N6945021Q0019-0003.pdf

PDF 203 KB Posted

Attached to
B-4792 Sewer Line at NAS Kingsville, TX
Solicitation number
N6945021Q0019
Issued by

View the file

Other files

File Type Posted
N6945021Q0019-0002.pdf PDF
N6945021Q0019-0001.pdf PDF
NASK Map Location of Soil Stockpile.pdf PDF
NASK B4792 Sewer Line Area Utilities.pdf PDF
Enclosures.pdf PDF
KV Pass Application SECNAV 5512-1.pdf PDF
N6945021Q0019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Pre-Proposal Inquiries

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945021Q0019

X 9B. DATED (SEE ITEM 11)

29-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2021

CODE

NAVFAC ENGINEERING SYSTEMS COMMAND SE

PWD CORPUS CHRISTI

8851 OCEAN DRIVE, BLDG 19

CORPUS CHRISTI TX 78419-5021

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

joel.overson@navy.milEMAIL:361-961-3397TEL:

JOEL OVERSON / CONTRACTING OFFICER

N6945021Q0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PRE-PROPOSAL INQUIRIES

PRE-PROPOSAL INQUIRY

Solicitation Number: N6945021Q0019, NAS Kingsville, TX

Contractor Name: N/A

Contractor POC (Name and email): N/A

Contract or PPI#

Section of RFP Question Answer

General

Is Triple-Hat Supervision (combined Super/QC/SSHO) allowed on this project?

Or does Government require three separate individuals for these positions?

Yes, triple-hat supervision will be permitted.

2 General

Will Contractor be responsible for mowing work area (within silt fence barriers) during construction duration?

Yes.

Please confirm that Base mowing Contractor will still mow/maintain areas outside of construction zone.

That is correct, mowing contractor will still be mowing/maintaining the areas outside the construction zone.

Will engineered drawings, signed and sealed by TX PE, be required to be submitted by Contractor?

Yes.

Does Government require permits from local city/state authorities?

No, only government permits required.

6 General

Please provide available As-Built drawings of existing lift-station and existing sewer lines.

We do not have as-builts.

Please provide bottom/floor elevation of existing lift-station.

34.98 ft

From work performed on previous projects, it is understood that numerous conflicts/pipes/electrical lines exist near the existing lift station. In order for Contractors to bid apples-to-apples, should Contractors provide pricing assuming that there are no conflicts, and any conflicts encountered during construction will be handled as an "Unforseen Condition"?

Contractors are required to GPRS before they commence work.

Utility map has been provided as attachment. Major obstructions discovered beyond that shown on map or identified via GPRS would be a differing site condition.

Has Government performed SUE or GPRS of the area where the new sewer line is to

Please see attached.

N6945021Q0019 be installed? Please provide available information.

General

Does Government have an on-site soils stockpile area they would like to use for any excess soils? Please confirm is excess soils are to be hauled off Base or where they are to be placed.

Yes, please see map attached.

General

Due to the extreme pipe price fluctuations the construction market is currently experiencing, most suppliers are only guaranteeing pricing for one week. The current specifications call for Schedule 80 Pipe. This pipe is approximately 3.5 times more than SDR 26 sewer pipe that is typically used for this application. Since this line is only gravity flow and not pressure pipe, would the customer consider approving SDR 26 pipe in place of Schedule 80 pipe?

Use Schedule 40 or 80.

The following have been deleted:

PRE-PROPOSAL INQUIRIES

(End of Summary of Changes)