N68335-21-Q-0326 Solicitation Amendment 2.docx
DOCX document 41 KB Posted
- Attached to
- Building 369 Demo/Asbestos Removal
- Solicitation number
- N6833521Q0326
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in asbestos removal.xlsx | XLSX spreadsheet | |
| B369 floor plan.pdf | ||
| N68335-21-Q-0326 Solicitation Amendment 1.docx | DOCX document | |
| Exhibit A CDRL Asbestos Report.pdf | ||
| Questions and Answers for N68335-21-Q-0326.docx | DOCX document | |
| Lead Eval Report.pdf | ||
| N68335-21-Q-0326 Solicitation.docx | DOCX document | |
| Past_Performance_Information_Form.pdf | ||
| SFFL 4 Short Term EAL Form 2017.pdf | ||
| Question and Response Form.docx | DOCX document | |
| ATTACHMENT 2 CPAQ.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6833521Q0326
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been modified:
INSTRUCTION TO OFFERORS
INSTRUCTIONS TO OFFERORS
1. DESCRIPTION
SOLICITATION NO.: N68335-21-Q-0326
TITLE/LOCATION: BLDG. 369 Interior Demolition/Asbestos Removal
NAICS CODE: 562910
SIZE STANDARD: $22,000,000.00
PROJECT MAGNITUDE: Between $250,000.00 and $500,000.00 (see FAR 36.204)
QUOTATIONS DUE: 08 September 2021 4:00PM EST.
ATTACHMENTS: 1 – Past Performance Information Form
| 2 – Contractor Performance Assessment Questionnaire |
| 3 – Question and Answer Form |
| 4 - SFFL 4 Short Term EAL Form 2017 |
SITE VISIT (SEE FAR 52.236-27 ALTERNATE I): Attendance is not a requirement for award but is highly encouraged. Any offeror attending a site visit shall do so at its own expense. The Government will not compensate or be responsible for any costs associated with a site visit.
A guided site visit will be conducted on 25 August 2021 and commence at 10:30AM EST. Attendees shall contact David Thesing, email: david.a.thesing.civ@us.navy.mil; phone: 732-267-3498 to confirm attendance and arrange base access. Attendees shall confirm attendance no later than seventy-two (72) hours prior to commencement of the site visit.
WAGE DETERMINATION (SEE SECTION 007000): General Decision Number Davis-Bacon Act WD # NJ20210039 dated May 28, 2021 applies to this solicitation. There is no provision for economic price adjustment. The most recent General Decision Number will apply at time of award through the completion of this project.
2. APPLICABILITY
This solicitation is a Request for Quotations (RFQ), therefore the words “offer” and “offeror” may be construed to mean “quotation” and “quoter”, where appropriate, and the words “proposal” or “proposing” may be construed to mean “quote” or “quoting”, where appropriate.
Offerors shall hold quoted prices firm for 60 days after the date specified for receipt of quotes.
3. PRE-QUOTATION INQUIRIES
All questions concerning this RFQ shall be addressed to Kieran Connolly at kieran.m.connolly2.civ@us.navy.mil. Responses to inquiries will be provided in the form of a Notice or an Amendment and posted to the website https://beta.sam.gov/. The end date for any question submittal shall be Friday, 27 August 2021 by 12:00PM EST., and questions submitted after that time may not be answered. Please submit any questions to the Government using Attachment 3, Question and Answer Form.
4. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION
Contractors must be registered in the System for Award Management (SAM) prior to the closing date for receipt of proposals. Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed via https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls. Quotations from a contractor not registered in the SAM or from a contractor whose SAM registration online Representations and Certifications are not current will not be eligible for award.
5. RFQ AMENDMENTS
Any amendments made to this RFQ before the time set for receipt of quotations will be posted to the Contract Opportunities at https://beta.sam.gov/. Hard copies of the amendment will not be mailed. It is the offeror’s responsibility to check the website periodically for any amendments to this solicitation. Contractors must acknowledge each amendment issued under this solicitation (if any) by completing the necessary section and submitting it with the contractor’s quotation package.
6. PAST PERFORMANCE INFORMATION
The offeror shall submit information that demonstrates quality of performance relative to the size and complexity of this solicitation that is based on recent and relevant contracts or subcontracts currently ongoing or completed within the last three (3) years for similar efforts. Recency, Relevancy, and Quality of information are defined as below:
•Recency of the past performance, which will only consider work performed within three (3) years of the solicitation release date in relation to the functional area being proposed to •Relevancy of the Past Performance, which will consider similarity of scope in terms of requirements within the statement of work in relation to the functional area being proposed to •Quality of the recent, relevant, past performance, which will focus on requirements, schedule, managing the effort being proposed to
The offeror shall use the following attachments to provide past performance information:
| Attachment 1 | Past Performance Information Form |
| Attachment 2 | Contractor Performance Assessment Questionnaire |
The below past performance information will be required for each functional area an Offeror is proposing to:
The Offeror shall complete the Past Performance Information Form, Attachment 1, for each past performance reference performed within three (3) years of the solicitation release date. The Offeror shall submit no more than five (5) Past Performance Information Forms as the Prime Contractor, no more than five (5) forms for each principal subcontractor, and/or no more than five (5) forms for each JV team member. The Offeror shall submit written consent from its principal subcontractor(s (defined as a subcontractor who provides at least 20% of the proposed total price/cost (excluding the Offeror’s profit/fee) for the contract) and JV team member(s) (Contractors that are allowed to compete together for Government Contracts that are Set Aside for small businesses) that will allow the Government to coordinate any past performance issues directly with the Offeror. If the Offeror does not submit the written consent, the Government will address any past performance issues directly with the principal subcontractor or JV Team member and the Offeror will forfeit the opportunity to participate in any related discussions. Consequently, for any principal subcontractor and JV team member that does not provide the written consent, the Offeror shall provide the name, address, phone number, and email address with whom the Government may address any past performance issues.
The Offeror shall provide a narrative on each Past Performance Information form in the “Contract Effort Description” area that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified above.
New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements of this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.
The primary source of past performance information will be PPIRS. If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance within the recency period specified above, for that contract/order, will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment 2, to the Program Manager who is the Assessing Official. The Offeror shall include instructions for the Program Manager to send completed questionnaires within two (2) weeks of its receipt via e-mail to Kieran Connolly, Contract Specialist, at E-mail kieran.m.connolly2.civ@us.navy.mil thereby allowing the customer approximately 2 weeks to complete their response. All CPAQs should be received by the Government concurrently with the Offeror’s proposal submission.
7. QUOTATION DELIVERY REQUIREMENTS
Quotations shall be delivered by email to the address specified below by Wednesday, 08 September 2021 by 4:00PM EST. Quotations received after this date and time will not be considered for award.
Quotations shall be submitted electronically to:
Mr. Kieran Connolly at kieran.m.connolly2.civ@us.navy.mil
Quotes and supporting documentation should be submitted so that they are received by the Contracting Officer before the time and date identified as the deadline for the receipt of quotes to ensure that they will be considered for award. Quoting firms may submit their quotations by:
a. Email. No email sent shall be larger than 4 MB in size. If the proposing company must send multiple emails, then each email must be labeled with the subject as “Email x of n”, where x is the unique number and n is the total number of emails. The time stamp of when the email is received by the Contracting Officer shall be official, so please provide enough time when sending to allow for possible server delays.
All correspondence shall be in English.
1. Standard Form 1442, blocks 14-20C completed.
2. Proposed Price Schedule for all CLINs, SF1442 Section 01000 completed.
3. Attachment 1: Past Performance Information Form.
4. Attachment 2: Contractor Performance Assessment Questionnaire
5. A bid bond, in original, in the amount of 20% shall be submitted to the following address (see FAR 52.228-1).
6. All Representations and Certifications located in Section 004500.
Note: The failure of an Offeror to complete and submit items 1 through 5 listed above will result in the Offeror’s quote being deemed non-responsive and ineligible for further consideration for award.
8. LATE QUOTATIONS
Notwithstanding subparagraph (f) of FAR 52.212-1, the Government reserves the right to consider late quotations, modifications, and revisions if the Contracting Officer determines such considerations are in the best interest of the Government.
EVALUATION FACTORS FOR AWARD
EVALUATION FACTORS FOR AWARD
BASIS FOR AWARD:
This solicitation is set aside for 100% Small Business. Award of the contract resulting from this solicitation will be made to the responsible offeror whose quote is one that conforms to requirements set forth in the solicitation (i.e., meets all minimum mandatory requirements specified in the Statement of Work/ Performance Work Statement (SOW/PWS)), has an Acceptable past performance assessment rating and offers the lowest price.
The contractor shall fully read and meet all conditions and submit all required documentation as set forth in the buy package/ bid documents requirements and complete those requirements in full.
In addition, as a minimum, simultaneously with their bid the contractor shall also submit the following but not limited to separate detailed technical documents addressing the following items:
List of relevant and recent completed project references, showing that the contractor and any sub companies have mechanics with experience and are technically proficient in this specific type of required work. Said list shall provide as a minimum a point of contact person (POC) with POC’s full name, email, title, company & department name, phone number, address, email and a detail description on the work performed.
Compliance with this scope of work by all sub-contractors shall be the sole responsibility of the contractor.
A detailed capability statement must be provided showing that the contractor and any sub-contractors are competent to perform this required work. The following information as a minimum shall be provided in the company’s Capability Statement: Name and company branding, slogan (if any) summary description of the company; Core Capabilities; Description of major services offered; Federal Small Business Certifications; Contract Vehicles in which you participate (Federal and State); State Certifications document that records the individual and organizational achievements, competencies, and the business accreditations, letters of recommendations.
Provide detailed manufacturer’s cut sheets, shop submittal of the product(s), specifications and manufacturers information ensuring full compliance with the statement of work and bid documents requirements.
This solicitation is for items prepared in accordance with the format in FAR Part 36. This solicitation is issued as a Request for Quotation (RFQ) in accordance with FAR 13.106. Written quotes are required (oral offers will not be accepted). Submission of quotes must be in accordance with “Instructions to Offerors”. The Government intends to award a Firm Fixed Price contract. Since award of the Firm Fixed Price contract will be based on initial responses, offerors are highly encouraged to quote their most advantageous pricing in their initial response. Award of the contract will be made using the Simplified Acquisition Procedures in accordance with FAR 13.106-2(b)(1).
The Government reserves the right to eliminate from award consideration any or all quotes at any time prior to award of the contract(s) that do not conform to the solicitation and to negotiate with offerors in the competitive range.
The Government intends to evaluate the quotes and award the Firm Fixed Price contract without discussions with offerors (except clarifications as described in FAR 15.306(a)), but the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
BASIS FOR EVALUATION:
(i) Basis of Evaluation of Price: The Government will evaluate price per Item No(s) to determine fairness and reasonableness in accordance with FAR 13.106-3. In accordance with FAR 13.106-3 before making award the contracting officer must determine the proposed price is fair and reasonable. The contracting officer may, whenever possible, base price reasonableness on competitive quotations or offers.
(ii) Basis of Evaluation of Past Performance: Each Offeror will be evaluated on its past performance based on recent and relevant contracts or subcontracts currently ongoing or completed within the last three (3) years for similar efforts. The Government will focus on information that demonstrates quality of performance relative to size and complexity of the procurement under consideration and relevance of the performance to the requirements of the SOW of the solicitation. Sources other than those identified by the Offeror may be contacted by the Government. There are three aspects to the past performance evaluation:
· Recency of the past performance, which will only consider work performed within three (3) years of the solicitation release date in relation to the functional area being proposed to
· Relevancy of the Past Performance, which will consider similarity of scope in terms of requirements within the statement of work in relation to the functional area being proposed to
· Quality of the recent, relevant, past performance, which will focus on requirements, schedule, managing the effort being proposed to
A separate quality rating will not be assigned. However, a past performance assessment rating of Acceptable or Unacceptable will be based on the Offeror’s overall record of past performance taking into account the recency, relevancy, and quality of performance.
Sources of past performance evaluation information include information provided by the Offeror in response to the solicitation, information obtained from questionnaires, and any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information Systems, Electronic Subcontract Reporting System, or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.
III. DEFINITIONS
A. EVALUATION RATINGS DEFINITIONS
Past Performance Relevancy Ratings: More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance assessment rating than past performance of lesser relevance.
| Rating |
| Definition |
| Relevant |
| Present/past performance effort involved similar scope of effort this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope of effort this solicitation requires. |
The Government will employ the Performance Assessment Rating Method described in the table below.
NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown (or "neutral") past performance. In the context of Acceptability/Unacceptability, a neutral rating shall be considered "acceptable."
| Rating |
| Description |
| Acceptable |
| Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required efforts, or the Offeror’s performance record is unknown. (See note above). |
| Unacceptable |
| Based on the Offeror’s recent/relevant performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort. |
Deviations from the RFQ minimum/maximum requirements are NOT allowed and the Offeror’s quote for that Item No that deviates from the RFQ will be determined non-responsive and not eligible for award.
AWARD OF CONTRACT
In accordance with FAR 13.004 (Legal effect of quotations) the Government intends to award a Firm Fixed Price contract, to to the responsible offeror whose quote is one that conforms to requirements set forth in the solicitation (i.e., meets all minimum mandatory requirements specified in the SOW/PWS), has an Acceptable past performance assessment rating and offers the lowest price.
The RFQ does not commit the Government to make any award. The Government may cancel or resolicit this RFQ or any part of it at any time. The Contracting Officer reserves the right to reject any and all quotations and to waive any information, or minor irregularities in quotations received.
A written notice of award, mailed or otherwise furnished to the successful offeror within the 60 day window for quote validity, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
SECTION 00 10 00 - SOLICITATION
The offer guarantee has changed from is not required to is required.
(End of Summary of Changes) image1.wmf