NAVFAC 4330-1 FEAD Cost Breakdown.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- N6945022R0146
About this file
This document contains a solicitation for tree clearing services at Naval Air Station Pensacola, Florida. The Navy is seeking quotes to remove trees and brush from four clear zones surrounding runways at Sherman Field, with work to include surveying, permitting, wetland delineation, erosion control planning, timber cutting, brush mulching, grading, and stabilization. The base period of performance is 365 days from award with optional 60-day periods for additional clear zones. Quotes are due by September 7th, 2022 with award anticipated on September 15th. The contract is set aside for small businesses only and has a total estimated value between $2-5 million, with fixed unit prices required for the base and option periods covering clear zones for runways 25, 1, 19, and 7. A mandatory site visit will be held between August 25-31st.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONTRACT COST PROPOSAL BREAKDOWN | |||||||||||||||||||||
| CONTRACT COST PROPOSAL BREAKDOWN | |||||||||||||||||||||
| BREAKDOWN OF DIRECT COSTS | DATE: | ||||||||||||||||||||
| FEAD PENSACOLA | SOLICITATION #: | N69450 | 22R0146 | ||||||||||||||||||
| ITEMS OF WORK FOR | QTY | UNIT | MATERIAL | LABOR | O | EQUIPMENT | |||||||||||||||
| TITLE/DESCRIPTION: | Sherman Airfield Clear Zone Tree Clearance | Prime Contractor | Unit Cost | Total Cost | Unit Cost | Total Cost | R | Qty | Rate | Total | |||||||||||
| DATE: | 1. | 0 | 0.00 | 0 | 0.00 | 0 | 0 | 0.00 | 0 | ||||||||||||
| 2. | 0 | 0 | 0 | ||||||||||||||||||
| PRIME CONTRACTOR: | 3. | 0 | 0 | 0 | |||||||||||||||||
| CONTRACTOR'S WORK | Revisions/Comments | 4. | 0 | 0 | 0 | 0.00 | 0 | ||||||||||||||
| 1. | Direct Materials | | | 0 | 5. | 0 | 0 | 0 | ||||||||||||||
| 2. | Sales Tax on Materials | 0.00% | of line 1 | 0.00% | 0 | | | 6. | 0 | 0 | 0 | |||||||||||
| 3. | Direct Labor | | | 0 | | | 7. | 0 | 0 | 0 | |||||||||||||
| 4. | Insurance, Taxes, & Fringe Benefits | 0.00% | of line 3 | 0.00% | 0 | | | 8. | 0 | 0 | 0 | |||||||||||
| 5. | Rental Equipment | | | 0 | | | 9. | 0 | 0 | 0 | |||||||||||||
| 6. | Sales Tax on Rental Equipment | 0.00% | of line 5 | 0.00% | 0 | | | 10. | 0 | 0 | 0 | |||||||||||
| 7. | Equipment Ownership & Operating Expenses | | | 0 | | | 11. | 0 | 0 | 0 | |||||||||||||
| 8. | Subtotal | ||||||||||||||||||||| | ||||||||||||||||||||||||||||||||| | 0 | 12. | 0 | 0 | 0 | |||||||||||||
| 9. | Prime's Field Office Overhead | 0.00% | of line 8 | 0.0% | 0 | ||||||||||||||||||||||||||||||||| | 15. | 0 | 0 | 0 | |||||||||||
| 10. | SUBTOTAL (add lines 8 and 9) | | | | | 0 | 16. | 0 | 0 | 0 | |||||||||||||
| Prime's Remarks: | 17. | 0 | 0 | 0 | |||||||||||||||||
| 18. | 0 | 0 | 0 | ||||||||||||||||||
| 25. | 0 | 0 | 0 | ||||||||||||||||||
| DIRECT Prime Contractor's TOTALS | 0 | 0 | R | Total (Rental) | 0 | ||||||||||||||||
| O | Total (Owned) | 0 |
| SUBCONTRACTOR'S NAME: | ITEMS OF WORK FOR | QTY | UNIT | MATERIAL | LABOR | O | EQUIPMENT | ||||||||||||
| 11. | Direct Materials | | | 0 | | | Subcontractor | Unit Cost | Total Cost | Unit Cost | Total Cost | R | Qty | Rate | Total | ||||||
| 12. | Sales Tax on Materials | of line 11 | 0 | | | 1. | 0 | 0.00 | 0 | 0 | ||||||||||
| 13. | Direct Labor | | | 0 | | | 2. | 0 | 0 | 0 | |||||||||||
| 14. | Insurance, Taxes, and Fringe Benefits | 0.00% | of line 13 | 0.00% | 0 | | | 3. | 0 | 0 | 0 | |||||||||
| 15. | Rental Equipment | | | 0 | | | 4. | 0 | 0 | 0 | |||||||||||
| 16. | Sales Tax on Rental Equipment | 0.00% | of line 15 | 0.00% | 0 | | | 5. | 0 | 0 | 0 | |||||||||
| 17. | Equip. Ownership and Operating Expns | | | 0 | | | 6. | 0 | 0 | 0 | |||||||||||
| 18. | SUBTOTAL (add lines 11-17) | | | | | 0 | 7. | 0 | 0 | 0 | |||||||||||
| 19. | Field Overhead | 0.00% | of line 18 | 0.00% | 0 | | | 8. | 0 | 0 | 0 | |||||||||
| 20. | SUBTOTAL (add lines 18&19) | | | | | 0 | 9. | 0 | 0 | 0 | |||||||||||
| 21. | Home Office Overhead | 0.00% | of line | 20 | 0.00% | 0 | | | 10. | 0 | 0 | 0 | ||||||||
| 22. | Profit | 0.00% | of line 20 | 0.00% | 0 | | | 11. | 0 | 0 | 0 | |||||||||
| 23. | SUBTOTAL (Add Lines 20-22) | | | | | 0 | 12. | 0 | 0 | 0 | |||||||||||
| Sub's Remarks: | 13. | 0 | 0 | 0 | |||||||||||||||
| 14. | 0 | 0 | 0 | ||||||||||||||||
| 23. | 0 | 0 | 0 | ||||||||||||||||
| 0 | 0 | 0 | |||||||||||||||||
| DIRECT Subcontractor's TOTALS | 0 | 0 | R | Total (Rental) | 0 | ||||||||||||||
| O | Total (Owned) | 0 | |||||||||||||||||
| SUBCONTRACTOR'S NAME: | |||||||||||||||||||
| 24. | Direct Materials | | | 0 | | | ITEMS OF WORK FOR | QTY | UNIT | MATERIAL | LABOR | O | EQUIPMENT | ||||||||
| 25. | Sales Tax on Materials | 0.00% | of line 24 | 0 | | | 1. | Subcontractor | Unit Cost | Total Cost | Unit Cost | Total Cost | R | Qty | Rate | Total | ||||
| 26. | Direct Labor | | | 0 | | | 2. | 0 | 0.00 | 0 | 0.00 | 0 | 0 | ||||||||
| 27. | Insurance, Taxes, and Fringe Benefits | 0.00% | of line 26 | 0 | | | 3. | 0 | 0 | 0 | ||||||||||
| 28. | Rental Equipment | | | 0 | | | 4. | 0 | 0 | 0 | |||||||||||
| 29. | Sales Tax on Rental Equipment | 0.00% | of line 28 | 0.00% | 0 | | | 5. | 0 | 0 | 0 | |||||||||
| 30. | Equip. Ownership and Operating Expns | | | 0 | | | 6. | 0 | 0 | 0 | |||||||||||
| 31. | SUBTOTAL (add lines 24-30) | | | | | 0 | 7. | 0 | 0 | 0 | |||||||||||
| 32. | Field Overhead | 0.00% | of line 31 | 0 | | | 8. | 0 | 0 | 0 | ||||||||||
| 33. | SUBTOTAL (add lines 31&32) | | | | | 0 | 9. | 0 | 0 | 0 | |||||||||||
| 34. | Home Office Overhead | 0.00% | of line | 0 | | | 10. | 0.00 | 0 | 0 | 0 | |||||||||
| 35. | Profit | 0.00% | of line 33 | 0 | | | 11. | 0 | 0 | 0 | ||||||||||
| 36. | SUBTOTAL (Add Lines 33-35) | | | | | 0 | 12. | 0 | 0 | 0 | |||||||||||
| Sub's Remarks: | 13. | 0 | 0 | 0 | |||||||||||||||
| 14. | 0 | 0 | 0 | ||||||||||||||||
| 23. | 0 | 0 | 0 | ||||||||||||||||
| 0 | 0 | 0 | |||||||||||||||||
| DIRECT Subcontractor's TOTALS | 0 | 0 | R | Total (Rental) | 0 | ||||||||||||||
| O | Total (Owned) | 0 |
| SUMMARY | |||||||||
| 37. | Prime Contractor's Work (from line 10) | | | 0 | | | |||||
| 38. | Sub-contractor's Work (from line 23&36) | | | 0 | | | |||||
| 39. | SUBTOTAL (add lines 37 and 38) | | | | | 0 | |||||
| 40. | Prime's Field Office Overhead on sub. | 0.00% | of line 38 | 0.00% | 0 | | | |||
| 41. | Prime's Home Office Overhead | 0.00% | of line 37 | 0.00% | 0 | | | Prime Contractor Name:_____________________________________ | ||
| 42. | SUBTOTAL (add lines 39-41) | | | | | 0 | |||||
| 43. | Prime's Profit | 0.00% | of line 39 | 0.00% | 0 | | | |||
| 44. | SUBTOTAL (add lines 42 - 43) | | | | | 0 | |||||
| 45. | Prime Contractor's Bond Premium | 0.00% | of line 44 | 0.00% | 0 | | | _________________________________________________________ | __________________________ | |
| 46. | TOTAL COST (Add Lines 44 and 45) | | | | | 0 | Signature & Title of preparer | Date |
File details come from the government source that posted it. Updated .