NAS WHITING FIELD

MILTON, FL

WO# – C7RY9X

SOUTH FIELD SIDEWALK IMPROVEMENTS

USS Ranger St and USS Long Island Street

STATEMENT OF WORK

SPECIFIC ENGINEERING

AND TECHNICAL CRITERIA

Public Works Department Facilities Management Division

Requirements Branch

William Hilliard Contract Specialist

(850) 623-7435

30 September 2020

South Field Sidewalk Improvements Project WO# - C7RY9X

NAS Whiting Field, Milton, FL

01010 - 2

1 SPECIFIC REQUIREMENTS

1.1 Project. The work described herein shall include all labor, materials, equipment, supervision and any other work necessary to construct the South Field Sidewalk Project complete and ready for use. The work shall be accomplished using commercial grade products and materials and installed in accordance with all applicable Federal, State and local codes and ordinances.

1.2 Work Order WO# C7RY9X, South Field Sidewalk Improvements Project, USS

Ranger St and USS Long Island St, Naval Air Station (NAS) Whiting Field, Milton, Florida.

1.3 Work Required. Construct South Field Sidewalk along USS Ranger St. and along

USS Long Island St. as described herein.

The primary purpose of this project is to enhance the pedestrian pathways around the new Simulator Building (B.3200). The new building will raise pedestrian draw to the area, which is currently underserviced since the construction of the coffee shop. The intent is to enhance the campus feel on this portion of the base.

The work shall include construction of new sidewalks, new pedestrian marked crossings and pedestrian crossing signs. The new pedestrian crossing signs shall be complete with solar powered flashing lights.

The new concrete sidewalk shall begin at the corner of USS Langley St.

and USS Ranger St. The new sidewalk shall run south along Ranger St.

on the east side of the street. The sidewalk shall terminate north of Building 2994 and tie into the existing sidewalk. See Attachment 4.1 for the sidewalk location.

A new concrete sidewalk shall be constructed along USS Long Island St.

along the south side of the street. The new sidewalk shall tie into the new sidewalk along Ranger St. See Attachment 4.1 for the sidewalk location and the extents of construction.

CONSTRUCTION:

A. The contractor shall construct a 4 inch thick concrete sidewalk.

The minimum width of the sidewalks shall be 6 feet. Use 4000 psi concrete mix with 6”x6” supported welded wire fabric. See Attachment 4.2, Detail A1 for a typical cross section of the sidewalk.

01010 - 3

B. Strip and remove the existing topsoil. Undercut the sidewalk area 6 inches below the bottom of the sidewalk. The area to be excavated is defined as the area directly under the sidewalk and 1 foot beyond on each side of the sidewalk when right-of-way allows.

C. The contractor shall dispose of the excavated and unused soil off site

D. Compact the existing subgrade below the bottom of the sidewalk.

E. New clean sand, free of organics, shall be placed beneath the concrete sidewalks. Satisfactory soils shall include SP or SW. Soil shall be placed in layers and compacted to 95% of the Modified Proctor Maximum Density.

F. New sod shall be placed along all sides of the sidewalk. The species of sod shall match the existing sod adjacent to the new sidewalk. The contractor shall warranty a one-year establishment period, during which period all landscape work must meet 95% survival rate.

G. The contractor shall be responsible for watering the sod sufficient to achieve survival. Run-off, pudding, and wilting shall be prevented.

Watering of other adjacent areas or plant material shall be prevented. The source of water shall be approved by the Contracting Officer and of suitable quality for irrigation containing no element toxic to plant life.

H. Expansion joints shall be installed at regularly spaced intervals transversely across the sidewalk slab. The spacing of the expansion joints shall be 30 feet on center. Provide expansion joints at changes in direction and where sidewalk abuts curb, steps, or is adjacent to rigid pavement or other structures. Use 1/2 inch thick expansion joint material consisting of bituminous filler conforming to ASTM D1751, Type I. Wood filler not approved.

I. Intermediate contraction joints shall be spaced at 5 feet on center.

Contraction joints shall be a minimum of 1/8 inch wide and 1 inch deep or 1/4 of the slab depth. Contraction joints shall be placed using a concrete jointer. See Attachment 4.2, Details C1 and B1 for typical concrete joint spacing and details.

J. The concrete sidewalks shall receive a light broomed finish.

01010 - 4

K. The longitudinal path of the sidewalk shall follow the grade of the adjacent street. In the transverse direction the sidewalks shall have a maximum cross slope of 2%. The sidewalk shall pitch toward the street.

L. The contractor shall interrupt the existing concrete curb and gutter where the new sidewalk intersects (crosses) the street or driveway.

The contractor shall construct a new curb and gutter to tie into the new sidewalk. The sidewalk shall have a smooth transition at the tie-in with no lip.

M. Where the sidewalk crosses the adjacent street and interrupts the concrete curb the sidewalk shall slope to match ADA Standard for Accessible Design for a ramp. The slope shall not exceed 1:12.

See Attachment 4.3 for typical ramp details.

N. The contractor shall install Detectable Warning Mats in accordance with Americans with Disabilities Act (ADA) Standards for Transportation Facilities, Section 705. The Detectable Warning Mats shall be installed where the new sidewalk approaches an intersection or driveway. See Attachment 4.1 for the location of Detectable Warning Mats.

O. The color for the mats shall be “Safety Yellow”.

P. The Detectable Warning Mats shall be surface applied with mechanical fasteners in accordance with the manufacturer’s printed instructions.

Q. Where the new sidewalk intersects a street with no curb, the contractor shall inset the sidewalk 12 inches into the street. See Detail A3 on Attachment 4.2.

R. The contractor shall construct the first 30 feet of sidewalk as “mock construction” including expansions and contraction joints for review and acceptance by the Contracting Officer or the FEAD (POC).

The construction must be a representative of the finish specified and the workmanship required.

S. The contractor shall be responsible for properly curing and protecting the freshly placed concrete. The contractor shall submit their proposed method for curing the concrete to the Contracting Officer for review.

01010 - 5

T. Rinsing of the transit concrete mix truck must be contained in an approved area by the Contracting Officer or FEAD (POC). Runoff must be prevented until the concrete dries and the solid debris must be removed by the contractor.

U. The contractor shall be responsible for stormwater management during construction. Any runoff shall directed to existing stormwater management systems or stormwater inlets. All stormwater inlets adjacent to construction areas shall be protected by a sediment barrier. The contractor shall submit a stormwater management plan to the Contracting Officer or FEAD (POC) for review.

Crossing Markings

A. The contractor shall install new pedestrian marked crossing. New pedestrian crosswalks shall be located as shown on Attachment 4.1.

B. The crosswalks shall be marked in accordance with Attachment

4.2, Detail B4.

C. The white lines including crosswalk boundary lines and infill diagonal lines shall be thermoplastic or epoxy paint. The minimum coating thickness shall be 20 mils. The contractor shall submit thermoplastic or epoxy paint product data sheets or SDS to FEAD for review and product approval.

Demolition

A. The contractor shall demo the existing concrete curb and gutter where the new sidewalk intersects a street or driveway. Remove the curb and gutter to at least 1 foot beyond the extents of the new sidewalk. The contractor shall be responsible for hauling and disposal of associated debris.

B. The contractor shall demo a portion of the existing sidewalk, curb and gutter where the new pedestrian marked crossing intersects an existing sidewalk and curb. The contractor shall demo approximately 20 feet of the existing sidewalk and curb. The contractor shall be responsible for hauling and disposal of all associated debris.

01010 - 6

Pedestrian Crosswalk Signage A. The contactor shall install new solar powered flashing pedestrian crosswalk signs at the new crosswalk locations. The crosswalk signs shall be similar to the existing signs on base. See the photo below, Figure 1.

Figure 1. Typical Pedestrian Crossing Solar Powered Flashing Sign

B. The pedestrian crossing signs shall be installed in accordance with

Detail B5 on Attachment 4.2.

Traffic Maintenance Plan

A. The contractor shall be responsible for all disruptions to traffic during the construction of South Field Sidewalk Improvement Project. The contractor shall submit a Traffic Maintenance Plan to the Base Contracting Officer and FEAD (POC) for approval prior to commencement of work.

01010 - 7

Potential Obstructions and/or Conflicts A. The new sidewalk shall be located approximate 6 to 8 feet off of the back of the curb of the adjacent street. The following objects shall be avoided when constructing the new sidewalk;

a. Fire Hydrants

b. Utility Poles

c. Free Standing Signs

The sidewalk path shall be redirected to avoid any object stated above by a minimum of 2 feet, see Attachment 4.2, Detail A4.

B. The sidewalk can incase the following objects;

a. Top of Stormwater Inlets

b. Valve Boxes

c. Pull Boxes

d. Utilities

The sidewalk shall be separated from the objects stated above by 1/2 inch expansion joint material. Where appropriate, the object encased by the concrete shall be extended to be flush with the surface of the sidewalk.

Tree Removal, Planting and Maintenance A. Tree Removal.

a. The contractor shall remove six (6) trees as shown on Attachment 4.4, Tree Removal Plan.

b. The contractor shall remove the trees to a depth of 6 inches below grade. The contractor shall apply a herbicide to the top of the remaining tree trunk.

c. Ensure nearby roadways are free of debris at all times.

d. Observe all power (utility) lines.

e. All material removed from NAS Whiting Field shall be properly disposed of in accordance with local, state and federal regulations.

B. Tree Planting.

a. The contractor shall plant new trees in accordance with

Attachment 4.5, Tree Planting Plan. General locations are identified in Attachment 4.5. Exact location will be provided by the Contracting Officer.

b. Trees planted shall require a one-year guarantee period. If a tree dies during this period for other than human cause, the Contractor is responsible for its replacement and care.

Contractor is not held responsible for damage from acts of God. Acts of God are defined as animal, pests, insect infestations, or abnormal weather conditions.

01010 - 8

c. Tress shall be exemplary of their species and type. They shall be free from defects, injuries and diseases.

d. Trees shall be mulched to a depth of two to three inches and to a diameter of three times the root ball. Ensure the mulch does not touch the trunk of the tree.

e. Plant trees in accordance with ANSI A300 Part 6 and ISA Standard Practices to diminish the probability of tree transplant shock loss.

f. Prune broken branches immediately caused by tree planting.

g. Stake each tree planted as depicted in Detail A4 of

Attachment 4.4.

h. Provide a contractor work plan prior to notice to proceed detailing methods for tree planting, equipment to be used, traffic plan for any anticipated road closures, and safety plan with activity hazard analysis.

C. Tree Maintenance

a. Implement a tree watering plan using a tree watering bag system; each bag shall be refilled at least once per week. If a tree watering bag system cannot be utilized, manual watering shall take place weekly. Each tree shall receive at least 2 gallons of water per inch of caliper (trunk diameter) per week.

b. Stakes shall be removed following final inspection at the end of the one year guarantee period, unless otherwise directed by the contracting Officer.

1.4 The work described herein shall include all labor, materials, equipment, supervision and any other work necessary to provide the Project complete and ready for use. The work shall be accomplished using commercial grade products and materials and installed in accordance with all applicable Federal, State and local codes and ordinances including the latest editions of the International Building Code (IBC), Uniform Facilities Criteria (UFC), Florida Building Code (FBC), National Fire Protection Association (NFPA) and the Florida Department of Transportation (FDOT).

1.5 Coordination All work under this Contract shall be coordinated with Facilities Engineering & Acquisition Division (FEAD) Point of Contact (POC).

1.6 Site Visit The Contractor shall coordinate a Site Visit with the FEAD POC. The Site Visit will take place prior to submitting a proposal for the work. It is the responsibility of the Contractor to verify existing conditions, field verify measurements and become familiar with the amount and character of work that is required to be performed. Any concerns or questions shall be made in writing and directed to the Contracting Officer.

01010 - 9

1.7 Normal Working Hours Normal working hours at NAS Whiting Field are 0630- 1700, Monday through Friday, except Federal Holidays and when coordination and alternate scheduling is required for Air Operations or other base activities.

The Contractor shall schedule the work so as to cause the minimum interruption to normal operations of the base tenants. If the Contractor desires to work on Saturday, Sunday, holidays, or outside of the Station’s regular hours, an application must be submitted to the Contracting Officer for approval.

1.8 Protection of Existing Features The Contractor shall provide adequate protection of existing features from damage. Work damaged by the Contractor shall be repaired to original condition at no additional cost to the Government.

1.9 Period of Performance The Contractor shall complete the work within 180 days after award of contract.

1.10 Final Acceptance Final acceptance of the new work will not be given until the contractor has successfully completed all tests and after correction to all defects in installation material or operation have been made according to contract documents.

1.11 Warranty All workmanship and materials and/or equipment shall be warranted for a period of not less than one year under normal wear and tear or the normal standard warranty should it extend beyond one year.

END OF SECTION

01010 - 10

2 GENERAL REQUIREMENTS

2.1 Identification Passes Application for and use of badges will be as directed.

Obtain access to the installation by participating in the Defense Biometric Identification System (DBIDS), or by obtaining passes from the Base Pass and Identification Office.

30-day passes and DBIDS passes are both issued without charge. Immediately report instances of lost or stolen badges to the Contracting Officer.

a. DBIDS: DBIDS is a program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less. The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Under the DBIDS program, no commercial vehicle inspection is required, although vehicles may be subject to random inspection. There is no cost to obtain DBIDS credentials.

b. Base Passes: Participation in the DBIDS is not mandatory. However, if the Contractor chooses to not participate, the Contractor's personnel will have to obtain a 30-day pass, be subject to daily mandatory vehicle inspection, and may have limited access to the installation.

c. ALL occupants of a vehicle must have either a base pass or a DBIDS pass.

The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

2.2 Safety and Environmental Plans The Contractor shall comply with Federal, State, local and base regulations pertaining to the environment, including but not limited to, water, air, solid waste, and noise pollution. Contractor shall comply with the current version of the US Army Corps of Engineers Safety and Health Requirements Manual

EM385-1-1.

2.3 OSHA Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the Contractor. Further, the Government will assume no liability or responsibility for the Contractor’s compliance or noncompliance with such requirements, with the exception of the aforementioned responsibility to make corrections according to approved plans of abatement subject to base-wide priorities.

2.4 Asbestos and Lead There is NO known asbestos containing material (ACM) on project site and no lead based paint on this project. If materials are encountered which may contain ACM and/or lead, DO NOT TOUCH THE MATERIAL. IMMEDIATELY NOTIFY THE CONTRACTING OFFICER IN WRITING. Within a reasonable time, the Government will perform tests to determine if asbestos or lead is present. If the materials

01010 - 11 are determined not to contain ACM or lead, the Contractor shall proceed without change.

If it is determined that ACM and/lead are present and must be disturbed, the Contracting Officer may direct a change accordingly.

2.5 Hazardous Waste All Hazardous waste shall be collected, manifested, and disposed of in accordance with the requirements of the Public Works Environmental Department. Coordinate with the Public Works Environmental Director (850-623-7017) for proper disposal of hazardous waste.

2.6 Sanitation and Cleanliness The Contractor shall maintain all of its assigned work areas in a neat, clean, orderly, and sanitary condition. The premises shall be kept free at all times from the accumulation of waste material and/or rubbish resulting from the work.

The work areas will be subject to fire safety and health inspections by Government personnel. The Contractor shall be responsible for correcting any violation cited.

Combustibles shall be removed daily, and upon completion of the work, all debris, tools, and other surplus materials shall be removed and the premises left in approved condition.

2.7 Storm Protection When warnings of gale force winds or stronger are issued, the Contractor shall take every practical precaution to minimize danger to persons, the work and adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolds and other temporary work.

2.8 Removal of Materials All materials deemed hazardous by OSHA that are encountered during Contractor modifications shall be identified and referred to the FEAD POC. All other materials removed during Contractor modifications shall be removed from the work area daily by the Contractor and disposed of in accordance with Federal, state, and local regulations. All costs and liability associated with the disposal of materials shall be borne by the Contractor. The recycling of construction and demolition debris is encouraged when feasible.

2.9 Solid Waste Tracking All contractors shall provide tracking for all solid waste and/or recycling material generated on base. The Contractor shall submit tracking documentation prior to project completion. A sample form is attached below that will meet all documentation requirements of the Contractor. The documentation shall be submitted to the Public Works Department (PWD) Environmental Division.

2.10 Permits and Outages Any man-made cut, cavity, trench or depression in the earth’s surface formed by earth removal requires an excavation permit. In addition, the Contractor shall provide a third party utility location. Any utility or HVAC outage affecting inhabited work space, inhabited living space, or exit from an inhabited work space/living space requires an Outage Permit. Any “Hot Work” (welding, cutting, soldering/brazing, blow torches, etc.) requires a “Hot Work” permit issued to the Contractor by the Fire Prevention office (850-623-7856). Permission to interrupt any utility, communication, operational or traffic service or pattern shall be requested in writing at least 10 working

01010 - 12 days prior to the date of the desired interruption. The Contractor shall receive approval in writing from the Contracting Officer and/or FEAD POC before requested interruption may be implemented.

2.11 Energy Conservation The Contractor shall use energy efficient products to the maximum extent feasible. Provide documentation that identifies any mechanical, electrical and other energy impacting products incorporated into the work. The documentation of products shall include type of product/equipment, size/capacity, cost of the product/equipment and other information that would help identify/quantify energy savings/efficiency.

2.12 Utility Location and Damage Avoidance For all excavation and subsurface work, the contractor shall physically verify underground utility locations, including utility depth, by hand digging using wood or fiberglass handled tools when any adjacent construction work is expected to come within 3 feet of the underground system.

Contractor shall perform a Utility Quality Level A survey prior to any excavations as defined in ASCE 38-02.

Contractors are reminded that Utility Quality Level A surveys involves precise horizontal and vertical locations of utilities at a level of accuracy (15mm) that can normally only be achieved through the use of test holes. Sunshine 811 or equivalent utility coordinator services alone do not meet the Utility Quality Level A requirement.

In addition to the Utility Quality Level A survey, contractor shall enlist a third party, independent, private utility locating company to confirm the non-existence of subsurface utilities in all excavation areas.

Whenever contract work involves chipping, saw cutting, or core drilling through concrete, bituminous asphalt or other impervious surfaces, the existing utility location must be coordinated with station utility departments in addition to location and depth verification by a third party, independent, private locating company. The third party, independent, private locating company must locate utility depth by use of Ground Penetrating Radar (GPR), X-ray, bore scope, or ultrasound prior to the start of demolition and construction. Outages to isolate utility systems must be used in circumstances where utilities are unable to be positively identified. The use of historical drawings does not alleviate the Contractor from meeting this requirement.

Contractor shall maintain survey-verified markings throughout the duration of the project. RETURN AREAS DAMAGED AS A RESULT OF CONSTRUCTION UNDER

THIS CONTRACT TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST TO

THE GOVERNMENT.

01010 - 13

NAS WHITING FIELD WASTE TRACKING FORM

Total Project Waste Landfilled/Combusted (Excluding Salvageable or Recycled Materials)

Date Type of Material Quantity (TONS) Landfill Location Transporter Tipping Fee ($/Ton) Total Cost Comments

Alternatives to Landfill (Materials Salvaged for Sale, Re-Use, or Recycled)

Date Type of Material Quantity (TONS) Transporter/Destination Handling Fee ($) Revenue ($) Net Profit ($) Comments

01010 - 14

3 SUBMITTAL REQUIREMENTS

3.1 Manufacturer’s Product Data The Contractor shall submit manufacturer’s catalog data, specifications, installation instructions, etc. for all materials, equipment, etc. to be incorporated into the work.

3.2 Safety Data Sheets The Contractor shall provide Safety Data Sheets (SDS’s) for all materials brought onboard the base that require SDS’s.

3.3 As-Built Drawings The Contractor shall submit drawings showing the final as-built conditions of the project. Provide a CADD file and two hard copies.

3.4 O&M Manuals The Contractor shall provide all data that is furnished by the manufacturer, or the system provider including manufacturer's help and product line documentation necessary to install and maintain the equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the provided.

01010 - 15

4 ATTACHMENTS

4.1 Site Plan – Sidewalk Improvements

4.2 South Field Sidewalk Improvements – Details

4.3 Typical Ramp Details

4.4 Tree Removal Plan

4.5 Tree Planting Plan