This document provides details on a forthcoming solicitation for a design-build indefinite delivery/indefinite quantity multiple award construction contract for the Naval Facilities Engineering Command Southeast area of responsibility. The solicitation will result in the award of approximately five indefinite delivery/indefinite quantity multiple award construction contracts for general construction projects such as administrative facilities, training facilities, hangars, barracks, dormitories, maintenance facilities, and commissaries/retail facilities. The total maximum value of all contracts awarded is $240 million over the five-year base period and four option years. Individual task orders will typically range from $20-50 million. Offerors will submit phase one and two proposals for evaluation, with the offeror presenting the best value proposal for an initial seed project task order being awarded the first contract. The remaining four offerors selected will receive contracts with a $1,000 minimum guarantee over five years. The solicitation is expected to be released on FedBizOpps approximately 15 days after this pre-solicitation notice posting date. Phase one proposals will be due no less than 30 days after solicitation release.

N6945018R0700-0001.pdf

View the file

Other files

File Type Posted
N6945018R0700-0002.pdf PDF
RFP_N6945018R0700.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to include update the Design Experience relevant dollar value, update Non-Cost/Price proposal submission instructions, provide an updated Exhibit A-Construction and Design Project Data Sheet and provide an updated PPI log.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N69450-18-R-0700

X 9B. DATED (SEE ITEM 11)

27-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Mar-2018

CODE

NAVFAC SOUTHEAST

IPT SOUTH ATLANTIC

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

N69450 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N69450-18-R-0700

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The following revisions have been made to the solicitation:

(1) Section 00150.F.3.b.2.i.2. FACTOR 2 EXPERIENCE DESIGN EXPERIENCE is changed as follows (changes in bold):

Add (in bold):

(2) Design Experience

Submit a minimum of three (3) and maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as new construction or major renovation of a variety of projects including, but not limited to: Administrative Facilities, Training Facilities, Hangars, BEQs, Dormitories, Maintenance Facilities, Commissaries/Retail and other similar types of facilities. A major renovation is further defined as a project which includes complete replacement/repair of mechanical, electrical and fire protection systems and complete replacement of interior finishes. At least one (1) relevant new construction and one (1) relevant major renovation project is required. Experience in multiple project types may be considered a benefit to the government and may be considered more favorably.

Projects submitted for the Offeror shall be completed within the past seven (7) years of the date of issuance of this RFP with a value of $20 Million or greater.

Projects submitted shall be completed within the past seven (7) years of the date of issuance of this RFP.

For design-build projects, the design portion of the contract shall have been completed within the past seven (7) years of the date of issuance of this RFP.

A project is defined as a complete design effort performed under a single task order or contract/subcontract.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Exhibit A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.

Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).

In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five

(5) projects combined.

(2) Section 00150.F.3.b. NON-COST/PRICE FACTORS (PHASE-ONE) is changed as follows (changes in bold):

Remove:

Provide one (1) original, four (4) copies, and one (1) electronic copy (CD format) of the solicitation submittal requirements for Factors 1 through 4 identified below. In case of variation, original paper submittal takes precedence over electronic or paper copies. Entire Phase-One proposal shall not exceed 50 pages in length (single sided only) or 25 pages (double-sided) utilizing an Arial or Times New Roman font size twelve point (12pt) or larger for Factors 1, 2, 3, and 4. Title page, table of contents, dividers, and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered. Any pages beyond the first 50 pages submitted will not be evaluated. Documentation for Joint Venture (JV) Agreements, partnerships, subcontractors or teaming arrangements does not count towards the page count. Offerors are encouraged to simply staple or bind and three hole-punch proposal, and enclose in an envelope. Three ring binders or presentation folders are unnecessary.

Add:

Provide one (1) original, four (4) copies, and one (1) electronic copy (CD format) of the solicitation submittal requirements for Factors 1 through 4 identified below. In case of variation, original paper submittal takes precedence over electronic or paper copies. Entire Phase-One proposal shall not exceed 50 pages in length (single sided only) or 25 pages (double-sided) utilizing an Arial or Times New Roman font size ten point (10) or larger for Factors 1, 2, 3, and 4. Title page, table of contents, dividers, and any pages specifically excluded under each factor do not count towards the total page count and should not be numbered. Any pages beyond the first 50 pages submitted will not be evaluated. Documentation for Joint Venture (JV) Agreements, partnerships, subcontractors or teaming arrangements does not count towards the page count. Offerors are encouraged to simply staple or bind and three hole-punch proposal, and enclose in an envelope. Three ring binders or presentation folders are unnecessary.

(3) Updated Exhibit A-Construction and Design Project Data Sheet has been provided as an attachment.

(4) An updated PPI log has been provided as an attachment.

All other terms and conditions remain unchanged.

SECTION 00010 - SOLICITATION CONTRACT FORM

The Issued By organization has changed from

NAVFAC SOUTHEAST

IPT SOUTH ATLANTIC

BLDG 135, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

to

NAVFAC SOUTHEAST

ACQUISITION CORE

BLDG 903, PO BOX 30

NAS JACKSONVILLE

JACKSONVILLE FL 32212-0030

(End of Summary of Changes)