AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Pre-Proposal Inquiries
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945021Q0021
X 9B. DATED (SEE ITEM 11)
01-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2021
CODE
NAVFAC ENGINEERING SYSTEMS COMMAND SE
PWD CORPUS CHRISTI
8851 OCEAN DRIVE, BLDG 19
CORPUS CHRISTI TX 78419-5021
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
joel.overson@navy.milEMAIL:361-961-3397TEL:
JOEL OVERSON / CONTRACTING OFFICER
N6945021Q0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
PRE-PROPOSAL INQUIRIES
PRE-PROPOSAL INQUIRY
Solicitation Number: N6945021Q0021, B-1869 Concrete, NAS Corpus
Christi, TX
Contractor Name: N/A
Contractor POC (Name and email): N/A
Contracto r PPI#
Section of RFP Question Answer
Scope of Work
Area E, F , G, and H between the two warehouses:
There are downspouts, drainage, power, etc.
terminating below grade or at grade from both sides. Can these blocked out 6" around and left intact as is?
GC may block around.
Scope of Work Can the ware house bays be used for concrete truck delivery? This will avoid the costs of pump trucks as it appears the bay doors will cover distance for truck chutes.
Yes, bays can be used.
Scope of Work Please clarify termination points for areas A &
H. The drawings have to the end of the warehouse; however, there is a fence approximately 3' from warehouse plan N end.
Place concrete formwork outside of fence line posts.
Scope of Work If the fence is to be removed and replaced, will
NASCC do this or will this be the responsibility of the contractor? If the fence is removed, how is the remaining area to be secured? Please confirm the required scope of work for this area.
Fence removal not required.
Scope of Work Area E manhole: Is the concrete around the manhole to be left intact?
Yes, slope new concrete as exiting asphalt slope.
Scope of Work Area E A/C unit: Is the existing A/C unit to be removed and replaced by NASCC? If it is for the GC to schedule, is it under a warranty? Who is the installer/maintenance company?
No it will not be removed and replaced by NASCC. It will be the GC to provide this action.
Unit is not under warranty.
General
There are a lot of government owned items stored around the building that are in the way of getting the demo and concrete work done. Will the Customer have these items removed prior to the start of construction activities or will
Contractor be responsible for storing/relocating items?
ALL OF THE MATERIAL
WILL BE MOVED FOR
ACCESS TO ALL AREAS.
General
The space between Bldg. 11 and Bldg. 1869 is tight (13’). The north end has a fence with a man-gate. A truck would have to back up parallel to the fence at the north end for loading.
FENCING CAN BE
REMOVED FROM
BEGINNING TO END OF
PROJECT.
N6945021Q0021
The issue is possible damage to the fence if not removed first. Can the fencing be removed with only the posts remaining while excavation and concrete placement activities take place? If allowed, would fencing need to be replaced/secured at the end of each day?
General
The south end is open but has an A/C unit next to Bldg. 11 (pad to be replaced by GC per RFQ).
This unit will need to be removed to avoid damage during demolition of the existing asphalt, A/C pad, and bollards. How long can the
A/C be down to the area being serviced by that unit? Would Contractor be responsible for temporary cooling while unit is out of service?
A/C UNIT CAN BE
REMOVED FOR THE
DURATION OF THE
PROJECT.
General
There is a breezeway in the middle of Bldg.
1869 with a high enough roof opening to get equipment and a truck backed in. The issue is loading out of spoils. Loading out the center section between the buildings would require traveling to each end or possibly backing a truck into the breezeway to allow loading. The questions related to this are:
10.a
General
A. Since there are two manholes at the entrance of the breezeway, please confirm that the manholes/underground vault is traffic rated to support the weight of the dump trucks?
Government cannot confirm traffic rating.
10.b
General
B. Will this interrupt the operations of the building by bringing a truck into that area? Is
Contractor held to special hours or weekend work for this activity?
COORDINATION WITH
CUSTOMER WOULD HAVE
TO BE PERFORMED. NO
PROBLEMS ARE FORESEEN.
The following have been deleted:
PRE-PROPOSAL INQUIRIES
(End of Summary of Changes)