This amendment modifies a solicitation for a Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for the Naval Facilities Engineering Command Southeast. The amendment revises sections of the solicitation related to evaluation factors and submission requirements. The Naval Facilities Engineering Command Southeast seeks to award approximately five IDIQ contracts for general construction projects ranging from $20-100 million each. Construction types will include administrative facilities, training facilities, hangars, barracks, maintenance facilities, retail spaces, and other similar facility types. The total value of all contracts awarded is not to exceed $900 million over five years. Offerors must submit proposals electronically in PDF format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N69450-20-R-0097-AMENDMENT 0002.pdf | ||
| N69450-20-R-0097 AMENDMENT 0003.pdf | ||
| Exhibit C Past Performance Questionnaire.docx | DOCX document | |
| Exhibit I_SECNAV_5512.pdf | ||
| Exhibit C.docx | DOCX document | |
| Exhibit H_ AMAG_Form.xls | XLS spreadsheet | |
| Exhibit G - ProjNet_How _to_Guide.pdf | ||
| EXHIBIT A.docx | DOCX document | |
| Exhibit E.docx | DOCX document | |
| N6945020R0097.pdf | ||
| Exhibit B.docx | DOCX document | |
| Exhibit D.docx | DOCX document | |
| Exhibit F.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5753634
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise Section 00100 and 00150 of the solicitation. All other terms and conditions remain unchanged.
See Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945020R0097
X 9B. DATED (SEE ITEM 11)
11-Sep-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2020
CODE
NAVFAC SOUTHEAST
CORE CONSTRUCTION
BLDG 903 YORKTOWN
PO BOX 0030
JACKSONVILLE FL 32212-0030
N69450 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6945020R0097
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of this modification is to revise Section 00100 Instrutions to Offerors and Section 00150 Evaluation Factors for Award as follows:
1. Add to Section 00150 EVALUATION FACTORS FOR AWARD, III. F. Evaluation Factors for Award, 3.
(a) (1) Submission Requirements (Phase-One) the following (bolded):
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Submission Requirements (Phase-One):
(1) Solicitation Submittal Requirements:
Provide one (1) electronic copy in Adobe PDF format of the solicitation submittal identified below utilizing an Arial or Times New Roman font size twelve point (12pt) or larger.
2. Revise SECTION 00100 – INSTRUCTIONS TO OFFERORS, Phase I, Non-Price Proposal as follows:
FROM:
Section 3 – Factor 3, Safety (EXH. B - Safety Data Sheet) Section 4 – Factor 4, Past Performance (EXH. C or CPARS evaluations; Explanations, if applicable)
TO:
Section 3 – Factor 3, Past Performance (EXH. C or CPARS evaluations; Explanations, if applicable) Section 4 – Factor 4, Safety (EXH. B - Safety Data Sheet)
3. Add to Section 00150 Evaluation Factors for Award, III. F. Evaluation Factor for Award, 3.(b), (4) Factor 4, Safety, (i) Solicitation Submittal Requirements as follows:
AFTER:
“Note: The narrative shall be limited to two pages. For a partnership or joint venture, the submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Safety narratives for joint ventures may be up to four pages in length.”
ADD THE FOLLOWING STATEMENT:
A copy of the Safety Data Sheet to be used for submission of safety information is included as Exhibit B.
N6945020R0097
(End of Summary of Changes)