INDUSTRY DAY for James River IDIQ Q_A SESSION.pdf

PDF 534 KB Posted

Attached to
James River Dredging Industry Day-Post Event Docs
Solicitation number
W9123626Z1AUOc
Issued by

About this file

This document is a Virtual Industry Day Q&A session minutes for the James River Maintenance Dredging project, scheduled for November 18, 2025, from 10:00 AM to 11:00 AM. The document details the initial requirements for a Task Order 1 (TO1) associated with an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The project involves two primary events: first, earthwork to create capacity for TO1 material, and second, the actual dredging work. A recent site visit revealed that the upper tier spillboxes at Richmond Deepwater Terminal are full of material and require excavation and unplugging of pipe outfalls before dredging inflow operations can commence. The project manager noted that any major rehabilitation beyond these initial tasks will need to be addressed through a separate contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

James River Maintenance Dredging

VIRTUAL INDUSTRY DAY

November 18, 2025, 10:00 AM to 11:00 AM

I. Q&A SESSION

Q1: What are the requirements to prepare the placement sites and other dike work?

Project Manager: Task Order 1 (to be awarded with the IDIQ), will include earthwork to create capacity for TO1 material as the first event. The second event will be the dredging work. From a recent site visit, the upper tier spillboxes at Richmond Deepwater Terminal are full of material and will need to be excavated and pipe outfalls unplugged prior to commencement of dreding inflow operations. Any other major rehabilitation will have to be a separate contract.