Price Summary

Burns and Roe Services Corportion
Port Operation Services
Contract Number: N00033-08-C-1016
WORK PACKAGE
YFB 92 Overhaul

PRICING SUMMARY

MAJOR COST ELEMENTCost
BURDENED LABORERROR:#REF!

Burns & Roe Direct Labor Costs ERROR:#REF!

Estimated Material CostsERROR:#REF!
Estimated Shipping Costs @ 21%ERROR:#REF!
Total Estimated Material & Shipping CostsERROR:#REF!

Total Labor, Labor Burden, Material, & Shipping ERROR:#REF!

**Date: March 10, 2014

YFB 92 SOW

TECHNICAL EXHIBIT 13
Drydocking Availability for YFB-92 (FY20)
Scope of Work (SOW), For On Island Work Effort
NumberDescription
a) Location of Work:
1) Wharf "W" GTMO
b) Identification:
1) YFB-92
c) Reference:
1) NAVSEA DWG 6917426, YFB Docking Plan
2) Naval Ships Technical Manual Chapter 997, Docking Instructions and Routine Work in Dry-dock
3) NAVSEA DWG 163-6917427, YFB Sea Chest Details
4) NAVSEA DWG 529-6917394, YFB Bilge System Schematic Diagram
5) Naval Ships Technical Manual Chapter 631, Painting and Preservation
6) NAVSEA DWG 100-6917349, YFB Structural Plan and Profile
7) NAVSEA DWG 801-6917417, YFB General Arrangement and Profile
8) Naval Ships Technical Manual Chapter 074, Welding and Allied Processes
9) NAVSEA DWG 6917351, YFB Shell Expansion and Long Plan
10) NAVSEA DWG 6917355, YFB Structural Section Plan
11) NAVSEA DWG 6397358, YFB Structure Deckhouse
12) NAVSEA DWG 6917349, YFB Structural Plan and Profile
13) NAVSEA DWG 6917357, YFB Structure Main Deck
14) NAVSEA DWG 6917356, YFB Transverse Details
15) NAVSEA DWG 6917352, YFB Tunnel Construction
16) Naval Ships Technical Manual Chapter 245, Propellers
17) NAVSEA DWG 243-6917365, YFB Shafting
18) Naval Ships Technical Manual Chapter 505, Piping Systems
19) Naval Ships Technical Manual Chapter 078, Gaskets and Packing
20) Naval Ships Technical Manual Chapter 254, Condensors, Heat Exchangers and Air Ejectors
YFB 92-01De-Fueling, and Re-Fueling Of Craft
01.1Fuel Removal / Refueling
01.1.1Provide/install oil boom services around the periphery of the craft prior to transfer of fuel from craft.
01.1.2Pump out / remove/ fuel / lube oil , as required from each fuel tank and stow in clean approved containers IAW local regulations ashore for use in operational craft, total of approx. 4,000gal fuel, 90 gals lube oil.
Test lube oil and fuel prior to transferring back to YFB at end of availability. Filter fuel during transfer.
01.1.3Remove/secure oil boom around the periphery of the craft after completion of fuel transfer.
YFB 92-02Safety/Q/C Requirements.
02.1Establish safety work plan for dry-docking/undocking and repair of the craft
02.2Ensure all PPE requirements are in good working condition and always available on site.
02.3Maintain gas free for entry until completion of repairs in confined spaces.
02.4All safety sign boards must be visible on travel lift area or job site.
02.5Hard hat is mandatory and no exemption.
02.6Gauges (manometer) for void tank air test must calibrated and tested several times prior to start the job. Observe closely air pressure 2 PSI MAX.
02.7Paint coating shall be free of runs or sags with all borderlines, struck clean, clear and precise.
02.8Apply paint only under weather conditions and coating intervals as recommended by the paint manufacturer.
02.9Extend paint coating curing time as required by weather condition.
02.10Minimum DFT (Dry Film Thickness) shall be listed on QPL-24647
02.11Metal exterior surfaces of the craft shall be coated in accordance with the requirements in NAVSEA S9086-VD-STM-030/CH-631V3R2 Table 631-8-10 (Paint System for Exterior Steel Surfaces on Surface Ships)
02.12Provide temporary lighting and ventilation in to all tanks as needed to maintain gas free certificate. Ensure lighting fixtures are explosion proof.
02.13All corners, edges and underneath (stiffeners, gazettes and coaming) that cannot be reached by sandblasting sand shall be cleaned by means of appropriate portable decaling equipment, chipping hammer and wire brush to ensure metal surfaces are rust free prior to prime coat.
02.14All corners, edges underneath (stiffeners, gazettes and coaming) that cannot reached by spray paint shall be stripe coated manually with brush to ensure metal surfaces are properly preserved.
02.15Zinc anode surfaces and fasteners shall not be preserved or painted.
YFB 92-03Docking and Undocking
03.1Docking Requirements
03.1.1Use of a dockmaster and trained docking crew using ref. c. 1 and 2. provide, set, and align the blocks. Blocking shall be positioned to ensure that equipment on the surface of, or protruding from the hull will not be damaged and shall be accessible for removal and repairs. Provide at least the minimum clearances between the craft's hull and dry-dock necessary to accomplish dry-dock work within these specifications. Hull openings shall not be obstructed.
03.1.2Take and record tank soundings and determine ballast requirements to dry-dock the craft with list, trim, and stability conditions.
03.1.3Prepare/position in place Docking Blocks at Wharf "W" designated docking area IAW with ref. c1 and 2.
03.1.4Install lifting pad eyes onto YFB 92. Ensure proper torque of bolts.
03.1.5Utilize travel lift to lift craft from the water and transport to blocks.
03.1.6Inspect the fit on the blocks immediately after the craft is dry-docked. Provide shimming between blocking and the craft's hull in the event of hull movement due to removal of ballasting or shifting of craft load.
03.1.7Pressure wash the craft's underwater hull and fittings with minimum 2500 psig nozzle pressure and hand scrape to ensure the removal of dirt, slime, marine growth, fouling, and other foreign substance.
03.1.8Upon completion of bottom cleaning and painting, shift the craft on the blocks and ensure 100 percent bottom cleaning and painting.
03.1.9Accomplish stability and loading calculations based on weight changes made on the craft while in dry-dock. Obtain the tank loading condition upon entering dry-dock, and a list of weight changes during the dry-dock period. Based on the conditions upon docking and weight changes made while in dock. accomplish calculations to determine conditions upon undocking. Determine ballast requirement to maintain list, trim, and stability conditions.
03.1.10After hull is submerged, accomplish a watertight integrity inspection of contractors work affecting water tightness of the hull plating below the water level. Once inspected and found watertight, continue with the undocking.
YFB 92-04Inspection and Cleaning of Underwater Hull
04.1Inspection of Underwater Hull
04.1.1Accomplish a visual inspection of the underwater hull and freeboard for, deterioration, damage, and other defects immediately after dry-docking including locations. Submit one legible copy in electronic media of the report to the COR.
YFB 92-05Cleaning of Underwater Hull
05.1After visual inspection, pressure wash approximately 7,300-SF of the entire underwater hull area up to and including outboard side of the gunnels. This includes all vertical and horizontal areas.
05.2Remove all marine growth from the shafting, propeller, & rudder by water blasting.
05.3After removal, water blast areas blocked by sea cooler, sea chest strainers, and zinc anodes.
YFB 92-06Hull Zinc Protector Renewal
06.1Removals
06.1.1Upon satisfactory completion of hull cleaning, break loose 112 1/2" stud bolt nuts.
06.1.2Remove approximately 56 ea. 1-1/4" x 6" x 12" old hull zinc protectors. Replace any missing and defective bolts and nuts as required. For planning purposes plan to replace 56 each stud bolts and nuts. Inspect weld around base of studs for cracks.
06.1.2Installation
06.2.1Chase existing zinc anode stud threads and weld/replace defective studs with new ones
06.2.2Install approximately 80 ea. New zinc anodes with self locking nuts. Ensure locations conform to drawing locations.
YFB 92-07Sea Chest & Keel Cooler, Repair/Replace as required
07.1Inspection / Removal / Repair as required
07.1.1Remove 4-ea grills/covers and 8 each flange covers to facilitate removal of 4 each keel cooler assemblies.
07.1.2Pull out 4 each existing engine keel coolers from bottom hull and transport to engine shop using government provided fork lift, for cleaning.
07.1.3Purchase 2 ea. Keel cooler for main engine and 2 ea. Keel cooler for generators.
07.1.4Upon receipt leak test 4-ea keel cooler at 30 PSI, IAW NSTM Chapter 254, Rev. 1.
07.1.5Visually inspect/Penetration test sea chest box plating / structure and hull penetration.
07.1.6Repair keel cooler coamings and sea chest box as required.
07.1.7Open, recondition, and paint/preserve sea chest, suctions, discharges, and strainers plates.
07.2Installation
07.2.1Install 4 each engine keel cooler to their proper locations. Replace/install new rubber gaskets on each keel cooler.
07.2.2If new keel cooler will be installed, conduct hydrostatic test prior to installation.
07.2.3Upon satisfactory completion of installations conduct gasket leak test and pressure test onboard to insure for seaworthy prior to waterborne.
YFB 92-08Valve Repair/Replace as required
08.1Valve Removal
08.1.1Pull out the following isolation valves listed below; blank off/secure resultant openings.
08.1.2Provide hull tech services to pre-up frozen bolts and nuts for the removal of each valve.
08.1.3Provide fire watch services until completion of valves removal.
08.1.4Replace worn out bolts and nuts as required.
08.1.5Provide rigging services to rig out all valves from engine room to the shop and vise versa.
08.1.6Locations/Descriptions Size Qty
08.1.7a) Main Sea chest Valve 8" 1-ea Overhaul
08.1.8b) Main Sea chest Vent Valve 1-1/2" 1-ea Replace
08.1.9c) Main Sea chest Vent Valve 1/2" 1-ea Replace
08.1.10d) MPDE Keel Cooler Isolation Valves 3" 2-ea Replace
08.1.11e) MPDE Keel Cooler Isolation Valves 4" 2-ea Overhaul
08.1.12f) MPDE Isolation Valves Sea Water Muffler Cooler 2-1/2" 2-ea Overhaul
08.1.13g) SSDG Keel Cooler Isolation Valves 2" 4-ea Overhaul
08.1.14h) SSDG Isolation Valves Sea Water Muffler Cooler 1-1/2" 2-ea Replace
08.1.15k) Bilges Water Piping Valves 2" 1-ea Overhaul
08.1.17l) Bilges Water Piping Valves 1-1/2" 3-ea Replace
08.1.18K) Replace basket strainers
08.2Misc. Valves Overhaul
08.2.1Open up, and inspect main sea chest valve.
08.2.2Ensure valve has bench marks for reference prior to dismantle.
08.2.3Re-assemble valve internal mechanism and install new packing and gaskets IAW NSTM Chapters 505 and 078 procedures and specifications. Ensure valve mechanism will not be interchange or swap although they have the same characteristics and size.
08.2.4Lubricate valves stem prior to hydrostatic test.
08.2.5Upon completion of valve repairs, hydrostatic test each valve IAW NSTM Chapter 505. Ensure each valve will hold pressure during normal close position.
08.2.6Fabricate/machine 10 each appropriate blank flanges for hydro test of each valve.
08.2.7Install new valve packing material
08.2.8Upon satisfactory completion of repairs preserve all valves IAW ref. c.5.
08.3Valve Re-installation
08.3.1Upon satisfactory completion of hydro test (bench test), re-install valves with new gaskets and tightening fasteners by sequence to required torque. Touch up paint as required.
YFB 92-09FWD & AFT Rudder Blade Removal, Inspection, Repairs, and Re-installation
9.1Removal
09.1.1Upon satisfactory completion of hull cleaning, Secure rudders with chain block prior to uncouple from rudder stock flange.
09.1.2Provide Hull TECH. services for the removal of fwd and aft rudder assemblies.
09.1.3Torch cut each bolt flange to facilitate disconnection of rudder blade from the rudder post.
09.1.4Make the necessary removals and unship the rudders and all associated components.
09.2Cleaning, Inspection and Repair
09.2.1HP water blast to white metal, inspect entire rudder(s) surface for defects. Noted defects will be addressed by Condition Found Report (CFR).
09.2.2Check the condition of rudder blades and associated components.
09.2.3Check existing joints weldment for cracks.
09.2.4Provide incidental repairs on rudder blades existing weldments approximately 5 lineal feet.
09.2.5Upon completion of rudder blades and associates components, hydrostatic test each blade IAW NSTM Chapter 074 Volume 1.
09.3Rudder Air Test
09.3.1Air test rudder for two (2) PSI. Pressure must hold for a minimum of ten (10) minutes for water tight integrity. Ensure appropriate equipment will be use for air test.
09.3.2Check manometer calibration sticker attached. Ensure it is calibrated and updated. Record drop test on QA form government representative to witness.
09.4Preservation
09.4.1Upon completion of repairs and satisfactory test, flood rudder with metal conditioning compound. (Flow Coat).
09.4.2Reinstall 2-each drain plugs with thread sealant compound.
09.4.3Rudder surfaces prepared and applied with appropriate pretreatment/preservation prior to re-install.
09.4.4Install 2-ea zinc anode to rudder surfaces (1 each side, evenly spaced in the center of the rudder) complete with mounting studs bolts and nuts after completion of repairs and preservations.
09.4.5Preserve each rudder with four coat (2 coat of primer paint and 2 coat anti-fouling) system as applied to underwater hull.
09.5Re-installation
09.5.1Re-install rudder and associated components upon completion of all necessary repairs and preservation.
09.5.2Ensure all flange bolts are properly torqued IAW appropriate torques specification (QCR-06-097).
09.5.3Provide rigging and welder assist for the re-installation of rudders. (Welding services will be required for securing of nuts and bolt heads.)
09.5.4Fire watches will be posted during any hot work evolutions.
YFB 92-10FWD & AFT Rudder Stock Removal, Replace and Re-installation
10.1Removal
10.1.1Secure fwd and aft rudder stock assembly with chain block prior to disconnection of mechanical linkages and packing gland assembly.
10.1.2Make the necessary removals and unship the rudder stock, including associated components.
10.2Cleaning and Examination
10.2.1Clean all parts of rudder stock trunk, bearing surfaces and other related components free of all corrosion, grease and any foreign matter.
10.2.2Issues which may be found during this phase will be addressed on Condition Found Report (CFR)
10.3Repair of Rudder Stock/ Rudder Shaft Bearings
10.3.1Purchase rudder stock material IAW blue print reference drawing.
10.3.2Upon receipt of rudder stock material provide machining services IAW existing designed characteristics.
10.3.3Fabricate new flanges for the rudder stock assemblies.
10.3.4Upon completion of flange fabrication provide welding services for fabrication of rudder stock assemblies.
10.3.5Provide Q/C services for penetration test of new weldments.
10.3.6For planning purposes one rudder flange will be replaced, any further issues discovered during this phase will be reported via Condition Found Report (CFR) to the government representative.
10.4Re-installation
10.4.1Re-install rudder stocks including associated components.
10.4.2Furnish/manufacture and install new Upper and Lower Carrier Bearing.
10.4.3Clean stuffing box and securements free of all rust, corrosion and other foreign matter. Chase the thread all fastening material.
10.4.4Recondition existing packing gland and stud bolts of the rudder stuffing box.
10.4.5Reassemble packing gland upon installation of new packing material and adjust packing gland stud bolts equally. Replace any missing and defective fastening material as required. (Final adjustment of packing gland will be performed during sea trial).
10.4.6Reinstall all mechanical linkages and realign (mechanical & electrical) rudder post at midship prior to hydraulic cylinder installation.
10.5Operational Testing
10.5.1Final operational test will be conducted during sea trial.
10.5.2Cycle rudder from hard right to hard left and back to midship. Be sure rudder indicator pointer is at zero when back rudder assembly to midship.
YFB 92-11FWD & AFT Propeller Inspection / Removal / Replacement and Installation
11.1Removal / Inspection
11.1.1Upon satisfactory completion of hull cleaning, make necessary removal of the fwd and aft propellers.
11.1.2After removal from the craft clean fwd and aft propeller surfaces, free of all corrosion and any foreign matter.
11.1.3Rigging shop personnel will transport propellers to the shop.
11.2Off Island Efforts
11.2.1Upon completion of inspection provide condition report for off island repair prior to ship out.
11.2.2Fabricate appropriate design of wooden crate for 2 ea. Propeller.
11.2.3Crate and secure on pallet and send propellers off island for repair/recondition.
11.2.4Issues which may be found during this phase will be addressed by Contractor Found Report (CFR).
11.3Installation
11.3.1Upon receipt of propellers inspect and conduct penetration test prior to installation.
11.3.2Provide rigging and forklift services for installation. Ensure rigging services will be IAW P-307 standard operating procedures.
11.3.3Final operational test will be conducted during sea trial.
YFB 92-12FWD & AFT Propeller Shaft Assy. Removal, Repairs as required and Re-installation
12.1Removal
12.1.1Provide forklift and rigging services for the removal of Fwd Aft propellers.
12.1.2Remove propeller IAW ref c.16 a guide.
12.1.3Uncouple main fwd and aft propeller shaft couplings from intermediate shaft couplings and make necessary removals and disconnection of shaft cooling systems and packing gland assemblies.
12.1.4Remove/unship the entire fwd and aft propeller shaft assemblies including all associated components, transit to machine shop for inspection of shaft trueness and physical working condition. .
12.1.5Uncouple fwd and aft intermediate shafts from main engines, remove and transit to machine shop for inspection of shaft trueness and physical working condition. Un-repairable discrepancies will be addressed by CFR.
12.1.6Upon removal of propeller shaft assemblies, remove stern tube cutlass bearings and strut barrel cutlass bearings.
12.2Repairs
12.2.1Swing shaft section between the lathe centers and check for run out and trueness to maximum run out 0.010 inch. True face of coupling by skim cut and recondition threads, keys and keyway. Provide clad welding as required. Provide written report to Senior Maintenance Engineer.
12.2.2Provide machining services for incidental repairs of shafts assemblies.
12.2.3Provide rigging services until completion of repair.
12.2.4Issues not covered which may be found during this phase will be addressed by Condition Found Report (CFR).
12.2.5For planning purposes provide clad welding for 70 lineal inches.
12.3Installation
12.3.1Provide forklift and rigging services for installations of Fwd Aft propellers.
12.3.2Replace fwd and aft stern tube cutlass bearings and strut barrel cutlass bearings IAW ref c. 17 as a guide. Alignment and fitting of bearing(s) shall be included on this item.
12.3.3Re-couple fwd and aft intermediate shafts to main engines. Shims may be required for alignment.
12.3.4Re-install/re-couple the fwd and aft main propeller shaft assemblies including all associated components.
12.3.5Upon completion of installation of propeller shaft and propeller, confirm all clearances and condition IAW ref. c. 17. Document clearances and condition on QA form to government.
YFB 92-13Bottom Hull Inspection and (UT) Ultrasonic Thickness Test for Integrity
13.1Hull Plating UT and Inspection
13.2Upon completion of HP water blasting, lay-out 24" pattern/guide spots as a mark on the underwater hull surfaces to include the free board (hull area between the designated waterline to the main deck) in preparation for UT inspection.
13.3Conduct UT on prepared spots, on the underwater hull surfaces to include the free board (hull area between the designated waterline to the main deck) using a 24" grid system, plot readings. Submit one legible copy in electronic media, of a report listing results of thickness reading to the government representative. List in one column the design thickness of plate inspected. List in another column, next to the design thickness, the actual thickness readings taken. List specific locations with respect to frame, strake, or measurements from suitable reference points. Provide CFR to government representative for all areas less than 50 percent of design thickness and areas of pitting.
13.4Perform visual inspection of all machinery foundations, submit report to government on condition. Submit (CFR) on all foundations with discrepancies.
YFB 92-14Miscellaneous Bottom Hull Removal/Repairs and Installation
14.1Fwd/Aft Shaft Compartment Hull Repairs
14.1.1Removal
14.1.2Prior to removal of hull plate, secured strut bearing housing to insure shaft alignment will not be affected during crop out and removal.
14.1.3Anticipate crop out approximately 300 sq.ft. of hull plate and 150 L.F. stiffeners and frames.
14.1.4Upon completion of removal, all burrs, and sharp edges shall be ground smooth then sanded to remove roughness prior to install new material.
14.1.5Provide rigging assist until completion of repair.
14.1.6Provide gas free certificate prior to start the work.
14.1.7Gas free services will remain active throughout the craft until completion of all efforts requiring gas free services.
14.2Repair and Installation
14.2.1Provide precise templates prior to final cut of the material required for fabrication.
14.2.2All new materials will be preserve IAW ref. c.5.
14.2.3All welding work shall be IAW ref. c.8.
14.2.4Weld in place all new Hull Frame members and Hull Stiffeners.
14.2.5All disturbed areas caused by welding and heating shall be clean and preserve IAW ref. c.5.
14.2.6Provide rigging assist until completion of repair.
14.2.7Repair and paint all new surfaces and surfaces damaged IAW ref. c.5
YFB 92-15Fwd/Aft Rudder Compartment Hull Repairs
15.1Removal
15.1.1Prior to removal of hull plate, secured rudder shaft housing to insure shaft alignment will not be affected during crop out and removal.
15.1.2Anticipate crop out approximately 50 sq.ft. of hull plate and 25 L.F. stiffeners and frames.
15.1.3Upon completion of removal, all burrs, and sharp edges shall be ground smooth then sanded to remove roughness prior to install new material.
15.1.4Provide rigging assist until completion of repair.
15.1.5Provide gas free certificate prior to start the work.
15.1.6Gas free services will remain active throughout the craft until completion of all efforts requiring gas free services.
15.2Repair and Installation
15.2.1Provide precise templates prior to final cut of the material required for fabrication.
15.2.2Fabrication shall be IAW existing designed characteristics.
15.2.3All welding work shall be IAW ref. c.8.
15.2.4Weld in place all new Hull Frame members and Hull Stiffeners.
15.2.5Repair and paint all new surfaces and surfaces damaged IAW ref. c.5.
15.2.6Provide rigging assist until completion of repair.
YFB 92-16Replace P/S Hull Pipe Fenders
16.1Removal
16.1.1Crop out dented/deteriorated fenders penetrating main deck and hull plate approximately 100 L.F.
16.1.2Upon completion of removal all burrs, and sharp edges shall be ground smooth then sanded to remove roughness prior to install new material.
16.1.3Prior to removal insure all equipment affected will be remove in place prior to start the work.
16.1.4Provide fire watch services until completion of repair.
16.1.5Provide rigging services for removal and reinstallations.
16.1.6Purchase 4" diameter black pipe , schedule 80 IAW blue print reference drawing.
16.1.7Upon receipt of the pipe layout and cut/split into two pieces equally. Ensure interior surfaces of the pipe will be preserve prior to installations.
16.2Fabrication/Installation
16.2.1Prior to installations of new pipe fender insure all vacated areas shall be preserve IAW ref. c.5.
16.2.2Install new pipe fender in accordance with blue print drawing design characteristics.
16.2.3Provide precise templates prior to final cut of the material required for fabrication.
16.2.4All burrs and sharp edges shall be removed to prevent damage to equipment or personnel injury.
16.2.5Repair and paint all new surfaces and surfaces damaged IAW ref. c.5.
16.2.6All welding efforts shall be IAW NSTM Chapter 074-Volume 1 Welding and Allied Processes.
YFB 92-17Main Deck Misc. Structural Removal/Repairs/Fabrication and Installation
17.1Fwd and Aft Ramp Removal and Re-installation
17.1.1Removal
17.1.1.1Disconnect/secure mechanical system accessories of fwd and aft ramp prior to removal of ramp.
17.1.1.2Remove and replace existing wire rope of fwd & aft bow ramp hoisting system approx. 140-lf x 3/4" OD.
17.1.1.3Remove/rig-out fwd and aft ramp from the craft and move to an area for blasting to near white metal and preservation. (To include installation of lifting pad eyes and crane services).
17.1.1.4Provide government crane services for the removal and reinstallation of bow ramps.
17.1.1.5Remove existing fwd and aft gasket
17.1.2Bow Ramp Surfaces Preparation, Repair as Required (Fwd. & Aft.)
17.1.2.1Remove/chip out non-skid of fwd/aft bow ramp and replace, IAW ref. c.5.
17.1.2.2Provide/cut access openings on fwd and aft ramp to facilitate inspection. Discrepancies will be addressed by CFR.
17.1.2.3Provide machining services manufacture new Bow Ramp retaining pins, (Tapered end)
17.1.3Re-installation (Perform this task after preservation effort)
17.1.3.1Rig, re-install/realign fwd and aft ramp to its original configuration to the craft.
17.1.3.2Repair/recondition fwd and aft ramp mechanical hoisting system including all associated accessories, replace all hoisting system sheaves.
17.1.3.3Install new fwd and aft gaskets with appropriate securing fasteners.
17.2Bulwarks Inspection, Removal/Repair and Reinstallation
17.2.1Removal
17.2.1.1Remove counter balance weights from deck of the craft. Move to an area for blasting to near white metal, prime, and paint IAW ref. c.5..
17.2.1.2Inspect18-ea 4" x 2" x 8" brackets for counter balance weights and list discrepancies on CFR.
17.2.1.3Check fwd/aft bow ramp hinges for cracks, list discrepancies on CFR.
17.2.1.4Inspect bulwark structures around the craft and list discrepancies on CFR.
17.2.1.5Inspect all hatches and list discrepancies on CFR.
17.2.1.6Remove/Replace 8-ea 4" x 7" deteriorated mounting plate/brackets electrical outlet located all around passenger area.
17.2.1.7All welding efforts shall be IAW NSTM Chapter 074-Volume 1 Welding and Allied Processes.
17.2.1.8Inspect all mooring chocks and cleats, list discrepancies on CFR.
17.3Emergency Generator Room Inspection
17.3.1Inspect emergency generator room louvers for deterioration and list discrepancies on CFR.
14.6.1.1Remove all interference prior to start hot work.
17.4CO2 Locker Misc. Repairs
17.4.1Inspect CO2 locker bulkheads, decks, louvers. Provide list of discrepancies on CFR.
17.501 Level Paint Locker/01 Level Storage Room Preservation
17.5.1Clean deck plate to bare metal including door frame prior to preservation. Ensure preservation shall IAW ref. c.5.
17.5.2Detach/Remove air tight door to facilitate blasting and preservation.
17.5.3Sand paper clean bulkhead prior to prime coat and final coat. Preserve IAW c.5.
YFB 92.18Engine Room Misc. Repair
18.1Deck plates and Bilge Inspection/Preservation
18.1.1Removal
18.1.1.1Mark all deck plates and map locations.
18.1.1.2Remove and clean all deck plates.
18.1.1.3Degrease and clean bilges, dry out.
18.1.1.4Inspect bilges, angle irons for deterioration and areas of paint failure. List discrepancies on CFR.
18.1.1..5Preserve and paint bilges IAW ref. c.5.
18.1.2Installation
18.1.2.1Reinstall deck plates with new fasteners.
YFB 92-19Fwd/Aft Bow Ramp Hydraulic Ram/Hoisting Mechanism Rebuild / Replace
19.1Removal Overhaul/Replace Hydraulic Ram Cylinder
19.1.1Remove Hydraulic rams from the FWD & AFT bow ramp equipment compartment, two rams from each compartment, four (4) rams total.
19.1.2Provide Hull Tech assist for the removal of 8 ea. sheave assembly.
19.1.3Remove entire hoisting mechanism and transport from boat to engine shop for inspections.
19.1.4Provide forklift and rigging assist until completion of repairs.
19.1.5Dismantle completely hydraulic cylinder, conduct inspection of internal sections of hydraulic ram. Replace defective parts as required.
19.1.6Purchase/Replace all seals of hydraulic ram completely prior to assemble and bench test. Ensure each cylinder are leaks free to hold working pressure.
19.1.7Inspect sheave assemblies and submit discrepancies on CFR; Plan on replacing a total of 8 ea. sheave assemblies.
19.1.8Purchase/Replace hoisting cable IAW blue print drawing specifications.
19.2Reinstallation of Hydraulic Ram Cylinder and Hoisting Mechanism
19.2.1Upon completion of ramps and hoisting mechanism repairs, transport all parts from engine shop to the job site.
19.2.2Install align hydraulic ram assemblies to each respective sheaves of hoisting mechanism in (fwd /aft) bow compartment .
19.2.3Operational test of hoisting mechanism upon undocking of the boat.
19.2.4Provide government crane services during operational test. The crane will hold the bow ramp assembly during the process of up and down testing and until the hoisting mechanism are properly adjusted and hydraulic ramps are leak free.
19.2.5Provide incidental machining as required.
19.2.6Provide Hull Tech assist for installations of sheave assemblies.
19.2.7Note: All crane services will be provided by the Government.
YFB 92-20Misc. Gauges/Meter Removal, Calibration and Reinstallation
20.1Removal
20.1.1Disconnect and remove in service all electrical and mechanical gauges/METERS for recalibration.
20.1.2Provide marker for electrical meters wiring connections prior to remove in service for recalibration.
20.1.3Provide bench mark for mechanical gauges fittings and fasteners prior to remove in service for recalibration;
20.1.4Fwd/Aft MPDE (Main Propulsion Diesel Engine) - 16 ea. gauge, mechanical
20.1.5Fwd/Aft SSDG - 8 ea. gauge, mechanical
20.1.6EG (Emergency Generator) D.E. - 3 ea. gauge, mechanical
20.1.7EG (Emergency Generator) switch board - 4 ea. meter meter, electrical
20.1.8SSDG's Main Switch Board - 8 ea. gauge, mechanical
20.1.9Battery Charger - 6 ea. meter, electrical
20.1.10Search Light - 2 ea. meter, electrical
20.1.11Compressor - 2 ea. gauge, mechanical
20.1.12Potable Water Pump - 2 ea. gauge, mechanical
20.1.13Pilot House - 12 ea. gauge, electrical
20.1.14Engine Room EOSS - 17 ea. gauge electrical
20.2Reinstallation
20.2.1Upon completion of recalibration reinstall all gauges/meters to respective equipment designations.
20.2.2Installations of gauges will be IAW original configurations designed.
20.2.3Ensure all mechanical/electrical gauges and electrical meter holders, brackets and screws are properly installed/secured prior to place back in service.
20.2.4Double check electrical wiring connections of main switch board meters prior to shift power place back in service.
20.2.5Check all mechanical gauges during dock trial for possible leaks prior to sea trial.
YFB 92-21Gas Freeing Task Requirement
21.1Gas free tanks for entry and cleaning to include all engine room, shaft compartment, rudder compartment, bow ramp compartment, fuel tanks and potable water tank, certify to be safe for entry / safe for hot work. Where hot work is to be accomplished, Gas free those areas and any adjoin area(s) to a gas free level which will safely allow/permit hot work.
21.2Entry by any person or persons into confined spaces is prohibited until such spaces have been inspected, tested, and certified safe for entry and or work.
21.3Upon completion of testing, a gas free certificate and test log shall be issued which indicates the conditions required for entry and/or work existing at the time of the certificate was issued.
21.4Test results shall be satisfactory before a certificate for entry or work is issued. Approved Gas Free Certificate shall be posted prior to personnel entry or commencement of any work.
21.5When testing indicates a hazardous condition exists, stop all work and remove personnel from the space.
21.6Stop entry and work until all unsafe conditions have been corrected or controlled and the space has been retested and recertified.
21.7The certificate duration shall not exceed a maximum period of eight hours.
21.8Should the space be left unmanned and unsupervised (such as breaks, lunch period, or shift change) the space shall be retested and recertified before entry into or work on the space.
21.9Use only approved, safe, spark-proof or explosive proof equipment when oxygen-enriched atmospheres or flammable or explosive vapors, gases or materials may be present.
21.10When materials and conditions within the space introduce flammable, toxicants or unsafe oxygen levels, identify and remove the cause or source of the contamination by cleaning, flushing and draining, tagging out, isolating or plugging and ventilating before entry of work. Space must be recertified gas free and safe for anticipated work.
21.11Adequate ventilation shall be maintained for the duration of the work.
21.12Entry shall not authorize into spaces that contain flammable, toxic, oxygen-deficient of oxygen-enriched atmosphere with out proper PPE.
21.13Safety Department shall specify the PPE's and emergency rescue provisions necessary for safe entry and work.
21.14The atmosphere shall be periodically or continuously tested and maintain safe condition as directed by the Safety Department during hot work and cleaning operations such as sludge removal that has the potential for generating toxic fumes.
21.15Gas free services will remain active throughout the craft until completion of all efforts requiring gas free services.
21.16Adequate ventilation shall be maintained for the duration of the work.
21.17Provide temporary lighting and ventilation into all tanks as required. Ensure all lighting/ventilation is explosive proof.
YFB 92-22Tank Cleaning, Inspection and Preservation
22.1Main Fuel Tank Cleaning
22.1.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.1.2Hold tanks open for inspection and approval from Safety department rep.
22.1.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.1.4Clean entire interior metal surfaces approximately 447 sq.ft.
22.1.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.1.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank. Ensure tank is completely dry prior to install manhole cover and to place back in service.
22.1.7Perform these tasks in coordination/succession with the gas freeing efforts.
22.2Inspection and Preservation
22.2.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work.
22.2.2All replacement materials shall be blasted to white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.2.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and IAW ref. c.5.
22.2.4Any additional repairs beyond this quantity will be addressed by DFR.
22.2.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.2.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.2.7Upon completion of cleaning and preservation closeout tanks with government representative.
22.3Port/Stbd. Day Tank Cleaning
22.3.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.3.2Hold tanks open for inspection and approval from Safety department rep.
22.3.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.3.4Clean entire interior metal surfaces approximately 582 sq.ft.
22.3.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.3.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank. Ensure tank is completely dry prior to install manhole cover and to place back in service.
22.3.7Perform these tasks in coordination/succession with the gas freeing efforts.
22.4Inspection and Preservation
22.4.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work. Provide report to government representative.
22.4.2All replacement materials shall be blasted to near white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.4.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and ref. c.5.
22.4.4Any additional repairs beyond this quantity will be addressed as CFR.
22.4.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.4.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.4.7Upon completion of cleaning and preservation closeout tanks with government representative.
22.5Emergency Gen. Day Tank Cleaning
22.5.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.5.2Hold tanks open for inspection and approval from Safety department rep.
22.5.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.5.4Clean entire interior metal surfaces approximately 212 sq.ft.
22.5.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.5.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank.
22.6Inspection and Preservation
22.6.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work.
22.6.2All replacement materials shall be blasted to white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.6.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and ref. c.5.
22.6.4Any additional repairs beyond this quantity will be addressed on CFR.
22.6.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.6.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.6.7Upon completion of cleaning and preservation closeout tanks with government representative, existing tank access covers with new gasket.
22.7Potable Water Tank Cleaning
22.7.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.7.2Hold tanks open for inspection and approval from Safety department rep.
22.7.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.7.4Clean entire interior metal surfaces approximately 420 sq.ft.
22.7.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.7.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank. Ensure tank is completely dry prior to install manhole cover and to place back in service.
22.7.8Perform these tasks in coordination/succession with the gas freeing efforts.
22.8Inspection and Preservation
22.8.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work.
22.8.2All replacement materials shall be blasted to white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.8.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and ref. c.5.
22.8.4Any additional repairs beyond this quantity will be addressed on CFR.
22.8.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.8.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.8.7Upon completion of cleaning and preservation closeout tanks with government representative, existing tank access covers with new gasket. Replace threaded fasteners as required.
22.9Fwd/Aft Rudder Hydraulic System Tank Cleaning
22.9.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.9.2Hold tanks open for inspection and approval from Safety department rep.
22.9.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.9.4Clean entire interior metal surfaces approximately 246 sq.ft.
22.9.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.9.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank. Ensure tank is completely dry prior to install manhole cover and to place back in service.
22.9.7Perform these tasks in coordination/succession with the gas freeing efforts.
22.9.8Upon satisfactory cleaning and drying of the tank, change hydraulic oil up full level mark of sight glass. Replace oil filters.
22.9.9Prior to operational test check physical working of steering pump coupling.
22.10Inspection and Preservation
22.10.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work.
22.10.2All replacement materials shall be blasted to white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.10.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and ref. c.5.
22.10.4Any additional repairs beyond this quantity will be addressed on CFR.
22.10.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.10.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.10.7Upon completion of cleaning and preservation closeout with government representative with existing tank access covers with new gasket. Replace threaded fasteners as required.
22.11Fwd/Aft Bow Hydraulic Ramp Tank Cleaning
22.11.1Remove bolted access manhole opening of the tank to facilitate inspection, repair and preservation.
22.11.2Hold tanks open for inspection and approval from Safety department rep.
22.11.3Provide temporary lighting and ventilation into all tanks prior to start the task. Ensure all lighting/ventilation is explosive proof.
22.11.4Clean entire interior metal surfaces approximately 154 sq.ft.
22.11.5Pressure wash to bare metal interior plate surfaces including all vertical, horizontal surfaces, framing and piping. Ensure cleaning agent is safety approved and environmental friendly.
22.11.6Upon completion of pressure wash, request government vacuum truck services for the removal of oily water, debris, and sludge's from the tank. Ensure tank is completely dry prior to install manhole cover and to place back in service.
22.11.7Perform these tasks in coordination/succession with the gas freeing efforts.
22.11.8Upon satisfactory cleaning and drying of the tank, Fill with hydraulic oil up full level mark of deep stick. Replace oil filters.
22.12Inspection and Preservation
22.12.1Visually inspect all vertical and horizontal, interior/exterior surfaces of all tanks. Accomplish this effort immediately after successful gas freeing phase of tanks and craft for safe entry and hot work.
22.12.2All replacement materials shall be blasted to white metal and appropriate pretreatment/preservation applied prior to installation to the tanks.
22.12.3Replacement of plates, all welded joints and disturbed areas will be preserved IAW Manufacturer procedures and specifications and ref. c.5.
22.12.4Any additional repairs beyond this quantity will be addressed on CFR.
22.12.5Perform these tasks in coordination/succession with the gas freeing efforts.
22.12.6Preserve interior and exterior tank surfaces IAW ref. c.5.
22.12.7Closeout tanks with government representative, with existing tank access covers with new gasket. Replace threaded fasteners as required.
22.12.8Upon satisfactory cleaning and drying of the tank, change hydraulic oil up full level mark of deep stick. Replace oil filters as required.
22.12.9Conduct operational test, observe ramp for possible leaks. Repair as required.
YFB 92-23Painting and Preservation Efforts
23.1Blasting Preparation / Removal of Interferences as required
23.1.1Plug and block all openings throughout the craft where blast media could be introduced into the interior of the craft. Cover all windows from the outside with plywood.
23.1.2Rig and mobilize blasting equipment near YFB 92.
23.1.3Remove eight Lifting pad eyes store in gear box until after HP water blasting and painting is complete.
23.2Hull Surfaces Preparation / Blasting / Painting and Preservation
23.2.1Prepare/blast to near white metal the entire horizontal and vertical exterior hull surfaces from the keel up to gunnel approx. 6,500-SF total. To include the free board (hull area between the designated waterline to the main deck)
23.3Underwater Hull, (Keel to Top of Boot top)
23.3.1Primer: One anti corrosion coat MIL-PRF-24647, Type II, Red and One coat MIL-PRF-24647, Type II, Gray, 5-7 MILS/Coat.
23.3.2Top Coat from keel to bottom of boot top: One anti-fouling coat MIL-PRF-24647, Type II, Red and One anti-fouling coat MIL-PRF-24647, Type II, Black. 5-7 MILS/Coat. Top coat for boot top will be same anti-fouling except two coats of black.
23.3.3Exterior Surfaces (Above Boot top with Exception of Areas Receiving Nonskid)
23.3.4Primer: One coat MIL-PRF-23236, Type V or VI, Class 5 or 7. 4-8 MILS.
23.3.5One stripe coat and One full coat MIL-PRF-23236, Type V or VI, Class 5 or 7. 4-8 MILS/Coat
23.3.6Top Coat horizontal surfaces, decks: One coat deck gray no. 26008 (FED STD 595), MIL-PRF-24635 Type III, Grade B,. 2-3 MILS.
23.3.7Top Coat vertical surfaces: One coat haze gray no. 26270 (FED STD 595), MIL-PRF-24635, Type III, Grade B. 2-3 MILS. Or MIL-PRF-24763, Type II or III, class 2, Grade B. 2-4 MILS.
23.4Non-skid Areas of Deck
23.4.1Primer: One coat proprietary non-skid primer listed on the qualified products list (QPL) for MIL-PRF-24667 of type to match non-skid that will be applied.
23.4.2One stripe coat of proprietary non-skid primer listed on the QPL for MIL-PRF-24667
23.4.3Non-Skid: One coat of dark gray, MIL-PRF-24667, Type I, V, VI or VIII, Comp G or One coat dark gray, MIL-PRF-24667, Type II, III, IV, Comp G.
23.5Main Deck Above up to Pilot House Top Surfaces preparation/Blasting/Painting and Preservation
23.5.1Prepare/blast to near white metal the entire horizontal and vertical exterior hull surfaces from the main deck to the top of the pilot house, approx. 5,612-SF total.
23.5.2Primer: One coat MIL-PRF-23236, Type V or VI, Class 5 or 7. 4-8 MILS.
23.5.3One stripe coat and One full coat MIL-PRF-23236, Type V or VI, Class 5 or 7. 4-8 MILS/Coat
23.5.4Top Coat horizontal surfaces, decks: One coat deck gray no. 26008 (FED STD 595), MIL-PRF-24635 Type III, Grade B,. 2-3 MILS.
23.5.5Top Coat vertical surfaces: One coat haze gray no. 26270 (FED STD 595), MIL-PRF-24635, Type III, Grade B. 2-3 MILS. Or MIL-PRF-24763, Type II or III, class 2, Grade B. 2-4 MILS.
23.5.6Top Coat horizontal surfaces on top of pilot house: One coat enamel white.
23.6Engine room Surfaces Preparation/Painting and Preservation
23.6.1Clean bilges areas in each space rinse, with fresh water, pump down, and dispose of oily liquids and debris to attain a clean, dry condition of the individual bilges. Dispose of oily liquids and debris IAW local regulations.
23.6.2Remove deck plates in a way of painting and preservation of bilges/engine room.
23.6.3Prepare, scrape, and re-paint interior surfaces of engine room bulkheads, overheads, & bilges Approx. 8,000-SF.
23.6.4Scrape, clean, prepare, prime, and paint interior surfaces of aft and fwd bow ramp hoisting mechanism compartment, Approx. 1,984-SF total. Prime and paint IAW ref. c.5.
23.6.5Ensure all PPE's are in good working condition.
23.6.6Gas free all confine space to gain entry. Gas free certificate shall be displayed at all times on the job site.
23.6.7Maintain appropriate ventilation on all confine space until completion of repair.
23.7Shaft Compartment (fwd./aft) Surfaces Preparation/Painting and Preservation
23.7.1Clean bilges areas in each space, rinse with fresh water, pump down, and dispose of oily liquids and debris to attain a clean, dry condition of the individual bilges. Dispose of oily liquids and debris IAW local regulations.
23.7.2Remove deck plates and interference in a way of painting an preservation of interior hull structures.
23.7.3Prepare, scrape, and re-paint interior surfaces of engine room bulkheads, overheads, & bilges Approx. 8,000-SF, IAW ref. c.5.