About this file

Questions Answers 1/11/2010

View the file

Other files

File Type Posted
FDR - Elevator 1 Controller.JPG JPG image
FDR-SKS001.pdf PDF
FDR-SKA001.pdf PDF
Documents from EYP ftp website.doc DOC document
FDR-PH1-PDF Specs Vol 2 Zip.zip ZIP file
FDR Renovation Phase 1 RFP Sections A thru M.zip ZIP file
FDR-PH1-PDF Dwgs —
FDR-PH1-PDF Dwgs —
FDR-PH1-PDF Dwgs —
FDR-PH1-Specs-VOL 1.pdf PDF
FDR-PH1-PDF Dwgs —
FDR Renovation Phase 1 RFP Sections A thru M.zip ZIP file
FDR-PH1-Specs-VOL 1.pdf PDF
FDR-PH1-PDF Dwgs —
FDR-PH1-PDF Specs Vol 2 Zip.zip ZIP file
FDR-PH1-PDF Dwgs —
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Franklin D. Roosevelt Presidential Library & Museum - Phase 1 Solicitation Questions, Clarifications, and Responses Solicitation # NAMA-10-SEM-0001

Revised: January 11, 2010 Clarification 1:

Specification Section 08710 – “Door Hardware.”

General Note: Locks for which high-security cylinders are specified will be fitted with six-pin cylinders as specified, but must be capable of being upgraded to seven-pin cylinders.

1. At Codes 301 and 302, change 01 lever to 12.

2. At Codes 401 thru 409, change design CSB to DSB.

3. Add Code 411: 1 ea. cylinder cover plate, Baldwin 6755 US3 (to match existing).

4. Add Code 412: 1 ea. dummy knob & rose; Baldwin 5030 x 5002 US3 (to match existing).

5. At Door S002 add Codes 411 and 412.

6. At Door 127 add note “salvage and reinstall existing dummy knob and cylinder cover plate.”

Clarification 2:

Door #215 will be a pair of all-glass entrance doors.

Questions:

1. Detail 8/A-501 shows a handrail extending only 6” above a stair landing. Should it continue up the 3’-0” dimension shown above the landing?:

Answer:

The railing should be sloped please refer to attached sketch SKA-001. This sketch replaces Detail 8, Sheet A501.

2. Detail 7/A-502 shows a rail running parallel to the stringer. 8/A-501 shows the rails to be horizontal. Which is correct?

The detail is intended to convey the tread construction. See sketch SKA-001 related to question #1 above.

3. Is elevator #1 hydraulic? Please provide some information on the equipment to be relocated to the new Elevator Machine Room.

Yes, please refer to electrical drawings for scope of electrical equipment. Additionally, the elevator controller must be relocated and re-piped to the existing hoistway, refer to attached photograph of controller.

SEQ CHAPTER \h \r 1Acceptance Testing: On completion of relocation of elevator equipment, and before permitting elevator use (either temporary or permanent), perform acceptance tests as required and recommended by ASME A17.1/CSA B44 and by governing regulations and agencies.

Contractor to use an elevator inspection contractor that is independent of the elevator manufacturer to perform the testing and to issue the elevator certificate Contractor to submit SEQ CHAPTER \h \r 1Inspection and Acceptance Certificates and Operating Permits for normal, unrestricted elevator use to the Authority Having Jurisdiction (NARA).

Advise Owner (NARA) in advance of dates and times that tests are to be performed on elevators.

4. Notes on AD102 call for the FDR and Churchill busts to be removed and relocated to new pads, and reference the structural drawings. The structural drawings do not show this work. The civil drawings call for them to remain and be protected. Please clarify.

Scope outlined on AD102 is correct; reference to Structural drawings is incorrect. Refer to specification Section 01351 – “Special Procedures for Historic Treatment.”

5. Drawing A-605 shows partition types GB060 and GB061 being installed along existing walls at the Visitors Center. Is this correct or should they e either GA021 or type H011?

Both rooms shall be wall type GB060.

6. At the North and South wings, are the crown mould, clapboard siding and wood sills at the dormers included in Option A or the Base Bid? Same question for the fascia trim at the gables.

Dormer trim, clapboards and sills are included in the base contract pricing. Fascia at the north and south end gables is noted to remain; any work required would be included in Option A.

7. Epoxy resin flooring is not listed in the Finish Schedule. It does appear on the Finish Legend and in the Specifications. Is it used?

Epoxy resin flooring shall be provided in Mechanical room 211 in lieu of sealed concrete indicated on the finish schedule.

8. Spec. section 08592 satisfies the requirement of sash replacement for the 1939 dormer windows. Please specify a replacement window for the 1972 dormers.

Window Schedule Clarification, Drawing A902:

Scheduled window openings to be included in the base contract pricing are: 40, 41, D1, D2, D3, D4, D5, D6, D7, D8, D9, D10, D11, D12, D13, D14, D15, D16, D17, D18, D19, D20, D21, D22, D23, D24, D25, D26, D27, D28, D29, D30, D31, D32, and 183.

Scheduled window openings that are to be excluded from the base contract pricing are: 1, 2, 3, 4, 5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 35, 35A, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 66A, 67, 67A, 67B, 67C, 67D, and 181.

All dormers are to receive new wood windows.

Two windows scheduled to receive new wood sash are: 40 and 41

Window 183 is an interior HM fixed window located in Processing Room 203.

Refer to drawings for specific work related to existing louver openings.

Replacement Windows for Dormer: Provide new wood windows capable of withstanding the effects of loads noted on the Structural Drawings. Provide new wood windows from same manufacturer listed for new wood sash, following same criteria and requirements noted for new wood sash.

Warranty: Both new sash and new windows shall carry a 2-year manufacturer’s window warranty and a 10-year manufacturer’s insulated glass warranty.

9. Please indicate which areas of the existing stone veneer are to be repointed, per section 04902. Paragraph 3.6A calls out six conditions requiring repointing, but for bid purposes can a quantity be provided, or can we furnish a unit price?

Selective masonry repointing has been deferred to Phase 2 of the project, no unit price is required. Cutting and patching of existing masonry for new openings and infill of existing openings indicated on the drawings includes pointing of new and exposed masonry joints.

10. Please provide a manufacturer for wood doors. Fire rated mineral core doors are not a millwork item.

SEQ CHAPTER \h \r 1Algoma Hardwoods, Inc.

Eggers Industries

Maiman Company (The).

Material and construction quality requirements for interior and exterior wood doors, including warranty requirements, are included in Section 08212 – “Stile and Rail Wood Doors.”

11. Please confirm there are no fire alarm devices required in the attic. None are shown on FA105.

Answer: Correct. Fire alarm devices are not required in the attic.

12. Notes on FP001 and FP101 state that the antifreeze loop for the sprinkler system services Vault 025A and Electric Vault 025B. However, FP101 shows no piping and no sprinkler heads in these spaces. Please clarify.

Anti-freeze system will not serve electrical vault 025B and vault 025A, only the loading dock on the main level.

On drawing FP001, detail 11 shall be revised to list the loading dock as the sole area of protection for the antifreeze system.

On drawing FP101, keyed note #1 shall be revised to read: “Antifreeze cabinet, Refer to detail 11 on Drawing FP001 for antifreeze loop details. Antifreeze loop to supply loading dock on main level [drawing FP102].”

On drawing FP102, keyed note #1 shall be revised to read: “Antifreeze loop to supply loading dock on main level [drawing FP102].”

13. The existing lawn sprinkler system is referenced on P101W, but not shown on the civil drawings. What is the extent of the sprinkler system, just in the courtyard or all around the building?

Answer: The existing conditions below grade have not been surveyed, and as-built drawings are not available. The contractor shall verify the condition, location of the heads, valves and piping arrangement in the field prior to excavation and put proper protections in place. Any parts of the system removed during the project shall be reinstalled and the entire system restored to its original operability.

14. Two units are shown on the Electrical Radiant Heater Schedule on M601, ERH-1 and ERH-2. An ERH note on M206 states “Typ. for 3” and shows a mounting height for ERH-3 thermostat. Please confirm the quantity of radiant heaters.

Answer:

There should be two (2) ERH's specified. The notes related to ERH-3 are incorrect.

15. Below grade piping notes on M002 specify existing 6” CWS&R and 4” HWS&R from the Visitors Center to just outside the lower level mechanical spaces of the Library. Will these pipes have to be removed, regardless of condition, back to the point where drawing M002 shows them transitioning to 5” CWS&R and 3” HWS&R?

Answer:

If the existing pipes are found to be in good condition for reuse (proper joints, depth of bury/padding, and proper expansion compensation, etc), then the existing 6" CWS&R and 4" HWS&R may be used instead of installing new 5" and 3" piping.

16. Per the piping notes on M002, should we figure use and continuation of existing 6” CWS&R and 4” HWS&R, and assume that if they are found to be unsatisfactory, replacement would be additional to the contract? Or, should the cost of removal and replacement be included in our bid?

Answer:

Replacement will NOT be additional to the contract. Contractor should include cost of removal and replacement. If the existing piping is found to be in good condition, NARA will negotiate a credit for the new piping.

17. The below grade piping notes on M002 state that the 6” CWS&R and 4” HWS&R leave the Visitors Center from Chiller Room 016. Please confirm the HWS&R originate at Boiler Room 012.

Answer:

The existing 6" CWS&R and 4" HWS&R piping does indeed leave from the Chiller room, the pipes are visible. If the existing 4" HWS&R piping (from the Chiller Room) is not found to be satisfactory, then the proposed design routes from the Boiler room in order to avoid the corridor congestion from the Chiller Room to the Boiler Room. If the existing 4" HWS&R piping is found to be good for reuse, then a route to the Boiler Room from the exact location of the existing buried piping will be reviewed.

18. What work is associated with the note “repair exist concrete fireproofing” on drawing S105. Is this concrete encasement of the W Beams within the boxed area? Is the existing roof deck concrete? Do the columns need to be encased as well as the beams?

Answer: The work includes repair of the concrete roof and concrete encased W beams. Refer to attached sketch SK-S-001 for revised area of work.

Description: Repair 400 square feet of damaged concrete at the underside surface of the roof slab, 75 square feet of damaged concrete on the vertical faces of the concrete encased beams, and 25 square feet of damaged concrete at the underside of the concrete encased beams. Refer to Division 3 Section "Cast-in-Place Concrete” for acceptable polymer patching mortar products.

19. Specification section 15940 3.4D states "Operator Station Display: indicate the following on operator workstation display terminal:" It seems that the intent was to list a set of BACnet points to be communicated from the air handling unit controller to the main building DDC system. Please provide the list of BACnet points to be communicated between the air handling unit manufacturer's provided controller and the main building DDC system.

The following is a List of points to be communicated from each AHU to the main building DDC:

DDC system graphic

DDC system status, on-off

Outdoor Air Temperature

Unit Normal/Unit Alarm

Unit Occupied/Unoccupied to be changed from BMS

Discharge Temperature

Discharge Humidity

Discharge air temperature for each Reheat coil

Space temperature setpoint for each Reheat zone

Zone Temperature for each zone

Zone Humidity for each zone

Humidifier Alarm for each humidifier

Filter Alarm

Outdoor Air Flow

Freezestat Alarm

Unit Fan alarm

20. Is there a drawing M205 expected to be issued?

Answer: There will NOT be a M205 (roof plan in the sequence) issued.

21. Do existing beams at main, upper, and roof levels require SFRM?

If so, will the steel be ready to spray, or does it have to be scraped before applying SFRM?

Answer: No

22. Do the columns require SFRM? If so, can you provide me with the column type since there is no column schedule?

Answer: No

23. According to the details shown on page a702, the interior frame located at the sound Room is to be 7 ½’’ curtain wall. Is this the correct system desired?

This would be unnecessary due to the size of the frame and the fact that it is interior and all of the loads can be satisfied using a more economical system (material cost, fabrication cost, installation cost).

By switching to an all glass partition system (with the ¾’’ top and bottom rails as specified for the doors) there would be more continuity between the door and the sidelites or if more metal is desired to be shown, an interior storefront system of 1 ¾’’ x 4’’ or 1 ¾’’ x 4 ½’’ can be used at a more economical cost. Please advise.

Answer: Provide narrow stile aluminum-framed system at Sound Booth storefront system and entrance door #215A.

Materials as follows:

-Glazing : ¾- inch thick as indicated in Section 08450. SEQ CHAPTER \h \r 1

-Aluminum: Standard extruded-aluminum framing members of thickness required and reinforced to support imposed loads.

Comply with all other related requirements included in specification Section 08450.

Approved Manufacturer’s for aluminum-framed system include the following:

EFCO Corporation

Kawneer North America

TRACO

Tubelite

24. Spec. section 11160 (2.3B) regarding length of Laminated Tred Dock Bumpers states: “Horizontal Style – 10 inches high by length indicated on Drawings”. We find nothing showing the length of the Laminated Tred Bumpers on Drawings A202 or A602. Please identify the location and length of the laminated tred dock bumpers.

Answer: In Elevation 1/A202 add dock bumpers as follows: (1) 10” length bumper between the scissor lift opening and the access door and (1) 12” length bumper between the scissor lift opening and the stair opening.

25. Spec. section 11160 (2.5) states for the “Steel Finishes” to be “Hot-dip galvanized”. We contacted several of the manufacturers shown including Pentalift Equipment Corp. (shown as the Basis-of-Design) and were told that they do not recommend the Steel Finish to be hot-dip galvanized as this will jeopardize the integrity of the lift. Please confirm the Steel used in the manufacture of the lift does not need to be hot-dip galvanized.

The hot-dip galvanized requirement can be replaced with a factory applied primer and baked enamel finish.

26. Dormer windows:

a) Are the new windows to be made as operating Double/Single-hung or Fixed sash?

New windows are to be operating double hung.

b) If they are to be operable, what balance system is required. the existing system was "friction".

Answer:

Provide SEQ CHAPTER \h \r 1complete sets of window hardware consisting of sash balances (pulleys and weights), pulls, latches, and accessories for each window as required for proper operation. Window hardware shall smoothly operate, tightly close, and securely lock wood windows and be sized to accommodate sash weight and dimensions.

Hardware SEQ CHAPTER \h \r 1Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:

Ball and Ball.

Blaine Window Hardware Inc.

Bronze Craft Corporation (The).

Custom Trades International, Inc.

Parrett Manufacturing, Inc.

Phelps Company.

Material: Solid bronze Retain one of first two subparagraphs below for hung windows; revise to suit Project.

Weight and Pulley Sash-Balance: Concealed weight and pulley balance system including steel or cast iron weights, cast-bronze pulleys, synthetic sash cord; size and capacity to hold sash stationary at any open position.

Window Hardware Finishes: Comply with BHMA A156.18 for base material and finish requirements:Retain one or more finish designations below. If retaining more than one, indicate location of each on Drawings or by inserts.

BHMA 611: Bright bronze, clear coated, bronze base metal.

c) Will the replacement sashes require a new frame? Print # 902 illustrate that the head and sill to be replaced but is unclear about the jambs.

Reference response to question #8 above.

27. Please review project drawing symbols furnished on FA001 and provide further clarifications as the project symbols and bolding do not always reference symbols and bolding/non-bolding features on the project drawings. (example:

a. Drawing FA101. Elev #1, displays a smoke to be removed and replaced with a smoke (assumption this should be for a relay smoke for recall)

Answer: Existing smoke detector shall be removed and replaced with a new smoke detector to initiate elevator recall.

b. Drawing FA102, room 128 depicts a bold smoke with an “e” (assumption for relay smoke for recall)

Answer: Smoke detectors indicated with an “e” shall initiate elevator recall.

c. Drawing FA103, Elev #2, displays a smoke to be removed and replaced with a smoke (assumption this should be for a relay smoke for recall)

Answer: Smoke detectors indicated with an “e” shall initiate elevator recall.

d. Drawing FA104, Elev #1 & 2, (“e” – assumption elevator recall devices)

Answer: Smoke detectors indicated with an “e” shall initiate elevator recall.

e. Drawing FA106, “ETR” – please confirm existing to remain (these are bolded as new..?)

Answer: Fire alarm devices listed as “ETR” are existing to remain.

28. Drawing FA001 indicates fire alarm control panel in security room 023 on the lower level while drawing FA101 indicates fire alarm control panel located in room 028 as does FA301 fire alarm riser diagram. Please provide clarifications.

Answer: Fire alarm control panel (FACP) indicated in Security Room 028 on drawing FA101 indicates the location of the new FACP. FACP shown in Security Room 121 on drawing FA102 indicates the location of the existing FACP. For this phase of work the existing FACP shall remain in service and an interconnection shall be provided between the new and existing FACP.

29. Drawing FA001, Section 3 General Notes #1 – Indicates that a fully functioning, network addressable fire alarm system. Please confirm this network panel shall be networked with the existing addressable fire alarm control panel located in the existing security room 121 as well as both shall report point to point to remote annunciator.

Answer: Correct.

30. Please review and confirm Drawing FA106 fire alarm system work is to be incorporated into the existing addressable fire alarm control system existing in the FDR Visitor Center, Museum Shop Building?

Answer: Fire alarm work indicated for the Visitor’s Center shall be connected into the existing fire alarm system in the Visitor’s Center.

31. Please advise if there is a zone drawing for the requested Vesda Systems, “ASD”?

Answer: No, there is not a zone drawing for the VESDA system. The VESDA system shall provide detection for the following rooms: Archival Storage 209, Archival Storage 210, Archival Storage 214, Archival Storage M02, and Archival Storage 127.

32. Are the Vesda Systems required to integrate directly with the addressable fire alarm control panel with HLI Reporting Interface on the addressable loop or monitoring the Vesda panel?

Answer: Refer to Specification 16721 Section 2.4.D.6.

33. We request a time extension for the bid submittal from 1/25/10 to 1/27/10. By moving the date to the middle of the week, it will allow for us to overnight our bid the night before, rather than Friday the 22nd. It will give contractors the weekend to assemble their bids to us.

Answer: No change, the Offers remain due January 25.

34. The hydrant says remove and reinstall, so is there an existing hydrant with a valve? Does this also mean that there is an existing tee and valve? The inverts are not shown on 1/C103 without invert heights given.

Answer: There is an existing hydrant and valve assembly that will require relocation, as noted on the plan. The contractor shall provide a new tee at the hydrant and a new gate valve assembly north of the relocated hydrant / valve assembly, as shown on Dwg. C102. The installed depth of the hydrant and associated piping is noted on 1/C103 as 5’-0” minimum.