DRAFT-CDRL_A004_Software-Frimware_ChangeRequest.doc
DOC document 89 KB Posted
- Attached to
- RADIO FREQUENCY VECTOR SIGNAL GENERATOR (RFVSG) Federal contract opportunity
- Solicitation number
- N68335-18-R-0290
About this file
A004 Software/Firmware Change Request
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6833518R0290-0002.docx | DOCX document | |
| N6833518R0290-0001.docx | DOCX document | |
| DI-MISC-81807_SoftwareFirmwareChangeRequest_for_A004.pdf | ||
| Draft-CDRL_A002_Instrument_Calibration_Procedure.doc | DOC document | |
| DI-QCIC-80798C_for_A001.pdf | ||
| CDRLaddresslist-pb-20180208-1305.doc | DOC document | |
| DI-IPSC-81442A_SoftwareVersionDescription_for_A003.pdf | ||
| DI-TMSS-80527C_TechMan_for_T001.pdf | ||
| DI-RELI-80322_altICP_for_A002.pdf | ||
| N6833518R0290.docx | DOCX document | |
| DRAFT-CDRL_T001_TechMan_AMfmTestSource.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 0003, 1003, 2003, 3003, 4003 |
| A |
| TDP________ |
| TM _______ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| RF Vector Signal Generator (RFVSG) |
| N68335-18-R-0290 |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Software/Firmware Change Request |
| Software/Firmware Change Request |
II
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-81807 (See Block 16) |
| SOW Paragraph: 3.7 (See Block 16) |
| NAVAIRLKE 41L400B |
TOTAL PRICE
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
ASREQ
(See Block 16)
(See Block 16)
A
(See Block 16)
b. COPIES
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
Final
A (See BLK 16)
| N/A |
| ASREQ |
(See Block 16)
| Draft |
| Reg. |
| Repro |
| 16. REMARKS |
| Pat Brannick 41L400B |
| 1 |
| 1 |
| 0 |
Block 4/5: DI-MISC-81807 and SOW specification paragraph 3.7 shall be used as guidance and are provided for reference. Information items in DI-MISC-81807 that are not relevant to the procured unit do not need to be included in format.
Block 8: Software/Firmware Change Requests shall require government approval. Contractor shall provide a preliminary draft to the government for review, comment, and/or approval/disapproval as required after contract award. Government will provide the contractor with comments, approval or disapproval NLT 30 calendar days after of receipt of draft software/firmware change request. When a Draft Software/Firmware Change request receives comments the contractor shall provide a government approved final version with incorporated comments NLT 15 calendar days after receipt of comments on the draft Software/Firmware change requests.
Block 10: Frequency of Software/Firmware (CDRL A004 subtitle) shall be as required.
Block 12: Date of first submission shall be in accordance with (IAW) first contractor anticipated need for a firmware and/or software change.
Block 13: Date of subsequent submissions shall be as required.
Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.
| Corry Barnhouse 6.7.6.3S |
| 1 |
| 1 |
| 0 |
| Bruce Bluteau 4.1.L4 |
| 1 |
| 1 |
| 15. TOTAL |
| 3 |
| 3 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| P. Brannick, NAVAIRLKE 4.1.12.4 |
| 06/15/2017 |
DD Form 1423-1 JUN 90 Previous editions are obsolete.
Page 1 of 1 Pages
File details come from the government source that posted it.