining the required cleanliness, including bake-out, purge, cleaning, and bagging
5. Specify which measurement and monitoring methods are used, and provide procedures or references where the methods differ from the practices specified in this document
6. Define the sequence of cleanliness activities, frequency of verification, and the capabilities of the facilities which will be occupied
7. Define the roles and responsibilities of the organizations and individuals which will implement the requirements
8. Provide descriptions of when and how the cleanliness activities are to be reviewed
9. Provide information on design features for contamination control and materials selection criteria
10. Provide information on how to train personnel and assess them
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
11. Define how to deal with situations that may result in cleanliness specifications not being achieved
12. Define single-point failure modes that can affect cleanliness, including equipment failures and human errors
13. Define the risk of cross-contamination between hardware elements
14. Provide references to procedures
3.2.21 Tube Fabrication documentation
Title: Process development Square and Diagonal tube documentation CDRL No: SE-4
SOW Paragraph: 3.2.1-B/a
Use:
To provide all documentation on process development tubes to provide confidence that the tubes can meet out requirements.
Applicable Documents: WFIRST-IC SPEC-0046
Reference Documents: SMA-REQ-0032 WFIRST MAR
Place/Time/Purpose of Delivery:
Plan: At Kick-off
Final: Completion presentation 10 days before tube fabrication
- The Plan shall define process development of tubes for WFIRST
- The Plan shall present the schedule and method for obtaining tolerances. NDE and testing.
- Produce a final report showing proof of fabrication
3.2.22 Adhesive control documentation
Title: Adhesive Process development documentation CDRL No: SE-5
SOW Paragraph: 3.2.1-B/b
To provide all documentation on Adhesive process development.
Place/Time/Purpose of Delivery:
Plan: At Kick-off
Final: Completion presentation: 10 days before Flight tube MRR
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
- The Plan shall define adhesive control process development for WFIRST
- The Plan shall present the schedule and method for obtaining tolerances. NDE and testing.
- Produce a final report showing proof of fabrication
3.2.23 NDE Inspection Standard Documentation
Title: NDE Process development documentation CDRL No: SE-6
SOW Paragraph: 3.2.1-B/c
Use:
To provide all documentation on process development NDE that will provide confidence with the NDE on the Structure.
Place/Time/Purpose of Delivery:
Plan: At Kick-off
Final: Completion presentation: 10 days before Flight tube MRR
Preparation Information:
- The Plan shall define NDE process development for WFIRST
- The Plan shall present the schedule and method for obtaining all NDE and to identify the areas that will not be inspected after assembly.
- Produce a final report showing proof of inspection included the method of passing the information on to WFIRST for future NDE
3.2.24 Test Article inspection reports for the Process development
Title: Test article inspection reports CDRL No: SE-7
SOW Paragraph: 3.2.1-B/d
Use:
To provide all documentation on process development that will provide confidence with the flight structure fabrication.
Place/Time/Purpose of Delivery:
Plan: At Kick-off
Final: Completion presentation: 10 days before Flight tube MRR
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
- The Plan shall provide what will be presented based on the process development for
WFIRST
- The Plan shall present the schedule and methods.
- Produce a final report showing proof of inspection included the method of passing the information on to WFIRST for future.
3.2.25 Spare Parts Plan and List
Title: Spare Parts Plan and List CDRL No: SE-8
SOW Paragraph: 3.2.3-B
Use:
To provide a spares plan and list that identifies the Contractor’s spare parts and their quantities.
Applicable Documents: WFIRST-SMA-REQ-0032 WFIRST MAR
Reference Documents: NPR 8705.4 Risk Classification for NASA Payloads
Place/Time/Purpose of Delivery:
Plan: At Kick-off
List: 7 days before tube fabrication
- The Plan shall define and justify the spares proposed for WFIRST
- The Plan shall present the schedule and method for obtaining the spares.
- The List shall provide a listing of spare parts, including the estimated lead-time if not obtained.
3.2.26 IC Development Test Assemblies Plan
Title: IC Development Test Assemblies plan CDRL No: IT-1
SOW Paragraph: 5.2-A
Use:
To provide an understanding of all the test assembly component manufacturing, pre- test review before integration. To assure all parties that manufacturing/production is ready to begin either in house or at a supplier.
Maturity/Delivery Date:
Preliminary 20 days before any subscale testing
Final: 10 days before any subscale testing
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
The Plan shall include details on all the processes for making the product in house or at a supplier, including the following where applicable:
Production Flow Diagram
Qualification Status/Plans for Production Processes
Qualification/Environmental Test Plans and Test Flow
Production Quality Control Plan o Mandatory Inspection Points (MIPS)/Key Inspection Points (KIPS) o Model integrity control o Build execution controls o Production Planning Record o Sequence of post-build processes o As-built part inspection
Inspection and Measurement Documentation Plan o Non-Destructive Evaluation o Proof Testing o Dimensional
Electronic data records
Fabrication, test, and assembly procedures
Plan for production tooling and test equipment usage
Certification plans of all production tooling and test equipment
Control methods for all safety hazards
Materials Identified
Equipment identification and certification requirements
Personnel identification and certification requirements
Contingency Plans
Risk Assessment, mitigation, and recovery plans
3.2.27 Assembly Plan
Title: Assembly Plan CDRL No: IT-2
SOW Paragraph: 5.3-A
Use:
To define Assembly Plan shall be generated by the contractor to describe the details of how the assembly will be identified specifically.
Maturity/Delivery Date:
Preliminary 60 days before flight structure assembly MRR
Final 30 days Before Final Assembly MRR
3.2.28 Verification Plan
Title: Verification Plan CDRL No: IT-3
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
SOW Paragraph: 5.4-A
To define Verification Plan shall be generated by the contractor to describe the details of how the analyses, inspections, and verification tests identified in the WFIRST-IC-SPEC-0046
Specification will be performed.
60 days ACA
3.2.29 Individual Test Plans
Title: Individual Test Plans CDRL No: IT-4
SOW Paragraph: 5.4-B
Use:
To define a test plan for each test
Applicable Documents: None
Reference Documents: None
Final: 30 days prior to subscale test start
The Test Plans shall document the Contractor's plan for conducting the test and analyzing the test results to verify that the system meets the performance requirement.
The Test Plans shall include the following.
a) Title of the test.
b) Contractor’s name.
c) Contract number.
d) Test description and conditions.
e) Test objectives(s), including references to the requirements being verified and pass/fail criteria for each requirement.
f) Description of the hardware under test including:
1) Name
2) Model number, part number.
3) Type of item for example engineering model, prototype, proto-flight or flight.
4) Configuration.
g) Required test support equipment, GFP, and ground support equipment including description.
h) Test facilities.
i) Quality assurance provisions.
j) Safety requirements.
k) Pretest analysis, including test predictions, if applicable.
l) Test approach, test levels and sequence of test runs.
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
m) Instrumentation list including description and figures
n) Required data recording, reduction including sample calculations, analysis and data output from the test.
o) Pass/Fail criteria for the test, such as: recording of all expected data, allowances for instrumentation failure, proper operation of test equipment, etc.
p) Documentation requirements.
q) List of references.
r) List of acronyms and abbreviations.
3.2.30 Test Procedures
Title: Test Procedures CDRL No: IT-5
SOW Paragraph: SOW 5.4-D
Use:
To provide detailed step-by-step procedures required to perform component, subsystem and system tests per the Individual Test Plans (IT-5).
Final: 10 days prior to subscale test start
Test Procedures shall document the detailed procedure for conducting the test to verify that the system meets the performance requirement.
Test Procedures shall include:
a) Title of the test
b) Contractor’s name and address
c) Contract number
d) Test description and conditions
e) Test objective(s)
Test Procedures shall include complete identification of the item tested including the following:
a) Name
b) Model number, part number and serial number
c) Type of item, for example: engineering model, prototype, proto-flight or flight
d) Applicable engineering changes
e) Date of manufacture
f) Configuration
Test Procedures shall include identification of objective and criteria established for test by the applicable test plan including:
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
a) Required test parameters
b) Performance requirements
c) Acceptance or compliance limits
d) Environmental criteria.
Test Procedures shall include identification of each item of test equipment used in the test including the following:
a) Name
b) Model number
c) Serial number
d) Manufacturer
e) Calibration status and coefficients
f) Accuracy data
g) Software version, if applicable
Test Procedures shall include a description of the physical set up used to conduct the test including the following:
a) Location and orientation of the test item.
b) Location, identification, orientation and settings of test equipment and instrumentation
c) Location and orientation of interconnections and cables.
d) Facility location and requirements
e) Grounding scheme
Test Procedures shall include detailed step by step descriptions of test procedure including
a) Test set up
b) Test item operating limits and test conditions
c) Measurements required
d) Operations required to obtain the data
e) Generation of data files and plots required for test reports, i.e. overlay plots, etc
Ff) Test break down
Test Procedures shall include any special support requirements including
a) Use of special facilities or test ranges
b) Personnel requirements
c) Unusual electrical, hydraulic or pneumatic requirements
d) Support equipment
Test Procedures shall include
a) Hazardous situations, operations and abort conditions
b) Responsibilities and chain of command
c) Contamination control procedures
d) Quality assurance provisions
e) Safety requirements
f) Pass/Fail criteria for unit under test
g) List of references
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
h) List of acronyms and abbreviations.
Test Procedures shall also include software test procedures/descriptions (similar to NASA-
STD-2100-91 CDRL A200) with the following items:
- Test name and number;
- Test hardware and software set-up and initialization procedures;
- Software preparation and loading (if necessary);
- Test cases;
- Step-by-step descriptions of each test;
- Test inputs and expected outputs;
- Pass/fail criteria;
- Requirements traceability.
3.2.31 Test Reports
Title: Test Reports CDRL No: IT-6
SOW Paragraph: 5.4-H
Use:
To report compliance with system specification requirements and/or provide a summary of testing and analysis results, including conformance, nonconformance, and trend data.
Maturity/Delivery Date:
Preliminary 2 days after test
10 days after test completion
Each Test Report shall include:
Test Set up (description, drawings and photos)
As Run Test Procedure, including deviations
Test Result details including narratives, plots, photos, tables, etc appropriate for the test, provided in a consistent manner (format, scaling, etc.) so that results from different units can be readily compared
Pass/fail criteria and comparison to test predictions
Data analysis for how test results were used to verify requirements, update/correlate models, etc.
Details of test anomalies
3.2.32 Transportation Handling Plan and Procedures
Title: Transportation Handling Plan and Procedures CDRL No: IT-7
SOW Paragraph: 5.5-B
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
To provide the instructions and procedures for safe and effective packaging, handling, storage, and transporting of the Flight Structure, and associated GSE for final delivery to GSFC.
Maturity/Delivery Date:
Preliminary: 60 days prior to IC CDR
Final: 30 days before PSR
The Transportation Handling Plan and Procedures shall discuss the plan and all of the step-by-step procedures for the packaging, handling, and transporting of the flight structure, and any subsystems, spares, and GSE to NASA GSFC. The documentation shall include:
a) Nomenclature of all supportive equipment
b) Plan for calibration and load testing of any handling equipment
c) Identification of special environmental conditions, such as cleanliness, temperature, humidity, etc., and the controls to be implemented to maintain those conditions
d) Identification of monitoring during transport, i.e. temperature and shock recorders
e) Format for recording QA stamp, deviations, and approval columns
f) Requirements for special tools, equipment, special handling fixtures and containers
g) Method of transportation and carrier
h) Procedures to comply with local, state, and federal safety requirements
i) Procedures for maintaining contact with the transported item (where applicable)
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Appendix A Abbreviations and Acronyms
Abbreviation/
Acronym
DEFINITION
ACA After Contract Award
AI&T Assembly, Integration, & Test
CA Control Account
CAD Computer Aided Design
CCB Configuration Control Board
CCR Configuration Change Request
CDR Critical Design Review
CM Configuration Management
CMO Configuration Management Office
CO Contracting Officer
DILS Deliverable Items List and Schedule
EDU Engineering Development Unit
EEE Electrical, Electronic, and Electromechanical
EGSE Electrical Ground Support Equipment
EIDP End Item Data Package
EOL End of Life
ETU Engineering Test Unit
FEM Finite Element Model
GFP Government Furnished Property
GSE Ground Support Equipment
GSFC Goddard Space Flight Center
IC Instrument Carrier
ICD Interface Control Document
IM Integrated Modeling
ISR Individual Subcontract Reports
MEL Master Equipment List
MICD Mechanical Interface Control Document
MMG Math Model Guidelines
NASA National Aeronautics and Space Administration
NASTRAN NASA Structure Analysis
NFS NASA FAR Supplement
NPR NASA Procedural Requirements
PDR Preliminary Design Review
PER Pre-Environmental Review
PSR Pre-Ship Review
RFA Request for Action
SDR System Definition Review
SI International System of Units
SIR System Implementation Review
SOW Statement of Work
Flight Structure Fabrication WFIRST-IC-LIST-023, Revision
Abbreviation/
Acronym
DEFINITION
SSR Summary Subcontract Reports
WBS Work Breakdown Structure