CDRLs_Attachment_2.doc
DOC document 176 KB Posted
- Solicitation number
- N68335-15-R-0147
About this file
CDRLs A001-A003 Attachment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N68335-15-R-0147-0003.pdf | ||
| Questions_Week_Ending_27_November_2015.docx | DOCX document | |
| N68335-15-R-0147-2.docx | DOCX document | |
| Questions_Week_Ending_20_November.docx | DOCX document | |
| N68335-15-R-0147-1.docx | DOCX document | |
| Questions_Ending_Week_13_November.docx | DOCX document | |
| Attachment_P4_CLIN_Breakout_N68335-15-R-0147.xls | XLS spreadsheet | |
| N68335-15-R-0147.docx | DOCX document | |
| Attachment_P2_Workforce_Hour_Matrix.xls | XLS spreadsheet | |
| Attachment_P4_CLIN_Breakout_N68335-15-R-0147.xls | XLS spreadsheet | |
| QASP_N68335-15-R-0147_Attachment_1.doc | DOC document | |
| Attachment_P1_Workforce_Qualifications.xls | XLS spreadsheet | |
| Attachment_P3_Past_Performance_Questionnaire.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form approved
OMB No. 0704-0138
Public reporting for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction., searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of management and Budgets, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. 0
B. EXHIBIT
C. CATEGORY:
TDP TM OTHER
17.
PRICE GROUP
18. ESTIMATE TOTAL PRICE
D. SYSTEM/ITEM
48X CSS Support
E. CONTRACT / PR NO.
TBD
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Contractor’s Progress, Status and Management Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
5. CONTRACT REFERENCE
SOW Paragraph 5.0
6. REQUIRING OFFICE
NAVAIRLKE 4.8X.X
7. DD 250 REQ
LTR
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
Monthly
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
8. APP CODE
11. AS OF DATE
30 Days ARO
13. DATE OF SUBSEQUENT SUBMISSION
15th of every month
| a. ADDRESSEE |
| b. COPIES |
16. REMARKS
| Draft |
| Final |
| Reg |
| Repro |
| NAVAIRLKE 4.8.X.X |
| 1 |
| 15. TOTAL |
| 0 |
| 1 |
| 0 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD FORM 1423-1 JUN 90 |
| Previous editions are obsolete. |
| Page 1 of 3 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form approved
OMB No. 0704-0138
Public reporting for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction., searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of management and Budgets, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
K. CONTRACT LINE ITEM NO. 0
L. EXHIBIT
M. CATEGORY:
N. SYSTEM/ITEM
48X CSS Support
O. CONTRACT / PR NO.
P. CONTRACTOR
2. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Engineering and Technical Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
SOW Paragraph 5.0
6. REQUIRING OFFICE
NAVAIRLKE 4.8.X.X
7. DD 250 REQ
LTR
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
As Required
12. DATE OF FIRST SUBMISSION
As Required
15. DISTRIBUTION
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| a. ADDRESSEE |
| b. COPIES |
16. REMARKS
| Draft |
| Final |
| Reg |
| Repro |
| NAVAIRLKE 4.8.X.X |
| 1 |
| 15. TOTAL |
| 0 |
| 1 |
| 0 |
Q. PREPARED BY
R. DATE
S. APPROVED BY
T. DATE
| DD FORM 1423-1 JUN 90 |
| Previous editions are obsolete. |
| Page 2 of 3 Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form approved
OMB No. 0704-0138
Public reporting for this collection of information is estimated to average 110 hours per response, including the time for reviewing instruction., searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of management and Budgets, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
U. CONTRACT LINE ITEM NO. 0
V. EXHIBIT
W. CATEGORY:
X. SYSTEM/ITEM
48X CSS Support s
Y. CONTRACT / PR NO.
Z. CONTRACTOR
3. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Trip Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711
5. CONTRACT REFERENCE
SOW Paragraph 5.0
6. REQUIRING OFFICE
NAVAIRLKE 4.8.X.X
7. DD 250 REQ
LTR
9. DIST STATEMENT REQUIRED
TBD
10. FREQUENCY
As Required
12. DATE OF FIRST SUBMISSION
As required
16. DISTRIBUTION
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
| a. ADDRESSEE |
| b. COPIES |
16. REMARKS
| Draft |
| Final |
| Reg |
| Repro |
| NAVAIRLKE 4.8.X.X |
| 1 |
| 15. TOTAL |
| 0 |
| 1 |
| 0 |
AA. PREPARED BY
AB. DATE
AC. APPROVED BY
AD. DATE
| DD FORM 1423-1 JUN 90 |
| Previous editions are obsolete. |
| Page 3 of 3 Pages |
Contractor format acceptable.
The report shall include both a task progress report and a cumulative summary of man hours by Labor Category and funds expended, remaining, travel material, and other direct charges, cumulatively
This report shall be organized relative to the Technical Instructions.
Trip reports shall be submitted within 10 working days of the conclusion of each trip.
File details come from the government source that posted it. Updated .