REQUEST FOR INFORMATION RESPONSES
for PROJECT: FIRE PROTECTION SYSTEM REPAIRS at BUILDING 760 3741 3757 4744 and 4745
PUBLIC WORKS DEPARTMENT, NAS-KINGSVILLE
B760
1. What is the address for monitor module.
Response: Drawings are not available for the address. However, at AFFF station #3, the module requiring replacement can be identified by the rain-water stained paper label.
2. What is the address for relay module.
Response: Drawings are not available for the address. However, at AFFF station #3, the module requiring replacement can be identified by the rain-water stained paper label.
3. What are base bid on troubles.
Response: The base bid is the SOW. There are no options.
4. Why are the valves closed in the entire hangar.
Response: The valves are closed to address the AFFF system’s inadvertent activation. NOTE: The valves shall be returned to their normal position as part of the Fire Protection System Repairs project.
5. Additional requirements #3 pages 3 of 14 does not specify buildings.
Response: Item #3 states that “27 signs total, confirm quantity” are required:
| 12 signs, at B3741 |
| 08 signs, at B3757 |
| 06 signs, at B760 |
| 26 signs, confirm quantity |
6. Are foam system signs to be removed.
Response: Yes. Item #2 states that “21 signs total, confirm quantity” shall be removed:
| 12 signs, at B3741 |
| 08 signs, at B3757 |
| 20 signs total, confirm quantity |
7. Are abort systems release & abort to be remounted Response: Please provide more clarification/information on your question.
B3741
1. Can the water resistance abort signs be in plastic material.
Response: All signs shall be constructed of a water and weather resistant material and fastened at their locations with non-corroding metal fasteners and non-corroding materials.
2. Please confirm drawings for building 3741 indicates the battery size at 55A batteries are acceptable.
Response: Contractor is obligated to ”confirm the replacement batteries required quantities, type, size and capacity.”
3. Can you confirm the quantity of batteries for CP-35. I am showing up with 12 batteries at 60A Response: Contractor is obligated to ”confirm the replacement batteries required quantities, type, size and capacity.”
4. The cabinets were locked and there was not troubles showing up.
Response: The trouble codes are annotated under bullet 4, for b 3741.