Solicitation Amendment 2 N6852027Q10030002 SF 30 Industry Questions.pdf
PDF 584 KB Posted
- Attached to
- V22 Assembly Hardware
- Solicitation number
- N6852027Q1003
About this file
This document is Standard Form 30 (Amendment 0002) to solicitation N6852027Q1003, issued by the Naval Fleet Readiness Center at Patuxent River, Maryland, and effective 23 November 2026. The amendment incorporates industry questions and answers into the solicitation package for assembly and testing of wired cable assemblies (WLB1, WLB2, and WLB3).
The Q&A clarifies key requirements: quotes should be submitted as PDF via email with up to three examples of similar work; the complete solicitation package consists of SF 1449, Statement of Work, drawings 18D90975-18D90977 and wirelists WL18D90975-WL18D90977, with additional drawings 18D90973-18D90974 and 18D90978 available upon request; approximately 90% of government-furnished material is available immediately with remaining material provided as received; wire will be furnished in bulk requiring contractor cutting; Circuit Card Assembly 18D90978-1, Enclosure 18D90973-1, and Insert 18D90974-1 will be provided ready for installation; contractors must track parts shortages and notify the government immediately; J-STD-001 or IPC/WHMA-A-620 workmanship standards apply; ring-out testing requires point-to-point continuity verification against wirelists with documented proof of testing; a "set" comprises one each of WLB1, WLB2, and WLB3; the government will perform functional testing on the first manufactured set with feedback within 1-2 business days; and monthly status reports shall document issues, assemblies manufactured, and parts shortages. Contracting Officer is Kurt Dronenburg and Contract Specialist is Melinda Bowen.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6852027Q10030001 SF 30.pdf | ||
| STATEMENT OF WORK.docx | DOCX document | |
| C9 Solicitation - N6852027Q1003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
Miscellaneous text in this section has been modified to:
Points of Contact
Melinda Bowen
Contract Specialist melinda.a.bowen.civ@us.navy.mil
Contracting Officer:
Kurt Dronenburg kurt.j.dronenburg.civ@us.navy.mil
Company:
For Information Only:
PID number: N68520-26-SIMACQ-JC00000-0336
Questions from Industry
What should offerors submit for the Technical Capability and Past Performance factors, and are there format or page limits? How should quotes be submitted (email to you, or another method)? The quote can be submitted as PDF sent via email. The company can provide examples of similar work performed in the past for work quality evaluation. Up to three example of similar work should suffice.
Section J lists no attachments. Please confirm the complete solicitation package is the SF 1449, the Statement of Work, drawings 18D90975, 18D90976 and 18D90977, and wirelists WL18D90975, WL18D90976 and WL18D90977. The drawings identified along with 18D90973, 18D90974 and 18D90978 would be sufficient to provide an estimate. If contractor identifies a particular drawing that is missing, we can provide upon request.
Can the remaining drawings in the Technical Data Package (for example 18D90973, 18D90974 and 18D90978), along with unit dimensions and weights, be made available before quotes are due? These drawings have already been provided to Teresa Harper. If these need to be provided again, please let me know.
Government-furnished material and information (SOW 3.3, 4.0, 5.0)
How many days after award will the Government-furnished material and Technical Data Package be delivered, and will the material arrive in one shipment or several? Most 90% of the material is available already and remaining has already been ordered. We can provide all available material so contractor can begin work. The remaining material will be provided as received.
If the material or Technical Data Package arrives late or incomplete, will the 180-day delivery schedule be adjusted accordingly? Yes, impacts of late arrival of Technical Data Package and material will be evaluated and contractor is requested to reach out for schedule impacts.
Additionally, if contractor identifies issues with Technical Data Package or finds discrepancies, contractor is requested to reach out for clarification.
Does the Government-furnished material include every item on the drawing parts lists, including items listed as "AR" (wire, insulation sleeving, label tape, insulation tape) and solder? Will wire be furnished pre-cut or in bulk? All material that is required to assemble all sets will be provided. The wire will be in bulk and contractor will be required to cut to appropriate length.
Will Circuit Card Assembly 18D90978-1, Enclosure 18D90973-1 and Insert 18D90974-1 be furnished complete and ready for installation?
Yes, these items will be ready to be installed and contractor will not be required to do any work to assemble or purchase.
Will the Government furnish overage for contacts and small hardware to cover normal assembly attrition? What is the process for replacing short or damaged furnished items, and for disposition of excess material at completion? The contractor will be required to keep a track of parts that they fall short on. As soon as a shortage is identified, the contractor shall reach out immediately so the requested item can be procured in adequate timeframe.
N6852027Q10030002
Is the review of furnished material "for completeness and suitability" (SOW 3.3) limited to count and visual inspection, or is electrical or functional testing of furnished components and circuit cards expected? The government will perform functional testing once the hardware is received. The contractor, as stated in the SOW, will be required to performed ring-outs on all wired assemblies for all hardware sets. The contractor shall provide documented proof that testing was performed.
Will the Government furnish any special tooling (crimp tools, positioners, insertion and extraction tools), or is all tooling contractor-provided? The government doesn't intend on providing any special tools for this work. All tools required for the workload are normal shop tools. If contractor identifies a special tool requirement, they shall reach out for confirmation.
Assembly and testing (SOW 3.3, 3.6)
Is a specific workmanship standard or operator certification required (for example J-STD-001 or IPC/WHMA-A-620)? Yes
For the ring-out testing in SOW 3.6, is point-to-point continuity verification against the wirelist sufficient, or is additional verification expected (for example resistance values or circuit card function)? Will the Government provide a test procedure or a required format for test documentation, and does a contractor-developed procedure require Government approval before use? Point-to-point continuity verification would suffice. A specific test procedure will not be provided.
Delivery, packaging and reporting (SOW 3.2, 3.5)
Please confirm that a "set" is one each of WLB1, WLB2 and WLB3, so that delivery "in sets of ten" means 30 assemblies per shipment and one tri-wall box per three-assembly set. Are partial shipments acceptable, with invoicing and acceptance per shipment? Yes, a set consist of WLB1, WLB2, WLB3. Government is requesting that first manufactured set is delivered for functional testing and workmanship. Upon receipt, government will perform necessary testing and provided feedback in 1 - 2 business days.
Are there marking or packaging requirements beyond SOW 3.5.1? No
Is there a required format or submission method for the monthly status report, and for Government property reporting? Contractor shall report any issues, assemblies manufactured and parts shortage.
N6852027Q10030002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 23 Nov 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N68520 |
| AdmCode: |
| IssuedBy: FLEET READINESS CENTER |
ATTN CHIEF OF STAFF, 47038 MCLEOD ROAD, BLDG 448
PATUXENT RIVER, MD 20670
UNITED STATES
Melinda BOWEN, Email: melinda.a.bowen.civ@us.navy.mil Telephone: 771-237-1757 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N6852027Q1003 |
| SolDate: 16 Nov 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 0 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The reason for the amendment is to include questions and answers from industry. |
| ContNameTitle: |
| CoNameTitle: Jeffrey Smith |
| ContDate: |
| CODate: 23 Nov 2026 |