Draft-CDRL_A002_Instrument_Calibration_Procedure.doc

DOC document 91 KB Posted

Attached to
RADIO FREQUENCY VECTOR SIGNAL GENERATOR (RFVSG) Federal contract opportunity
Solicitation number
N68335-18-R-0290
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

A002 Special Inspection Equipment Calibration

View the file

Other files for this federal contract opportunity

Other files attached to RADIO FREQUENCY VECTOR SIGNAL GENERATOR (RFVSG), newest first.
File Type Posted
N6833518R0290-0002.docx DOCX document
N6833518R0290-0001.docx DOCX document
DI-IPSC-81442A_SoftwareVersionDescription_for_A003.pdf PDF
DI-TMSS-80527C_TechMan_for_T001.pdf PDF
DI-RELI-80322_altICP_for_A002.pdf PDF
N6833518R0290.docx DOCX document
DI-QCIC-80798C_for_A001.pdf PDF
CDRLaddresslist-pb-20180208-1305.doc DOC document
DI-MISC-81807_SoftwareFirmwareChangeRequest_for_A004.pdf PDF
DRAFT-CDRL_A004_Software-Frimware_ChangeRequest.doc DOC document
DRAFT-CDRL_T001_TechMan_AMfmTestSource.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0003, 1003, 2003, 3003, 4003
A
TDP________
TM _______
OTHER QCIC
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
RF Vector Signal Generator (RFVSG)
N68335-18-R-0290
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
Special Inspection Equipment Calibration
Instrument Calibration Procedure

II

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

DI-RELI-80322 (See Block 16)
SOW Paragraph: 3.5 (See Block 16)
NAVAIRLKE 41L400B

TOTAL PRICE

7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT

Draft/Final (See Block 16)

(See Block 16)

A

(See Block 16)

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

A (See BLK 16)

N/A
(See Block 16)
Draft
Reg.
Repro
16. REMARKS
Pat Brannick 41L400B
1
1
0

Block 4/5: DI-MISC-81807 and SOW specification paragraph 3.5 shall be used as guidance and are provided for reference. Information items in DI-MISC-81807 that are not relevant to the procured unit do not need to be included in format.

Block 8: The Instrument Calibration Procedure (ICP) (CDRL A002 subtitle) for the RFVSG requires government approval. Contractor shall provide a preliminary draft to the government for review, comment, and approval no later than (NLT) 30 calendar days after contract award. Government will provide the contractor with comments NLT 15 calendar days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 calendar days prior to initial operating capability (IOC) of the first system to addressees in accordance with (IAW) CDRL A002 distribution (Block 14a). For the system IOC shall be defined as the Estimated Day of Delivery (EDD) provided by the contractor and included in the delivery order award.

Block 10: Frequency of submission for the Instrument Calibration procedure (CDRL A002 subtitle) shall be as above. Approved Final Version is last submittal.

Block 12: Date of first submission shall be in accordance with (IAW) Block 8, Block 13: Approved Final Version is last submittal.

Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided IAW CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.

Bruce Bluteau 41L400B
1
1
0
Corry Barnhouse 6.7.6.3S
1
1
0
15. TOTAL
3
3
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
P. Brannick, NAVAIRLKE 4.1.12.4
06/05/2017

DD Form 1423-1 JUN 90 Previous editions are obsolete.