This PowerPoint presentation details the Norfolk District North Atlantic Division's James River Maintenance Dredging Industry Day for a 5-Year Single Award Task Order Contract (SATOC). The contract has a total capacity of $47 million, is 100% small business set-aside under NAICS 237990, and is targeted for solicitation in February 2026 with an anticipated award in July 2026. The primary scope involves maintenance dredging of approximately 1.0 million cubic yards of fines and sand along a 90-mile waterway from Hampton Roads to Richmond, VA, with dredging depths up to -27 feet MLLW and channel widths of 200-300 feet.

Key project specifications include cutter-head pipeline dredging with upland and overboard placement, environmental restrictions (no dredging from February 15 to June 30 to protect anadromous fish), and specific environmental monitoring requirements including endangered species observation, water quality testing, and total suspended solids management. Task orders are expected to range from $500,000 to $5 million, with 2-3 task orders per contract year. Production rates are estimated at 7,500 cubic yards per day for lower and middle James River sections and 3,000 cubic yards per day for the upper James River, utilizing placement sites like Curles Neck and Richmond Deepwater Terminal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Norfolk District North Atlantic Division

James River Maintenance Dredging Industry Day 18 November 2025

Agenda

Opening Remarks Norfolk District Contracting

James River Maintenance Dredging IDIQ & Seed Task Order

5-Year SATOC Capacity: NTE $47,000,000 100% Small Business Set Aside NAICS 237990 ($37 million SB Size Standard)

Estimated Dates:

FEB 2026- Invitation for Bid (Sealed Bidding) Solicitation JUL 2026- Award

Norfolk District Dredging Program Execution Schedule FY 2025 - FY 2026

Type of Dredging WorkProject NameAcquisition Strategy
Stand Alone Contract or IDIQSmall Business or UnrestrictedEstimated Price RangeScheduleNotes
Cutterhead Pipeline and Mechanical DredgingNorfolk Harbor Inner Channels and CNN DeepeningStand AloneUnrestricted$50M - $100M3Q FY229M cubic yards; maintenance and new work dredging; fines and sands; upland placement.
Cutterhead Pipeline DredgingJames River Maintenance Dredging5-year IDIQ SATOCUnrestricted$25M - $50M4Q FY221M to 1.5M cubic yards; maintenance dredging; upland and overboard placement; fines and sands.
Mechanical DredgingNorfolk Harbor Maintenance Dredging
Stand AloneUnrestricted$10M - $25M4Q FY221M cubic yards; maintenance dredging; ocean placement of dredged material at NODS. fines and sands
Hopper DredgingAtlantic Ocean Channel Deepening (Phase 1)Stand AloneUnrestricted
$25M - $50M
4Q FY22
2M to 2.5M cubic yards; maintenance and new work dredging; placement at Craney Island; sandy dredged material.
Cutterhead Pipeline and Mechanical DredgingFort Eustis 3rd Port ImprovementsStand AloneTBD$5M - $10M4Q FY2225K cubic yards; marine construction and new work dredging; upland placement; fines and debris; demolition.
Cutterhead Pipeline DredgingLynnhaven Inlet Maintenance DredgingStand AloneSet Aside to Small Business$1M - $5M3Q FY23200K cubic yards; beach placement and upland placement at several locations; sandy dredged material. IIJA
Cutterhead Pipeline and Mechanical DredgingMilford Haven Maintenance Dredging and Jetty RepairsStand Alone
Set Aside to Small Business$5M - $10M4Q FY2325K cubic yards; one contract to perform jetty repairs and maintenance dredging; beach placement; sandy dredged material. IIJA
Hopper DredgingAtlantic Ocean Channel Deepening (Phase 2)
Stand Alone
Unrestricted$25M - $50M4Q FY235M to 5.5M cubic yards; maintenance and new work dredging, sandy dredged material; beach placement and placement at DNODS.
Mechanical DredgingSouthern Branch Maintenance DredgingStand AloneTBD$5M - $10M4Q FY23
250K cubic yards; maintenance material; fines and potential contamination; upland placement and landfill.

James River Channel Vessel Types

Commerce slide Make a general statement that the Non-Federal Sponsor is the Virginia Port Authority

Restrictions

Make a general statement that the Non-Federal Sponsor is the Virginia Port Authority

Restrictions

Make a general statement that the Non-Federal Sponsor is the Virginia Port Authority

James River Channel

Scope of Work:Maintenance Dredging
Quantity:Approx. 1.0 MCY
Material Type:Fines, Sand
Placement Area:Upland and Overboard
Type of Equipment:Cutter-head Pipeline
Environmental Windows:No Dredging 15 Feb – 30 Jun

90 miles of meandering waterway from Hampton Roads to Richmond, VA Maximum pay prism depths -27 feet MLLW. Maintained width is 300 feet to Hopewell and 200 feet Richmond to Hopewell.

Approx Yearly Quantity is pay and non-pay excess yardage.

Time of Year Restriction – to be covered later

Bank Height (excerpt)

1 foot rule for average bank height Average bank height calculation No unit price adjustment due to variation of the average bank height

Under previous IDIQ Contracts for maintenance dredging on the James River, some Task Orders were awarded that required dredging at less than the most efficient height of work face (bank height). Navigation needs on the James River will at times result in the Contracting Officer issuing Task Orders for dredging with less than the optimum bank height. The Table that follows at the end of this SECTION is a history of the Task Orders issued under the three previous IDIQ Contracts. This history is furnished for the Contractor’s information only. The Government will not be held responsible for conclusions drawn from this information. Except under emergency situations, Task Orders will not be issued for a shoal dredging area with an average bank height of less than 1 foot. Average bank heights will be computed using the required and allowable dredging volume divided by the entire, cross-hatched, dredging area, excluding side slopes. There will be no adjustment in the unit price due to variation of the average bank height.

Task Orders (Sample Scope of Work)

The work to be performed under this IDIQ Contract Task Order will be on the Middle James River and includes Dancing Point to Swann Point channel. The work to be performed are the items defined in contract and specification section 01 22 00, contract line items number XXXX, XXXX, XXXX, XXXX, and all associated work as defined in the contract specifications. Plan Drawings will not be issued for this Task Order. A Before Dredging survey of each dredging area will be performed upon receipt of the Contractor’s advance notice for dredging, as stipulated in Section 35 20 23, paragraph 1.X.X acceptance sections, Contractor designated acceptance sections shall be for contiguous areas, full width of the channel, identified by station numbers, and shall not exceed two acceptance sections for each channel segment identified for maintenance dredging within the task order issued.

The Contractor shall begin work as soon as the Notice to Proceed (NTP) is given from the Contracting Officer. The Contractor shall begin performance within XX calendar days and complete all work within XXX calendar days after receiving notice-to-proceed.

Portions of Dancing Point to Swann Point on the James River Federal Navigation Project are to be dredged in the order indicated below, up to full channel width, to the following elevations:

Dancing Point-Swann Point Channel, Station -20+00 to Station 379+33.9; -26 Feet MLLW One foot of over depth dredging will be allowed.

Actual dredging areas, dredging widths, and associated dredging volume will be determined based on results of the Before Dredging (BD) Surveys for each channel as indicated.

Prior to the commencement of work, a Before Dredge (BD) Survey will be performed for each acceptance section to be dredged. For each acceptance section surveyed, the Government shall provide the Contractor in a timely manner, BD drawings indicating the required dredging locations, required and allowable dredging depths, and available pay volume.

Task order magnitude $500,000 to $5M; 2 to 3 Task Orders per Contract Year

Period of Performance Considerations

Mobilization and Demobilization = 21 days Transportation of plant and equipment between channel elements = 2 days

Production rates for the Lower and Middle James based on 7,500 cubic yards per day Production rate for the Upper James based on 3,000 cubic yards per day (upland placement site work)

Curles Neck Upland Placement Site

Upland Placement Site Example – Curles Neck Maximum crest height approx. 34 feet MLLW

Richmond Deepwater Terminal Upland Placement Site

Upland Placement Site Example – RDWT RDWT maximum crest height approx. 80 feet MLLW on south cell

Tribell Shoal Overboard Placement Site

Overboard Placement Site Example – Tribell Shoal Highlight contractor capability required to pump long distances. This slide indicates the maximum pumping distance expected on the project (Upper and lower James).

Average pumping distances are not expected to exceed 10,000 linear feet for the lower/middle James, with the exception of Tribell Shoal.

Average pumping distances are not expected to exceed 7,500 linear feet for the upper James, with the exception of RDWT to Hopewell

James River Channel Environmental Considerations

PROTECTED SPECIES

Native habitat for anadromous fish, sturgeon and other wildlife protected by federal law or species of special concern for the State of Virginia

Time of Year Restrictions (TOYR) for dredging activities Lower James – February 15th through June 15th of any year to protect anadromous fish populations and shellfish Middle James – February 15th through June 15th for Goose Hill Shoal and February 15th through June 30th of any year for Dancing Pt – Swann Pt, Jordan Pt-Harrison Bar to Windmill Pt, and City Point Shoals to protect anadromous fish Upper James – February 15th through June 30th of any year to protect spawning habitat for anadromous fish

ENDANGERED SPECIES MONITORING

Endangered Species Training provided by USACE Designate a look-out to monitor visible action area from dredge plant Look for parts/pieces of Atlantic sturgeon entrained in the cutterhead, floating around the dredge or collected in the inflow pond inside the upland placement area Document observations and notify Contracting Officer Representative ASAP Follow “Sturgeon Incidental Take Procedures” Fin clips Measurements, photos, specimen preservation

WATER QUALITY MONITORING (Upper James)

Comply with requirements for Section 404 of the Clean Water Act for discharges associated with confined disposal facilities Manage spillboxes to ensure adequate ponding depth for effective sedimentation & to maximize use of available effective weir length ensuring that only clarified supernatant flows over the weir crest.

The Contractor must maintain a daily average Total Suspended Solids (TSS) concentration of less than 500 mg/l. The “less than” 500 mg/l TSS concentration is a threshold limit and not a TSS target or goal.

WATER QUALITY MONITORING (Upper James)

Environmental Testing and Upland Effluent Measurements

TSS samples Collected every 12 hours at weir crest of each operating spillbox Hach 900/DR Colorimeter model #9385100, program 94 “Suspended Solids”, or approved equal 1000 ml wide mouth polyethylene bottle (Nalgene 2104-0032 or equal) Visual inspection for clarified water required every 4 hours at each operating spillbox Spillboxes shall be maintained, and weir boards adjusted so that only clarified water is released.

Dissolved Oxygen samples Collect instream dissolved oxygen concentrations at a minimum of once per day during return flow operations at each discharge location into receiving waters, during the period of July 1st through October 31st of any year.

Hach Hydrolab MS5/DS5 Multiprobe Water Quality Meter or approved equal is required for DO collection.

WATER QUALITY MONITORING (Upper James)

Environmental Testing and Upland Effluent Measurements

Upland Placement Site Effluent Discharge At the direction of the Contracting Officer and during active dredging operations of the Upper James River Shoals, chemical sampling and testing of dredged material effluent water overtopping weircrest of each operating spillbox may be required.

CO will direct contractor to complete sampling and testing with an independent qualified analytical laboratory and environmental services provider to ensure integrity and validity of water quality compliance test results.

Analytical laboratories must be Virginia Environmental Laboratory Accreditation Program (VELAP) certified.

Analytical results of dredged material discharge shall be delivered to the CO.

ENVIRONMENTAL PROTECTION PLAN (E.P.P)

Contractor must submit E.P.P that includes:

Spill Control Plan Hazardous Waste Controls Non-hazardous Solid Waste Disposal Plan Recycling & Solid Waste Disposal Plan Contaminant Prevention Plan Historical, Archaeological, Cultural, Biological, & Wetland Resources Plan

James River Maintenance Dredging Industry Day Questions Open Discussion

James River Maintenance Dredging Industry Day Conclusion image28.png image29.png

Microsoft_Word_Document.docx

1000: Opening Remarks, Norfolk District Contracting Office

1015: James River Maintenance Dredging Project Background Presentation

- Project Overview – Joseph McMahon, Project Manager

- Environmental Considerations – Chris Turner, Environmental Manager

- Contracting – Nikki Kirtsey, Contracting Officer

1100: Questions from Audience

1115: Open Discussion – Feedback from Industry

1200: Wrap-Up image34.emf image35.png

LIQUID TANKERSDRY BULK CARRIERS

DEEP DRAFT VESSEL TYPES ON THE JAMES RIVER

– AdvanSix

– Dupont

– Associated Asphalt image36.wmf

RESTRICTIONS

– HOPEWELL:

– Max Beam: 93ft 6in

– Max LOA: 601ft

– Max Draft: 24ft possible, currently 23ft

– RICHMOND:

– Max Beam: 85ft 6in

– Max LOA: 559ft

– Max Draft: 22ft possible, currently 21ft 6in

– Max Draft (turning basin / Richmond

Deepwater): 19ft 6in

OF THE JAMES RIVER

LIQUID TANKERS

VESSEL TYPES ON THE JAMES RIVER

– Chemical tankers

– Usually parcel tankers

– Associated Asphalt Hopewell

DRY BULK CARRIERS

– Supramax and Handymax

– 2 – 5 hold vessels

– Navigational restrictions

Richmond Barge & Terminal Investments

• 14 Ocean Carriers offering Bill of Ladings

• Off-hours Drop Lot offering 24/7 flexibility

• Technology Enhancements

• Lighting Upgrades

• Permanent Custom Portals

DRAFT

– Significance of continual funding

– Maintenance dredging

– Condition surveys

– Additional projects image37.emf

DRAFT

– Significance of continual funding

– Maintenance dredging

– Condition surveys

– Additional projects

– HOPEWELL:

– Max Beam: 93ft 6in

– Max LOA: 601ft

– Max Draft: 24ft possible, currently 23ft

– RICHMOND:

– Max Beam: 85ft 6in

– Max LOA: 559ft

– Max Draft: 22ft possible, currently 21ft 6in

– Max Draft (turning basin / Richmond

Deepwater): 19ft 6in

LIQUID TANKERS

– Chemical tankers

– Usually parcel tankers

– Associated Asphalt Hopewell

DRY BULK CARRIERS

– Supramax and Handymax

– 2 – 5 hold vessels

– Navigational restrictions

Richmond Barge & Terminal Investments

• 14 Ocean Carriers offering Bill of Ladings

• Off-hours Drop Lot offering 24/7 flexibility

• Technology Enhancements

• Lighting Upgrades

• Permanent Custom Portals image38.wmf image39.tmp

Microsoft_Excel_Worksheet.xlsx Sheet1 image40.emf image41.png image42.png image43.png image44.jpg image7.jpg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image13.png image11.png image14.png image15.tiff image16.png image17.png image18.png image19.png image20.tiff image27.png image30.png image31.png image32.png image33.png image8.jpeg image9.PNG image10.jpeg image12.png