This modification amends an indefinite-delivery/indefinite-quantity multiple award construction contract solicitation to update the seed project details and period of performance. The solicitation seeks proposals for general construction projects at Naval Support Activity Mid-South in Tennessee under a best value source selection method. Offerors must submit technical and price proposals for a defined seed project involving chiller replacements at Building 789 with a 240-day period of performance from task order award. Awards will result in up to five firm-fixed-price multiple award contracts with a total value not to exceed $45 million over five years. Task orders will typically range from $150,000 to $6 million. Proposals are due 30 days after solicitation release.

N6945019R0507-0002.pdf

View the file

Other files

File Type Posted
N6945019R0507-0003.pdf PDF
N6945019R0507-0001.pdf PDF
N6945019R0507.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Provide corrections to the Seed Project Period of Performance and update associated clauses.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Apr-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6945019R0507

X 9B. DATED (SEE ITEM 11)

01-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2019

CODE

NAVFAC SOUTHEAST

ACQUISITION CORE

BLDG 903, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6945019R0507

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES REVISED

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of this amendment is to update the seed project period of perofmrance. See changes below:

1) Section00150. I.B.2 (pg 9 of 51) is revised as follows (changes in bold):

2. Construction projects to be performed will primarily consist of general building type projects, (new construction, renovations, alterations, demolition, roofing, repair work) including industrial, infrastructure, administrative, training, dormitory and community support facilities. Projects will include 100% full plans and specifications; and/or category III and IV work as defined by NAVFAC Engineering and Construction Bulletin 2018-04 Capital Improvements Categories of Work Classification.

Work will be for the Department of Defense activities located in the Naval Support Activity (NSA) Mid-South (Millington/Memphis Tennessee) area of responsibility managed by NAVFAC SE. Work may be required in other areas of responsibility managed by NAVFAC SE and NAVFAC Atlantic if deemed necessary and approved by the NAVFAC SE Chief of Contracting Office.

The planned seed project for this solicitation will be building 789, Chiller Equipment Upgrades, located at NSA Mid-South, TN. This work is for the replacement of 3-each 50-ton air cooled chillers including the replacement of the isolation valves, balancing valves, gauges, thermometers, sensors, and all necessary ancillary controls. The work also includes replacement of the 2-each chilled water pumps, replacement of the chilled water bypass control valve, upgrade of the Energy Management System critical control valves from pneumatic to electric valve operators and upgrade the sequence of controls for the chillers with each chiller integrated into the Energy Management System. The work will be completed in accordance with the specifications and drawings in this contract.

The magnitude of construction for this project is between $250,000 and $500,000 with a completion schedule of 240 days from task order award.

All other terms and conditions remain unchanged.

N6945019R0507

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

To be completed on individual task orders as applicable

The Contractor shall be required to (a) commence work under this contract within _____ days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ______ . The time stated for completion shall include final cleanup of the premises.

For the Seed Project

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calender days from task order award. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)