N68335-21-Q-0326 Solicitation.docx

DOCX document 118 KB Posted

Attached to
Building 369 Demo/Asbestos Removal
Solicitation number
N6833521Q0326
Issued by

View the file

Other files

File Type Posted
N68335-21-Q-0326 Solicitation Amendment 2.docx DOCX document
Site Visit Sign in asbestos removal.xlsx XLSX spreadsheet
B369 floor plan.pdf PDF
N68335-21-Q-0326 Solicitation Amendment 1.docx DOCX document
Exhibit A CDRL Asbestos Report.pdf PDF
Questions and Answers for N68335-21-Q-0326.docx DOCX document
Lead Eval Report.pdf PDF
Past_Performance_Information_Form.pdf PDF
SFFL 4 Short Term EAL Form 2017.pdf PDF
Question and Response Form.docx DOCX document
ATTACHMENT 2 CPAQ.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6833521Q0326

Section SF 30 - Block 14 Continuation Page (SF 30)

INSTRUCTION TO OFFERORS

INSTRUCTIONS TO OFFERORS

1. DESCRIPTION

SOLICITATION NO.: N68335-21-Q-0326

TITLE/LOCATION: BLDG. 369 Interior Demolition/Asbestos Removal

NAICS CODE: 562910

SIZE STANDARD: $22,000,000.00

PROJECT MAGNITUDE: Between $250,000.00 and $500,000.00 (see FAR 36.204)

QUOTATIONS DUE: 02 September 2021 4:00PM EST.

ATTACHMENTS: 1 – Past Performance Information Form

2 – Contractor Performance Assessment Questionnaire
3 – Question and Answer Form
4 - SFFL 4 Short Term EAL Form 2017

SITE VISIT (SEE FAR 52.236-27 ALTERNATE I): Attendance is not a requirement for award but is highly encouraged. Any offeror attending a site visit shall do so at its own expense. The Government will not compensate or be responsible for any costs associated with a site visit.

A guided site visit will be conducted on 25 August 2021 and commence at 10:30AM EST. Attendees shall contact David Thesing, email: david.a.thesing.civ@us.navy.mil; phone: 732-267-3498 to confirm attendance and arrange base access. Attendees shall confirm attendance no later than seventy-two (72) hours prior to commencement of the site visit.

WAGE DETERMINATION (SEE SECTION 007000): General Decision Number Davis-Bacon Act WD # NJ20210039 dated May 28, 2021 applies to this solicitation. There is no provision for economic price adjustment. The most recent General Decision Number will apply at time of award through the completion of this project.

2. APPLICABILITY

This solicitation is a Request for Quotations (RFQ), therefore the words “offer” and “offeror” may be construed to mean “quotation” and “quoter”, where appropriate, and the words “proposal” or “proposing” may be construed to mean “quote” or “quoting”, where appropriate.

Offerors shall hold quoted prices firm for 60 days after the date specified for receipt of quotes.

3. PRE-QUOTATION INQUIRIES

All questions concerning this RFQ shall be addressed to Kieran Connolly at kieran.m.connolly2.civ@us.navy.mil. Responses to inquiries will be provided in the form of a Notice or an Amendment and posted to the website https://beta.sam.gov/. The end date for any question submittal shall be Friday, 27 August 2021 by 12:00PM EST., and questions submitted after that time may not be answered. Please submit any questions to the Government using Attachment 3, Question and Answer Form.

4. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION

Contractors must be registered in the System for Award Management (SAM) prior to the closing date for receipt of proposals. Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed via https://www.acquisition.gov or by calling 866-606-8220, or 334-206-7828 for international calls. Quotations from a contractor not registered in the SAM or from a contractor whose SAM registration online Representations and Certifications are not current will not be eligible for award.

5. RFQ AMENDMENTS

Any amendments made to this RFQ before the time set for receipt of quotations will be posted to the Contract Opportunities at https://beta.sam.gov/. Hard copies of the amendment will not be mailed. It is the offeror’s responsibility to check the website periodically for any amendments to this solicitation. Contractors must acknowledge each amendment issued under this solicitation (if any) by completing the necessary section and submitting it with the contractor’s quotation package.

6. PAST PERFORMANCE INFORMATION

The offeror shall submit information that demonstrates quality of performance relative to the size and complexity of this solicitation that is based on recent and relevant contracts or subcontracts currently ongoing or completed within the last three (3) years for similar efforts. Recency, Relevancy, and Quality of information are defined as below:

•Recency of the past performance, which will only consider work performed within three (3) years of the solicitation release date in relation to the functional area being proposed to •Relevancy of the Past Performance, which will consider similarity of scope in terms of requirements within the statement of work in relation to the functional area being proposed to •Quality of the recent, relevant, past performance, which will focus on requirements, schedule, managing the effort being proposed to

The offeror shall use the following attachments to provide past performance information:

Attachment 1Past Performance Information Form
Attachment 2Contractor Performance Assessment Questionnaire

The below past performance information will be required for each functional area an Offeror is proposing to:

The Offeror shall complete the Past Performance Information Form, Attachment 1, for each past performance reference performed within three (3) years of the solicitation release date. The Offeror shall submit no more than five (5) Past Performance Information Forms as the Prime Contractor, no more than five (5) forms for each principal subcontractor, and/or no more than five (5) forms for each JV team member. The Offeror shall submit written consent from its principal subcontractor(s (defined as a subcontractor who provides at least 20% of the proposed total price/cost (excluding the Offeror’s profit/fee) for the contract) and JV team member(s) (Contractors that are allowed to compete together for Government Contracts that are Set Aside for small businesses) that will allow the Government to coordinate any past performance issues directly with the Offeror. If the Offeror does not submit the written consent, the Government will address any past performance issues directly with the principal subcontractor or JV Team member and the Offeror will forfeit the opportunity to participate in any related discussions. Consequently, for any principal subcontractor and JV team member that does not provide the written consent, the Offeror shall provide the name, address, phone number, and email address with whom the Government may address any past performance issues.

The Offeror shall provide a narrative on each Past Performance Information form in the “Contract Effort Description” area that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified above.

New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements of this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

The primary source of past performance information will be PPIRS. If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance within the recency period specified above, for that contract/order, will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment 2, to the Program Manager who is the Assessing Official. The Offeror shall include instructions for the Program Manager to send completed questionnaires within two (2) weeks of its receipt via e-mail to Kieran Connolly, Contract Specialist, at E-mail kieran.m.connolly2.civ@us.navy.mil thereby allowing the customer approximately 2 weeks to complete their response. All CPAQs should be received by the Government concurrently with the Offeror’s proposal submission.

7. QUOTATION DELIVERY REQUIREMENTS

Quotations shall be delivered by email to the address specified below by Thursday, 02 September 2021 by 4:00PM Est. Quotations received after this date and time will not be considered for award.

Quotations shall be submitted electronically to:

Mr. Kieran Connolly at kieran.m.connolly2.civ@us.navy.mil

Quotes and supporting documentation should be submitted so that they are received by the Contracting Officer before the time and date identified as the deadline for the receipt of quotes to ensure that they will be considered for award. Quoting firms may submit their quotations by:

a. Email. No email sent shall be larger than 4 MB in size. If the proposing company must send multiple emails, then each email must be labeled with the subject as “Email x of n”, where x is the unique number and n is the total number of emails. The time stamp of when the email is received by the Contracting Officer shall be official, so please provide enough time when sending to allow for possible server delays.

All correspondence shall be in English.

1. Standard Form 1442, blocks 14-20C completed.

2. Proposed Price Schedule for all CLINs, SF1442 Section 01000 completed.

3. Attachment 1: Past Performance Information Form.

4. Attachment 2: Contractor Performance Assessment Questionnaire

5. A bid bond, in original, in the amount of 20% shall be submitted to the following address (see FAR 52.228-1).

6. All Representations and Certifications located in Section 004500.

Note: The failure of an Offeror to complete and submit items 1 through 4 listed above will result in the Offeror’s quote being deemed non-responsive and ineligible for further consideration for award. Submission of item 5 is strongly encouraged to facilitate responsibility assessment per FAR 9.104-1.

8. LATE QUOTATIONS

Notwithstanding subparagraph (f) of FAR 52.212-1, the Government reserves the right to consider late quotations, modifications, and revisions if the Contracting Officer determines such considerations are in the best interest of the Government.

EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

BASIS FOR AWARD:

This solicitation is set aside for 100% Small Business. Award of the contract resulting from this solicitation will be made to the responsible offeror whose quote is one that conforms to requirements set forth in the solicitation (i.e., meets all minimum mandatory requirements specified in the Statement of Work/ Performance Work Statement (SOW/PWS)), has an Acceptable past performance assessment rating and offers the lowest price.

This solicitation is for items prepared in accordance with the format in FAR Part 36. This solicitation is issued as a Request for Quotation (RFQ) in accordance with FAR 13.106. Written quotes are required (oral offers will not be accepted). Submission of quotes must be in accordance with “Instructions to Offerors”. The Government intends to award a Firm Fixed Price contract. Since award of the Firm Fixed Price contract will be based on initial responses, offerors are highly encouraged to quote their most advantageous pricing in their initial response. Award of the contract will be made using the Simplified Acquisition Procedures in accordance with FAR 13.106-2(b)(1).

The Government reserves the right to eliminate from award consideration any or all quotes at any time prior to award of the contract(s) that do not conform to the solicitation and to negotiate with offerors in the competitive range.

The Government intends to evaluate the quotes and award the Firm Fixed Price contract without discussions with offerors (except clarifications as described in FAR 15.306(a)), but the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

BASIS FOR EVALUATION:

(i) Basis of Evaluation of Price: The Government will evaluate price per Item No(s) to determine fairness and reasonableness in accordance with FAR 13.106-3. In accordance with FAR 13.106-3 before making award the contracting officer must determine the proposed price is fair and reasonable. The contracting officer may, whenever possible, base price reasonableness on competitive quotations or offers.

(ii) Basis of Evaluation of Past Performance: Each Offeror will be evaluated on its past performance based on recent and relevant contracts or subcontracts currently ongoing or completed within the last three (3) years for similar efforts. The Government will focus on information that demonstrates quality of performance relative to size and complexity of the procurement under consideration and relevance of the performance to the requirements of the SOW of the solicitation. Sources other than those identified by the Offeror may be contacted by the Government. There are three aspects to the past performance evaluation:

· Recency of the past performance, which will only consider work performed within three (3) years of the solicitation release date in relation to the functional area being proposed to

· Relevancy of the Past Performance, which will consider similarity of scope in terms of requirements within the statement of work in relation to the functional area being proposed to

· Quality of the recent, relevant, past performance, which will focus on requirements, schedule, managing the effort being proposed to

A separate quality rating will not be assigned. However, a past performance assessment rating of Acceptable or Unacceptable will be based on the Offeror’s overall record of past performance taking into account the recency, relevancy, and quality of performance.

Sources of past performance evaluation information include information provided by the Offeror in response to the solicitation, information obtained from questionnaires, and any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information Systems, Electronic Subcontract Reporting System, or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.

III. DEFINITIONS

A. EVALUATION RATINGS DEFINITIONS

Past Performance Relevancy Ratings: More relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance assessment rating than past performance of lesser relevance.

Rating
Definition
Relevant
Present/past performance effort involved similar scope of effort this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope of effort this solicitation requires.

The Government will employ the Performance Assessment Rating Method described in the table below.

NOTE: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown (or "neutral") past performance. In the context of Acceptability/Unacceptability, a neutral rating shall be considered "acceptable."

Rating
Description
Acceptable
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required efforts, or the Offeror’s performance record is unknown. (See note above).
Unacceptable
Based on the Offeror’s recent/relevant performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.

Deviations from the RFQ minimum/maximum requirements are NOT allowed and the Offeror’s quote for that Item No that deviates from the RFQ will be determined non-responsive and not eligible for award.

AWARD OF CONTRACT

In accordance with FAR 13.004 (Legal effect of quotations) the Government intends to award a Firm Fixed Price contract, to to the responsible offeror whose quote is one that conforms to requirements set forth in the solicitation (i.e., meets all minimum mandatory requirements specified in the SOW/PWS), has an Acceptable past performance assessment rating and offers the lowest price.

The RFQ does not commit the Government to make any award. The Government may cancel or resolicit this RFQ or any part of it at any time. The Contracting Officer reserves the right to reject any and all quotations and to waive any information, or minor irregularities in quotations received.

A written notice of award, mailed or otherwise furnished to the successful offeror within the 60 day window for quote validity, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

WAGE DETERMINATION

"General Decision Number: NJ20210039 05/28/2021

Superseded General Decision Number: NJ20200039

State: New Jersey

Construction Type: Building

County: Ocean County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 02/19/2021 2 04/16/2021 3 05/21/2021 4 05/28/2021

ASBE0089-004 07/01/2020

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 48.87 35.98

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 11/01/2019

Rates Fringes

Bricklayer.....................$ 43.56 32.50

Work on high stacks: 22% per hour additional.

BRNJ0007-017 06/04/2018

Rates Fringes

Tile finisher..................$ 40.22 27.07 Tile setter....................$ 46.56 32.69

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

* CARP0006-011 05/01/2021

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 51.89 57%

ELEC0400-005 11/02/2020

Rates Fringes

Electrician & Cable Splicer (Including Low Voltage Wiring)...$ 51.08 37.80

ELEV0005-004 01/01/2018

Rates Fringes

Elevator mechanic..............$ 55.76 32.65

PAID HOLIDAYS:

New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.

ENGI0825-020 07/01/2018

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 51.77 30.45

GROUP 2.....................$ 50.18 30.45

GROUP 3.....................$ 48.27 30.45

GROUP 4.....................$ 46.64 30.45

GROUP 5.....................$ 44.93 30.45

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011-008 07/01/2020

Northern Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 43.14 46.77 Structural and Ornamental...$ 45.44 46.77

IRON0068-012 07/01/2016

Middle Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 44.55 20.88 Structural and Ornamental...$ 46.54 20.88

IRON0350-007 07/01/2016

Southern Third of County

Rates Fringes

Ironworkers:

Reinforcing.................$ 47.02 37.75 Structural and Ornamental...$ 48.02 37.75

LABO0008-001 05/01/2011

Rates Fringes

Asbestos Removal Laborer.........$ 28.37 21.62

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

LABO0222-006 07/01/2012

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 29.85 23.07

LABO0222-009 07/01/2012

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 29.35 23.07

PAIN0021-034 05/01/2020

OCEAN COUNTY (south of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)

Rates Fringes

Glazier........................$ 44.92 30.55

Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.

PAIN0711-016 05/01/2017

OCEAN COUNTY (north of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights):

Glazier........................$ 44.81 23.16

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PAIN0711-018 05/01/2020

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 40.39 26.26

PAIN0711-019 05/01/2017

Rates Fringes

PAINTER (Brush & Roller).........$ 39.25 22.66 PAINTER (Spray)..................$ 40.28 19.98

PLAS0008-007 05/01/2015

Rates Fringes

Plasterer......................$ 36.87 26.33

PLAS0592-036 05/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 42.09 32.82

PLUM0009-018 07/01/2020

OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line):

PIPEFITTER (Including HVAC Pipe Installation)...............$ 51.49 40.58 Service and Repair..........$ 37.48 21.08 PLUMBER (Excluding HVAC Pipe Installation)....................$ 51.49 40.58 Service and Repair..........$ 37.48 21.08

* PLUM0322-007 05/01/2021

OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line)

PIPEFITTER (Including HVAC Pipe Installation)...............$ 46.72 45.69 PLUMBER (Excluding HVAC Pipe Installation)....................$ 46.72 45.69

ROOF0030-027 05/01/2020

Rates Fringes

Roofer

SHINGLES....................$ 29.50 20.90

SLATE AND TILE..............$ 32.50 20.90

ALL OTHER WORK..............$ 29.50 20.90

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669-006 04/01/2021

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 52.19 29.08

SHEE0027-009 06/01/2012

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 43.08 32.52

TEAM0469-004 05/01/2020

Rates Fringes

Truck drivers:

Dump Truck..................$ 42.85 34.135 Off the Road Truck..........$ 43.00 34.135

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

PAID HOLIDAYS:

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

SOW / PWS

PERFORMANCE WORK STATEMENT

FOR

SERVICES & CONSTRUCTION

Building 369 Interior Demolition- Asbestos removal

AT

JOINT BASE MDL, LAKEHURST, NEW JERSEY 08733

June 23, 2021

1.0 STATEMENT OF WORK:

Demolish, remove and dispose of all existing above slab asbestos material within the interior of building 369.

2.0 DESCRIPTION OF SERVICES:

2.1 The Contractor shall provide all personnel, equipment, tools, labor, materials, supplies, supervision, and any and all other items necessary to perform the following work in strict accordance with current applicable United States DOD Criteria and industry standards:

2.1.1 The contractor shall provide all necessary asbestos, lead and hazmat testing where required to confirm any and all asbestos, lead or other hazmat material in the building. Contractor shall ensure that a NJ/EPA certified Asbestos and Lead inspector verifies all areas within the project limits and is integral with the establishing of these areas as well as the proper testing and removal.

Contractor shall properly remove and dispose of all seen, unknown or hidden from view asbestos, lead and or other hazmat material in the building interior. Contractor shall provide the DoD tickets of disposals ensuring compliance with all requirements outlined in OSHA Asbestos and lead in construction standards OSHA 29 CRF 1926.62 https://www.osha.gov/sites/default/files/publications/osha3142.pdf and following all HUD federal guidelines.

Contractor shall develop a written removal procedure for the demolition, removal and disposal of all asbestos, lead or other hazmat material in advance of starting the work. Said procedure and schedule shall be submitted to the CO and shall be review and approved by the DoD Air Force Environmental department prior to commencing work.

See attached spreadsheet with a list of DoD’s known asbestos. Also attached is a report from the outside consultant: AAA LEAD Professional indicating no visible known Lead present within building 369. These lists may not be complete/comprehensive and it does not relieve the contractor as the contractor of Record of liability associated with their performance for the removal of all asbestos, lead and all other hazardous materials.

The material to be removed and disposed of may contain LEAD and or Asbestos and the contractor shall be required to identify any see or unseen materials and shall disposed of properly. The contractor shall perform all required testing, removing and proper disposal of any and all asbestos, lead and other hazardous materials from this building interior in accordance with OSHA, HUD and JBMDL guidelines and procedures for asbestos, lead and hazmat disposal.

2.1.2 Provide any and all parts, equipment, and material necessary for the completion of all necessary work to fully meet these requirements. This work shall be included in the price submitted and at no additional cost to the government.

3.0 PROJECT LOCATION:

The work is located in the NAVAIR (NAWCAD) test area just off taxiway #4, specifically work will be performed inside of building #369 which is situated south of building 355 immediately past Fallen Shipmate Drive on JB MDL, Lakehurst portion.

4.0 TECHNICAL REQUIREMENTS:

4.1 The Contractor shall provide all personnel, equipment, tools, labor, materials, supplies, supervision, and any and all other items necessary to perform the work and shall meet as a minimum all of the following requirements:

4.2 All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards including but not limited to the following:

4.2.1 National Electrical Code (NCE)

4.2.2 American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)

4.2.3 National Fire Protection Assoc.(NFPA)

4.2.4 Occupational, Safety and Health Admin. (OSHA)

4.2.5 Under Writers Lab. (UL)

4.2.6 American Concrete Institute (ACI)

4.2.7 United Facilities Guide Specifications (UFGS)

4.2.8 Whole Building Design Guide (WBDG)

4.2.9 American National Standards Institute (ANSI)

4.2.10 International Building Code (IBC)

4.2.11 Building Officials and Code Admin. (BOCA)

4.3 Contractor will comply with all the requirements of the National Fire Code Standard 241 Safeguarding Construction, Alteration, and Demolition Operations 2002 edition.

4.4 The contractor shall comply with Joint Base MDL Safety, AFOSH (Air Force Occupational Safety and Health) Guidelines and OSHA. Contact the Joint Base Safety Office for further information. 732- 323-7182.

4.5 All existing work or facilities damaged by the contractor’s operations, shall be repaired or replaced by the contractor at no cost to the Government.

4.6 Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base by the contractor, All Federal, State and Local laws and regulations regarding hauling and disposal shall apply. The contractor or his representative shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below after contract notice to proceed is issued.

4.7 The contractor shall secure all work areas at the end of each work day and shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work.

5.0 ELECTRICAL:

5.1 Any and all electrical work shall meet as a minimum NFPA 80, NFPA 101 chapter 7.2, NFPA 70/NEC 2014, NFPA 820, UFC 3-520-01 and UFC 3-550-01 and any and all other applicable rules, regulations or requirements.

5.2 All electrical work shall be in compliance with the National Electrical Code. All fixtures and devices shall be U.L. listed, all receptacles and switches shall be specification grade, and shall be EMT (electrical metallic tubing) for all piping and EMT metallic junction boxes. All exterior work shall have compression fitting and outside weather/water tight enclosures for exterior components. All wire shall be copper conductor, minimum sizes to be set based on DOD criteria. Concealed wiring shall be in EMT, flexible conduit, or shall be MC cable with a full size green ground.

5.3 Contractor shall provide temporary power as necessary to complete the required work during any shut downs.

5.4 Contractor shall coordinate with the JBMDL electrical shops on any and all electrical shut downs and or de-energizing a minimum of two (2) weeks in advance (732-323-2255). All cost associated with this work shall be borne by the contractor.

5.5 All work shall be performed by a licensed electrician skilled in the type of work involved.

All cost associated with this work shall be borne by the contractor.

6.0 ON-SITE FIELD OVERSIGHT:

Contractor shall provide the supervision, manpower, equipment, material, services, and transportation necessary to ensure oversight services throughout accomplishment of this task order. It is the responsibility of the Contractor to establish and maintain open communications between all the concerned parties/authorities associated with accomplishment of this scope of work.

6.2 Contractors entering and working in building 369 shall be monitored by DoD personnel while work is being performed. All contractors shall restrict and limit their movement to the work site only and shall not move throughout the base. The contractor or sub-contractor shall not enter the building, job site or perform work without receiving prior notifing the DoD. The DoD shall be notify 24 hours in advance whenever the contractor and or sub-contractor is planning to work at the site.

7.0 QUALIFIED PERSONNEL:

Contractor shall ensure that only qualified, competent personnel carry out all tasks outlined in this SOW. Competent is defined as registered professional or, where registration is not applicable, trained, and/or certified in their respective field.

8.0 REQUIRED PERMITS: N/A

9.0 TAA COMPLIANT:

All material and equipment installed and purchased shall meet the Trade agreement act and shall be adhered to on all projects. Contractor shall provide verification that this requirement has been met.

10.0 SPECIAL REQUIREMENTS:

10.1 The work site shall remain clean and clutter free since this area is an active employment site.

10.2 The contractor shall provide dust protection to all areas in and around the work area and storage and/or staging areas.

10.3 All dumpsters or other containers for trash and debris shall be located in areas designated by the building manager and shall be subject to removal and / or relocation at the building manager’s request. These requirements shall not impact the performance period.

10.4 All dumpsters or other containers for trash and debris shall be located in areas designated by the Project Manager and shall be subject to removal and / or relocation at the Project Manager’s request. These requirements shall not impact the performance period.

10.5 Storage and staging and lay down areas shall be submitted to contracting three weeks ahead of scheduled start date and shall be reviewed and approved by DOD personnel (ATFP, Safety, Fire, Engineering, Shops, Bio Hazard & Environmental) prior to commencing any work. There is no storage capability on site, contractor to bring equipment with him for the installation.

10.6 Acceptance by the United States DoD does not relieve the Contractor of liability associated with performance as the contractor of Record. The Contractor shall be solely responsible for verification and validation of existing conditions, coordination of existing conditions in parallel with proposed requirements. The Contractor, in undertaking the work under this contract, is assumed to have surveyed the facility and to have taken into consideration all conditions which might affect the work. The Contractor is accountable for all aspects of the completed design and as-built drawings under all applicable Federal, State and local laws, regulations and base-specific standards.

11.0 SELECTION REQUIREMENTS:

11.1 The contractor shall fully read and meet all conditions and submit all required documentation as set forth in the buy package/ bid documents requirements and complete those requirements in full.

11.2 In addition, as a minimum, simultaneously with their bid the contractor shall also submit the following but not limited to separate detailed technical documents addressing the following items:

11.2.1 List of relevant and recent completed project references, showing that the contractor and any sub companies have mechanics with experience and are technically proficient in this specific type of required work. Said list shall provide as a minimum a point of contact person (POC) with POC’s full name, email, title, company & department name, phone number, address, email and a detail description on the work performed.

Compliance with this scope of work by all sub-contractors shall be the sole responsibility of the contractor.

11.2.2 A detailed capability statement must be provided showing that the contractor and any sub-contractors are competent to perform this required work. The following information as a minimum shall be provided in the company’s Capability Statement: Name and company branding, slogan (if any) summary description of the company; Core Capabilities; Description of major services offered; Federal Small Business Certifications; Contract Vehicles in which you participate (Federal and State); State Certifications document that records the individual and organizational achievements, competencies, and the business accreditations, letters of recommendations.

11.2.3 Provide detailed manufacturer’s cut sheets, shop submittal of the product(s), specifications and manufacturers information ensuring full compliance with the statement of work and bid documents requirements.

12.0 SITE VISIT:

12.1 A site visit during the procurement process is highly recommended and the bidder or contractor is obligated to verify any and all measurements and specification requirements during an on-site visit prior to providing his proposal for the work. The Contractor accepts responsibility for any issues that arise due to his lack of attendance at the site visit or choosing to not conduct the site visit prior to providing a proposal for the work.

12.2 The meeting time will be established by the Navy contracting officer. There will not be any other site visits except this one that the CO will coordinate.

12.3 The site visit meeting location for this specific project (if scheduled) shall commence at the south parking lot for building #5 (engineering) and the POC shall escort all bidders to building 355 for sign in and then to building 369 located in the NAVAIR (NAWCAD) test area just off taxiway #4, south of building 355 immediately past Fallen Shipmate drive on JB MDL, Lakehurst. Coordination into building 369 shall be thru Al Churderski(Navy).

13.0 SCHEDULE:

13.1 The contractor shall provide in writing a schedule of the work and shall receive acceptance from the DoD prior to mobilizing.

13.2 The contractor shall prepare a schedule of the work to be performed including start dates, durations and sequence of the work. Said schedule shall be submitted to the DOD in advance of starting any work and shall be reviewed and approved by the DOD prior to starting any work. The contractor shall provide an ongoing written weekly (Monday) updated schedule and submit this to the COR, Navy and the building manager.

14.0 POINTS OF CONTACT:

14.1 Technical POC: David Thesing

14.2 The Contractors’ supervisor or Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours from 800 to 1630 hours, to meet with Government personnel to discuss any problems encountered at the work site. Prior to start on this project the contractor will supply the DOD with a POC along with a 24 hour emergency contact person and phone number, said contact person(s) shall be available within sixty (30) minutes notice to respond to emergency.

15.0 RFI, CLARIFICATIONS and QUESTIONS:

All request for information, clarifications and questions are to be submitted in writing to the Navy contracting officer. All enquires may be submitted prior to the bid close date in accordance with the buy package stipulations. All enquires after this date will not be answered prior to the bid closing date.

16.0 SUBMITTALS- N/A

17.0 HOT ENTRY:

All hot work requires a hot work permit issued by the Joint Base Fire Prevention Office. The contractor shall contact the Joint Base Fire Prevention Office, to acquire a copy of Guidelines for issuing Hot Work Permits. Joint Base Fire Prevention Office: McGuire: (609) 754-2451; Dix: (609) 562-5484/6430; Lakehurst: (732) 323-7580/7878.

18.0 BASE ENTRY:

18.1 The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire, Dix, and Lakehurst for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s), full Social Security number etc. to obtain a pass for entry onto the base. The Pass and Registration building is at the Lakehurst Welcome Center which is located on Rt. 547, Lakehurst, NJ (building 620 at main gate area just off route 547).

18.2 All bidders or contractors entering the base shall obtained from the Security Pass &…