Amendment_0002_Solicitation_N6883618R0003.pdf
PDF 161 KB Posted
- Solicitation number
- N6883618R0003
About this file
Amendment_0002_Solicitation_N6883618R0003.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_N6883618R0003_TE_14.xlsx | XLSX spreadsheet | |
| RFP_N6883618R0003_TE_12.xlsx | XLSX spreadsheet | |
| RFP_N6883618R0003_TE_13.xlsx | XLSX spreadsheet | |
| Amendment_0001_Solicitation_N6883618R0003.pdf | ||
| SPOT_Plus_Census_Template_User_Guide_2012_Oct_30.pdf_0.pdf | ||
| RFP_N6883618R0003_Technical_Exhibits.zip | ZIP file | |
| Solicitation_N6883618R0003.pdf | ||
| N6883618R0003_N6883618R0003_Technical_Exhibits.zip | ZIP file | |
| N6883618R0003_Draft_PWS_for_Solicitation_N6883618R0003.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6051418NSGBPORTOPS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to provide changes that w ill be included in the contract aw ard. All other terms and conditions remain unchanged.
The solicitation closing date/time has been extended until February 14, 2018 at 4:00 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6883618R0003
X 9B. DATED (SEE ITEM 11)
10-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Feb-2018
CODE
NAVSUP FLC JACKSONVILLE
CONTRACTS DIVISION
ELAINE FLORENCE
BLDG 110 3RD FLOOR NAS
JACKSONVILLE FL 32212-0097
N68836 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6883618R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CONTRACT AWARD CHANGES
The following changes will be incorporated in the contract Performance Work Statement:
1. PWS C 22.4 has been changed to:
C 22.4 Substitutions of Key Personnel. No substitutions of key personnel shall be made except in accordance with
Substitution or Addition of Personnel Clause.
2. PWS C 26.1 has been changed to replace FAR 52.243-1 Alternate II (Fixed Price) “Changes” with FAR
52.212-4(c), “Changes” as follows:
C 26.1 Publications applicable to services under this contract are listed herein. These publications (the latest edition) are mandatory to the extent that a specific procedure or requirement is specified in the Performance Work
Statement. The Government shall provide publications and forms listed at the start of the contract. Supplements or amendments to listed publications may be issued during the life of the contract. Changes to Navy or DOD publications which impact on the Contractor’s costs may be considered under FAR 52.212-4(c), “Changes”.
Changes to other Government or regulatory publications referenced in this document shall not be the subject of a claim under either of the aforementioned clauses. It is the Contractor’s responsibility to ensure that all mandatory publications are posted and up to date. Upon completion of the contract, the Contractor shall return to the
Government all issued publications, updated to the latest revision.
The following changes will be incorporated in the contract award Technical Exhibits. The changes below are highlighted in orange in the attached revised Technical Exhibits. The bold underlined language identifies the specific changes made.
1. Technical Exhibit 12 Line Item 03.4.1.5 has been changed to:
Replacement plates, all welded and disturbed areas must be preserved IAW NSTM 631 painting schedule.
2. Technical Exhibit 12 Line Item 09.4.1 has been changed to:
Note: All valves require applicable hydrostatic testing and documentation. All sea chest valves and flanges listed on items 09.4.5 through 09.4.21 and item 09.4.24 will be (GFM) Government Furnished Material (GFM) ordered by the Contractor using the NTE CLIN. The valves listed in 09.4.22 and 09.4.23 will not be replaced.
3. Technical Exhibit 13 Line Item 08.2.3 has been changed to:
Re-assemble valve internal mechanism and install new packing and gaskets IAW NSTM Chapters 505 and 078 procedures and specifications. Ensure valve mechanism will not be interchange or swap although they have the same characteristics and size.
4. Technical Exhibit 13 Line Item 08.2.5 has been changed to:
Upon completion of valve repairs, hydrostatic test each valve IAW NSTM Chapter 505. Ensure each valve will hold pressure during normal close position.
5. Technical Exhibit 14 Line Item 08.2.3 has been changed to:
Re-assemble valve internal mechanism and install new packing and gaskets IAW NSTM Chapters 505 and 078 procedures and specifications. Ensure valve mechanism will not be interchange or swap although they have the same characteristics and size.
6. Technical Exhibit 14 Line Item 08.2.5 has been changed to:
Upon completion of valve repairs, hydrostatic test each valve IAW NSTM Chapter 505. Ensure each valve will hold pressure during normal close position.
7. Technical Exhibit 15 Line Items under 02.1:
Corrected to reflect 1. a, b, and c.
8. Technical Exhibit 15 Line Item 02.1.9 has been changed to:
All loosed paint areas shall cleaned to bare metal prior to prime paint in accordance with existing designed characteristics.
9. Technical Exhibit 15 Line Item 03.2.1.1 has been changed to:
Gas free tanks for entry and cleaning to include all chain locker, engine room bilges, machinery spaces, steering gear room, half-pipe fenders, and rudder, certify with Shipyard Marine Chemist Certificate or Gas Free Engineer. Where hot work is to be accomplished, Gas free those areas and any adjoining areas) to a gas free level which will safely allow/permit hot work. All bids shall include all gas free services throughout the vessel where required for the entire yard work cycle.
10. Technical Exhibit 15 Line Item 03.3.1.5 has been changed to:
Close/secure tanks with new tank access covers, & securing hardware including mounting/retainer ring, stainless steel counter sink screws (on all the main deck tank covers) and new gasket material after completion of repair work and satisfactory inspections by On-Site Representative.
11. Technical Exhibit 15 Line Item 03.4.1.5 has been changed to:
Replacement plates, all welded and disturbed areas must be preserved IAW NSTM 631 painting schedule.
12. Technical Exhibit 15 Line Item 05.2 through 05.2.4 has been changed to 05.2 through 05.2.7 as follows:
05.2 Inspection, Removal and Cleaning of Fendering Systems
05.2.1 Note: As called out in this statement of work all Bow Fender, P/S side D-Fenders, P/S side Underwater
Fender materials shall be new condition purchased and provided by the Contractor.
05.2.2 Visually inspect underwater hull for presence and condition of all bow fenders, side fenders, split pipe fenders.
05.2.3 Remove fendering systems to accommodate cleaning, complete visual inspection of fender for cuts, tears and deterioration.
05.2.4 Pressure wash and clean fendering systems to remove all marine growth.
05.2.5 Inspect split pipe fenders for dent, damaged, excessive corrosion and deterioration.
05.2.6 Submit condition report of inspection pertaining to condition of fendering system to On-Site
Representative.
05.2.7 Issues outside this scope of work which may be found during this phase will be addressed SEPCOR
(Separate Correspondence) to On-Site Representative.
13. Technical Exhibit 15 Line Items under 05.3:
Numbered correctly to reflect 05.3.1 through 05.3.4
14. Technical Exhibit 15 Line Item 06.2.1 has been changed to:
Remove all hull zinc protectors and defective welded stud bolts and grind flush as stated in NAVSHIPS Drawing
No. 600-4442435 installed in various locations.
15. Technical Exhibit 15 Line Item 07.2.1 has been changed to:
Note: All sea chest valves listed on items 07.2.7 up to 07.2.22 will be provided by the Contractor.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Feb-2018 04:00 PM to 14-Feb-2018 04:00 PM.
(End of Summary of Changes)