This is a Statement of Work (SOW) for the manufacture, assembly, inspection, and delivery of Intermediate (I) Level Peculiar Support Equipment (PSE) in support of the V-22 MV-22B Block C Tiltrotor Aircraft Program via Foreign Military Sales (FMS) for the Japan Ground Self-Defense Force. The contract is designated as a Small Business Set Aside and requires the production of one (1) Functional Test Set, MATS (Part Number 90249, NIIN 01-566-8231). The contractor must comply with an extensive government-furnished technical drawing package, including detailed schematics, PCB fabrication files, mechanical drawings, and component specifications. All work must be performed in accordance with applicable military standards including MIL-STD-130 for identification marking, MIL-HDBK-61A for configuration management, and MIL-STD-129R for packaging and marking.
Quality and compliance requirements include ISO 9001 certification for the quality assurance program, implementation of Item Unique Identification (IUID) marking per DFARS Clause 252.211-7003, and CMMC Level 2 Self-Assessment compliance to protect Controlled Unclassified Information (CUI). The contractor must notify the NAVAIR Technical Point of Contact a minimum of thirty days prior to planned acceptance to allow government inspection by DCMA. All items must be packaged using best commercial practices for electronic component protection, marked in accordance with military standards, and shipped via traceable transportation to TPS Aviation, Inc. in Hayward, California. The contractor is responsible for maintaining accurate UID records, registering IUID data through Wide Area Work Flow (WAWF) or equivalent methods, and ensuring all components meeting the government's unit acquisition cost threshold of $5,000 or greater are properly marked and registered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FMS Mats Functional Test Set
FOR THE V-22 AIRCRAFT
1.0 SCOPE
This Statement of Work (SOW) establishes the tasks that must be performed by the contractor for the manufacture, assembly, inspection and delivery of Intermediate (I) Level Peculiar Support Equipment (PSE) end items in support of the Japan Ground Self-Defense Force (GOJ/JGSDF) MV-22B Block C Tiltrotor Aircraft Program via Foreign Military Sales (FMS). This effort will result in a Small Business Set Aside Contract.
APPLICABLE DOCUMENTS
| Drawing 3909AS9999, Rev B | Identification Plate Support Equipment | |
| MIL-HDBK-61A | Configuration Management Guidance | |
| MIL-HDBK-781A | Reliability Test Methods, Plans, and Environments |
For Engineering Development, Qualification, and Production
| MIL-STD-130 | Identification Marking of U.S. Military Property |
| DFARS Clause 252.204-7012 | Safeguarding Covered Defense Information and |
Cyber Incident Reporting
| Parts List 9049, Rev AB | PSDAF-V22 Mats Functional Test Set Parts List | ||
| Drawing List, Rev A | PSDAF-V22 Mats Functional Test Set Drawing List | ||
| Drawing 10000023100, Rev AE | Functional Test Set, MATS | ||
| Drawing 10000023331, Rev BC | Panel Functional Control Assembly PSDAF-V22 | ||
| Drawing 10000023332, Rev AD | Cable Electrical Power Harness PSDAF-V22 | ||
| Drawing 10000023333, Rev AD | Cable FMU Electrical Harness PSDAF-V22 | ||
| Drawing 10000023336, Rev AD | Cable Input Power Extender PSDAF-V22 | ||
| Drawing 10000023337, Rev BC | Cable MV Capacitance PSDAF-V22 | ||
| Drawing 10000023339, Rev CB | Product Structure Diagram PSDAF-V22 90249 | ||
| Drawing 10000023363, Rev BC | PCB Assy, Display PSDAF V-22 | ||
| Drawing 10000023365, Rev BB | PCB Fab, Display PSDAF-V22 | ||
| Drawing 10000023458, Rev BC | Schematic, V-22 MATS | ||
| Drawing 10000023873, Rev BB | Bracket Internal V-22 Functional Test Set | ||
| Drawing 10000023925, Rev CC | Front Panel V-22 | ||
| Drawing 10000023926, Rev BB | Overlay Front Panel V-22 | ||
| Drawing 10000023930, Rev AD | Placard Contents PSDAF-V22 | ||
| Drawing 10000024100, Rev AB | Lens EMI 2.40 X 1.85 Gray 16 w/ Gold Plating | ||
| Drawing 10000024101, Rev AB | Lens 2.40 X 1.85 Green 50 | ||
| Drawing 10000024102, Rev AB | Lens EMI 1.85 X 1.00 Gray w/ Gold Plating | ||
| Drawing 10000024103, Rev AB | Lens 1.85 X 1.00 Green 50 | ||
| Drawing 10000024109, Rev AE | Foam Insert 1122 Case PSDAF-V22 | ||
| Drawing 10000024235, Rev AC | Cover Modified PSDAF V-22 | ||
| Drawing 10000024659, Rev AC | Placard UID Bell/Boeing V-22 | ||
| Drawing 10000024665, Rev AD | Case Modified V-22 | ||
| Drawing 10000025014, Rev AB | Enclosure Modified Fuel 2-Pak | ||
| 90436_A0_fab_readme.doc | Fab file list & descriptions, contacts, instructions | ||
| 90436_A0_ThruHolePlated.ncd | ASCII, NC Drill, Through hole plated | ||
| 90436_A0_ThruHoleNonPlated.ncd | ASCII, NC Drill, Non plated Through Hole | ||
| 90436_A0_ContourNonPlated.ncd | ASCII, NC Drill, Contour Non Plated. | ||
| 90436_A0.ipc | 356 IPC-D-356 Netlist | ||
| 90436_A0_BottomMask.gdo | BottomMask Gerber 274X | ||
| 90436_A0_BottomPaste.gdo | BottomPaste Gerber 274X | ||
| 90436_A0_DrillDrawing.gdo | Drill Drawing Gerber 274X | ||
| 90436_A0_L1.gdo Layer 1 | TOP Gerber 274X | ||
| 90436_A0_L2.gdo Layer 2 | Gerber 274X | ||
| 90436_A0_L3.gdo Layer 3 | Gerber 274X | ||
| 90436_A0_L4.gdo Layer 4 | Gerber 274X | ||
| 90436_A0_Panel.gdo | Panel Outline Gerber 274X | ||
| 90436_A0_TopMask.gdo | TopMask Gerber 274X | ||
| 90436_A0_TopPaste.gdo | TopPaste Gerber 274X | ||
| 90436_A0_TopSilkscreen.gdo | TopSilkscreen Gerber 274X | ||
| 90436_A0_BottomSilkscreen.gdo | BottomSilkscreen Gerber 274X | ||
| 90436_A0_Scores.gdo | V-Score Gerber 274X | ||
| 10000023365_AA_FAB_DWG.pdf | FAB Drawing, Fablink | ||
| 10000023365_AA_ip356 | 356 IPC |
90249_41364_DL_NULL_0001_NULL_NULL_0001_29_U_N_N_N_N
90249_41364_PL_AB_0001_AB_NULL_0001_29_U_N_N_N_N
10000011847_51190_NULL_BC_0001_BC_NULL_0001_29_U_N_N_N_N
10000011847_BC_S0001_BC_F0001
10000023338_DA_S0001_DA_F0001
10000023363_51190_NULL_BC_0001_BC_NULL_0001_29_U_N_N_N_N
10000023849_41364_NULL_AB_0001_AB_NULL_0001_29_U_N_N_N_N
10000027064_41364_NULL_AA_0001_AA_NULL_0001_29_U_N_N_N_N
2.0 REQUIREMENTS
2.1 General
The contractor shall provide materials and services as required to procure, manufacture, assemble, inspect and deliver quantity below to support V-22 FMS outfitting of the I-Level PSE end item in accordance with the respective Government furnished drawing package as called out below:
| CLIN |
| Platform |
| Part Number |
| NIIN |
| Nomenclature |
| Qty |
| 1001 |
| V-22 FMS |
| 90249 |
| 01-566-8231 |
| Functional Test Set, MATS |
| 1 |
2.2 Production Deliveries Inspection
The contractor shall notify the NAVAIR Technical POC a minimum of thirty (30) days prior to planned acceptance the opportunity to inspect, at the discretion of the Government, to ensure continued compliance with the drawings and requirements of the contract. A Certificate of Conformance may be authorized.
2.3 Quality Assurance Program
The Contractor shall maintain a quality system that ensures that each I PSE end item is manufactured in accordance with the approved drawings. Shall be ISO9001 Compliant.
2.4 Item Unique Identification (IUID) Marking of US Military Property
In accordance with DFARS Clause 252.211-7003 Item Identification and valuation, the contractor is required to mark and register all end items and their components meeting the requirements called out in latest version of MIL-STD-130 at time of contract award. These include components for which the Governments unit acquisition cost is $5,000 or greater, or any component, subassembly or embedded part that is serially managed, mission essential or a controlled inventory item.
2.4.1 Construct and Method
Details on creating the UID and the marking method are contained in MIL-STD-130N. The UID may be either UID Construct #1 or Construct #2 with Construct #2 being the preferred method.
2.4.2 UID Location and Marking
The locations and marking methods selected should bear no impact on the performance of the part and minimal configuration change(s) to the part. The UID (including 2D Matrix) should be incorporated onto the data plate, in accordance with drawing 3909AS9999 Rev B. If the 2D matrix can't be incorporated onto the data plate, a 2D matrix sticker can be applied onto the main data plate provided it can be done without covering any critical data. When the 2D Data Matrix is placed directly onto the data plate, the Part Number, Serial Number and CAGE human readable characters are not required. If the above cannot be accomplished, a separate data plate can be attached which contains the 2D Matrix plus the human readable characters for the Part Number, Serial Number and CAGE. This added data plate should be attached in close proximity to the main data plate.
2.4.3 Permanency and Legibility
The UID marking and identification plates, tags, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, or groups shall be permanent during the normal life expectancy of the item and be capable of withstanding the environmental test and cleaning procedures specified for the item. Legibility shall be as required for ready readability as per MIL-STD-130.
2.4.4 UID Registration
The prime contractor has the responsibility to furnish Item Unique Identification (IUID) data to the IUID registry. Data submission of IUID data and acquisition cost should be via Wide Area Work Flow (WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at <http://www.acq.osd.mil/dpap/UID/>.
2.4.5 Records
The contractor shall maintain an accurate, current list of UIDs for all manufactured items on this contract and supply to the government upon request. The list shall include P/N, Serial #, CAGE, UID Location, Construct used, how it was marked and the registration method used.
2.5 Government Inspection and Acceptance
Inspection and Acceptance of all items shall be performed by DCMA.
3.0 Packaging, Handling, Storage and Transportation (PHS&T)
3.1 Packaging Requirements
The Contractor, and any subcontractors or vendors shall comply with best commercial practices for PHS&T procedures in the protection of sensitive electronic components from electrostatic discharge damage. The Contractor shall ensure that all unit, intermediate, and shipping containers are marked in compliance with recognized best commercial practices. The Contractor shall select the most economical mode of transportation for equipment, Support Equipment (SE) end items, spare and repair parts consistent with transportation priority, and required delivery dates. For items FOB destination basis, commercial bills of lading shall be used.
3.2 Marking
Marking shall be in accordance with MIL-STD-129R. Additionally, special marking labels (fragile, delicate, etc.) shall be applied to all unit, intermediate and shipping containers as an integral part of the total pack. The contractor shall select the appropriate special marking label (s) as additional means to protect the items during packaging, handling, storage, transit, and removal from the pack.
Packaging shall be marked with the following: - Part Number - Nomenclature - Quantity - Merial Number - Government contract or purchase order number - Contractor’s name and address - National Stock Number
4.0 Cybersecurity Maturity Model Certification (CMMC) Program
Cybersecurity is a top priority for the Department of Defense (DoD). The defense industrial base (DIB) faces increasingly frequent and complex cyberattacks. To strengthen DIB cybersecurity and better safeguard DoD information, the DoD developed the Cybersecurity Maturity Model Certification (CMMC) Program to assess DoD cybersecurity requirements pertaining to Federal Contract Information (FCI) and Controlled Unclassified Information (CUI).
The items in this acquisition have been deemed to fall into CMMC Level 2- Self-Assessment. CMMC Level 2 requires implementation of the 110 security requirements set forth in NIST SP 800–171 Rev. 2 to protect CUI in contractor information systems. Level 2 assessments are conducted every three years. CMMC Level 2 self-assessment scores are entered by the OSA into SPRS
5.0 Shipping
Shipments shall be transported via a traceable means of transportation. All shipments under this contract shall be addressed per below:
SHIP TO MAPAC: BJA005