N6883619Q0348_N6597120RCGP001,TM,_V1_EQUIPMENT_MAINTENANCE_AND_REPAIR_Review_Checklist_-_Under_the_SAT.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
VISUAL INFORMATION EQUIPMENT MAINTENANCE/REPAIR AND INSTALLATION
Solicitation number
N6883619Q0348
Issued by

About this file

N6883619Q0348_N6597120RCGP001,TM,_V1_EQUIPMENT_MAINTENANCE_AND_REPAIR_Review_Checklist_-_Under_the_SAT.xlsx

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

FLCJ - CONTRACT QUALITY REVIEW CHECKLIST - UNDER THE SAT (VERSION I) As of 20 August 2019
CONTRACT CATEGORYCONTRACT NUMBER
CommercialConstructionServicesSupplyFSSAuto-ManualREVIEWER: Sheila SmigelskiDATE: 13 September 2019
CONTRACTING OFFICER: Learie HolderPURCHASING AGENT / CONTRACT SPECIALIST: Timothy Merkerson
ORDERING OFFICER:CONTRACT TYPE: FFP/ SAP Services
CONTRACTOR:COMPETED / SOLE SOURCE / MICRO: Small Business set Aside.
IGE:TEAM/CODE: 230/234
PSC/FSC: J075
TOTAL DOLLAR VALUE OF AWARDNAICS: 811213
Item #QuestionReferencesCompliant (Y/N/NA)Reviewer's Comments (Mandatory for No Responses)
1RECORDS MANAGEMENT
1Is the contract file entered into the mandated electronic records system file format.NAVSUP Mandated PolicyNOFile in U drive is not in accordance NAVSUP Mandated Policy E filing, Numbered incorrectly.
2FUNDING
2Does the contract file certification of funds availability/commitment (certified, proper amount, proper appropriation, at the proper time)?
FAR 4.803(a)(3) FAR 32.702 FAR 43.105YES
3MARKET RESEARCH
3Was adequate market research documented throughout the procurement?
FAR 10 Market Research FAR 12.202 Market Research Agency Needs DFARS 210NOMISSING MARKET RESEARCH: No evidence of market research was conducted and technical screening of mandatory and preferred sources. Sources sought document in file however no evidence of sources sought was posted in NECO. EMAIL FROM Neco in file. The actual NECO PAGE IS REQUIRED SHOWING ALL ATTACHMENTS.
4DETERMINATION AND FINDING (D&F)
4.1If solicited from only a single source, did the KO make the determination required in FAR 13.106(b)?FAR 13.106(b)N/A
4.2If options are included, was a justification to include them made by the KO?FAR 17.205(a)N/AIt seems that this requirement is recurring, recommend to include option year.
4.3If the action is a services requirement, has the KO executed a Determination of Non-Personal Services and a Certification or Non-Personal Services?FAR 37.103 DFARS 237.503 DFARS PGI 237.503NO
4.4If the Item(s) acquired were non-domestic end product(s) which were not exempt per FAR 25.103 or DFARS 225.103, does the file contain a D&F approved at the proper level?
NOTE: Answer this question "N/A" if the award was to a qualifying country, or was procured using full and open competition, was synopsized and no domestic offer was received.FAR 25.103 DFARS 225.103N/A
5LIMITING COMPETITION
5.1Other than Full and Open. Competition (Sole Source, Brand Name, Limited Source). Appropriate Justification in file? Brand name J &A must be issued with solicitation.
FAR 13.106(b) FAR 13.501(a) FAR 8.405-6(2)N/A
5.2If the action is an order under the General Services Administration's (GSA) e-Buy and contains Brand Name specifications, did the KO post the justification or documentation with the RFQ?FAR 8.405-6N/A
6SMALL BUSINESS
6.1Was the appropriate North America Industry Classification (NAICS) code selected for the procurement?FAR 19.303 DFARS 219.303YESThe draft solicitation NAICS in file doesn't matches the 2579.
6.2If applicble, was a DD Form 2579, Small Business Coordination Record, completed (meaning it was properly coordinated and required signatures were obtained) for all actions (including Federal Supple Schedules (FSS))? If KO did not set it aside for small business, did the KO document the DD Form 2579 with the rationale? If the action includes a withdrawal or modification of the initial set-aside determination, is the contract file documented with an explanation?DFARS 219.201©(10) FAR 19.502-2 FAR 19.506(c)YES
6.3SBA 8(a) Offering Letter and Acceptance / Rejection if applicableFAR 19.804N/A
6.4Buy American Act Exception - Appropriate determination is in the file (FAR 2501, DFARS 225.103)FAR 25.103 DFARS 225.103N/A
6.5Wage Determination / CBA (FAR 22.10 - Service Contract Labor Standards, formerly known as Service Contract Act), when applicableFAR 22.10NOno evidence of exemption in file.
7Documentation
7.1Evidence of supporting documentation for Market ReaserchFAR Part 10NOMISSING MARKET RESEARCH: No evidence of market research was conducted and technical screening of mandatory and preferred sources. Sources sought document in file however no evidence of sources sought was posted in NECO. EMAIL FROM Neco in file. The actual NECO PAGE IS REQUIRED SHOWING ALL ATTACHMENTS.
7.2Documentation supporting screening efforts to determine if requirement is available from mandatory Government sources of supplyNONONE IN FILE
7.3Award Documentation Record properly documented (up to the solicitation stage)NONONE IN FILE
7.4Information Technology Procurement Review and applicable waiver documentation (for IT supplies, services and software licenses)CNO GuidanceN/A
7.5Does the PWS exclude Inherently Government Functions (IGF)? Certification of Nonpersonal Services completed and signed by requiring activity in file?
NOTE: Performance of Inherently Government Functions by contractors is prohibited.FAR 7.503 DFARS 207.503 DFARS PGI 207.503 DFARS PGI 237.503NONONE IN FILE
7.6If a specific statutory authority is cited for a personal service contract, has a legal review obtained?FAR 37.104 DFARS 237.104N/A
7.7Inclusion of Options Documented. Did the KO execute a proper D&F stating that exercising the option was in the best interest of the Government?
(Note: A proper D&F is one that address all factors required by regulation and policy)FAR 17.207© DFARS 217.207©N/A
8REQUEST FOR QUOTATION (RFQ)
8.1If the proposed action exceeds $25K, was a proper synopsis posted on FEDBIZOPPS?
Exception documented in record.FAR 5.207 FAR 5.301(b)NONONE IN FILE
8.2Use of proper Provisions and Clauses included in the RFQ. (for commercial actions were applicable FAR and DFAR Clauses checked on 52.212-5 for commercial actions)?DFARS PGI 222.1703YESRecommend to remove 52.211-6 Brand Name or Equal. Also, Since this FY20 funding. CRA should be included.
8.3If the action was a service, was a Performance Work Statement (PWS) prepared as "performance-based" that describes the work in terms of required results rather than how the work is to be accomplished or the number of hours to be provided?FAR 37.602(b)YES
8.4PWS - Statement of Requirement - SOW. Does the PWS contain the prescribed language?FAR 37.103YES
8.5RFQ and all Amendments are in file, including attachments.Draft solicitation in file however, I recommend to check the unit of Issue instead EA.
8.6Valid proposals included in contract file. Documentation of late proposals received.
9EVALUATION AND AWARD
9.1Business decision documented and does the file contain a completed Award Documented Record signed by the Contracting Officer?FAR 13.106-3 FAR13.501
9.2Past performance validatedPPIRS
9.3Is there a KO determination of responsibility in the file?
9.4If a small business was determined to be non-responsible, was a Certificate of Competency (COC) obtained?
FAR 19.601©
9.5Oral Quotations, properly documented
9.6SAM validated to include SAM exclusions, after receipt of proposals and prior to award.FAR 4.11 FAR 9.405(d)
9.7Final CAR is in the file and was completed within three (3) business days of the contract action.
FAR 4.604 DFARS 204.7006
10CONTRACT DOCUMENT
10.1Bilateral award in file signed by the contractorFLCJ Policy
10.2CLINS have proper quantities and units of measure
10.3ECMRA language in PWS for servicesNMCARS 5237.102-90
10.4Period of Performance / Delivery Dates specified (if services corss fiscal years, conforms to limitation set forth in FARFAR 12.301 DFARS 204.7006
11MODIFICATIONS
11.1Is the modification supported with sufficient documentation justifying the action (e.g. rationale, Government estimates/estimated cost of change, contractor's proposal, etc.)?FAR 4.803(a)(26)(iii)
11.2Was the modification properly issued (i.e. unilateral vs bilateral) and did it cited the correct authority in Block #13 of the SF 30 (e.g., Changes Clause, etc.)?FAR 43.103
11.3If the action is bilateral modification (i.e. supplemental agreement), is it signed by both the KO and the contractor?FAR 43.103(a)
11.4Completed MOD Checklist in file?FLCJ Policy
11.5Memorandum for Record in file that documents a clear purpose of the mod, scope, price and establishes price reasonablness.
11.6Final CAR is in the file and completed timely with modification. CAR is coded correctlyFAR 4.604 DFARS 204.7006
12CLOSEOUT
12.1Documentation D1594
12.2Evidence of funds deobligated?
12.3Evidence all contractual claims/obligations/issues resolved prior to closeout
Date/Time Review Started: _9/13/2019- 8:30_________________________
Date/Time Review Completed :___9/13/2019 9:48____________________