This document is a Specifications for Work to be Accomplished for USS Oscar Austin (DDG 79), specification number NAPL-007-27, issued by the Department of the Navy, FDRMC Naples, and includes all changes through October 8, 2026.

The specification outlines multiple work items for ship maintenance and repairs on the Arleigh Burke-class destroyer, which is 509 feet in length with a full load displacement of 9,211 long tons. Category I includes 27 standard FY-27 items applicable to the job order covering general criteria, environmental compliance, toxic substance control, quality management, confined space entry, fire protection, asbestos handling, government property control, technical data provision, cable procedures, safety planning, facility maintenance, compartment closeout, and various operational and testing requirements. Category II identifies three items that may be invoked during execution: insulation and lagging, cleaning and painting requirements (updated June 6, 2025), and piping system testing. The work items requiring contractor performance include: crane and rigging services to relocate two AFFF concentrate pumps weighing approximately 1,000 pounds; installation of a seawater pump discharge check valve in Auxiliary Machinery Room One; lagging and insulation work across 16 compartments totaling approximately 500 linear feet of piping and 400 square feet of bulkhead insulation; hydrostatic testing of three steam jacketed kettles in the galley; pumping services for removal and disposal of up to 10,000 gallons of hazardous materials; and rigging, crane, and forklift services to support gas turbine module changeout, including 60 crane lifts at 20,000 pounds maximum and 25 forklift lifts at 15,000 pounds maximum, with scaffolding installation and 240 man-hours for rigging. All work requires compartment closeout inspections, work completion certifications, and compliance with NAVSEA standard items and referenced technical manuals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

FDRMC NAPLES

FPO, AE

USS OSCAR AUSTIN (DDG 79)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: NAPL-007-27

SHIP CHARACTERISTICS

FEET INCHES 509 0LENGTH OVERALL

FEET INCHES 59 0MAX. BEAM AT DESIGN WATERLINE

FEET INCHESEXTREME BEAM INCLUDING APPENDAGES

FEET INCHES 21 9DRAFT (MAX. NAVIGABLE) (FWD.)

FEET INCHES 22 2DRAFT (MAX. NAVIGABLE) (AFT.)

LONG TON 7,018LIGHT DISPLACEMENT

9,211 LONG TONFULL LOAD DISPLACEMENT

INCHESFEET 150 1HEIGHT OF MAST ABOVE DESIGN WATERLINE

0 0

INCLUDES ALL CHANGES THROUGH 10/8/2026

INDEX

SHIP: USS OSCAR AUSTIN (DDG 79) NAPL-007-27

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-27 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-001 General Criteria; accomplish 10/01/2024 Original

009-002 Environmental Compliance Report for Material Usage; accomplish 10/01/2024 Original

009-003 Toxic and Hazardous Substance; control 10/01/2024 Original

009-004 Quality Management System; provide 10/01/2024 Original

009-005 Temporary Access; accomplish 11/18/2024 CH-1

009-006 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

10/01/2024 Original

009-007 Confined Space Entry, and Certification; accomplish 10/01/2024 Original

009-008 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2024 Original

009-010 Asbestos-Containing Material (ACM); control 10/01/2024 Original

009-018 Mine Warfare Ships Magnetic Material; control 10/01/2024 Original

009-019 Provisioning Technical Documentation (PTD); provide 10/01/2024 Original

009-020 Government Property; control 10/01/2024 Original

009-021 Alteration Verification, Logistic and Technical Data; provide 10/01/2024 Original

009-023 Interference; remove and install 11/18/2024 CH-1

009-024 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 10/01/2024 Original

009-034 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2024 Original

009-039 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

10/01/2024 Original

009-040 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

10/01/2024 Original

009-060 Schedule and Associated Report for CNO Availability; provide and manage 10/01/2024 Original

009-061 Shipboard Use of Fluorocarbons; control 10/01/2024 Original

009-067 Integrated Total Ship Testing; manage 10/01/2024 Original

009-068 Availability Work Certification (AWC) Data for Chief of Naval Operations (CNO)

Availabilities; provide

10/01/2024 Original

009-069 Heavy Weather/Mooring Plan; provide 10/01/2024 Original

009-070 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

10/01/2024 Original

009-072 Physical Security at a Private Contractor Facility; accomplish 10/01/2024 Original

009-073 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2024 Original

009-074 Occupational, Safety and Health Plan; accomplish 10/01/2024 Original

009-080 Ship Facility; maintain 10/01/2024 Original

009-081 Compartment Closeout; accomplish 10/01/2024 Original

009-082 Installation of Equal Component Vice Specified Component; report 10/01/2024 Original

009-084 Threaded Fastener Requirement; accomplish 10/01/2024 Original

009-088 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify

10/01/2024 Original

009-093 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

10/01/2024 Original

Page 1 of 4 EXECUTING WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-099 Ship Departure Report; provide 10/01/2024 Original

009-100 Ship's Stability; maintain 10/01/2024 Original

009-101 Ship Transit and Berthing; accomplish 10/01/2024 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2024 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2024 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 10/01/2024 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2024 Original

009-117 Combat Systems, Light-Off Suport; provide 10/01/2024 Original

009-118 CG Deck Loading; accomplish 10/01/2024 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 10/01/2024 Original

009-122 Temporary Padeye; install and remove 11/18/2024 CH-1

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 11/18/2024 CH-1

009-126 Schedule Model Review (SMR); accomplish 10/01/2024 Original

Page 2 of 4 EXECUTING WORK

CATEGORY II. FY-27 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-011 Insulation and Lagging; accomplish 10/01/2024 Original

009-032 Cleaning and Painting Requirements; accomplish 06/06/2025 CH-2

009-071 Piping System; test 10/01/2024 Original

Page 3 of 4 EXECUTING WORK

ITEM NO. TITLE

Crane and Rigging Service; provide100-11-001

Sea Water Service Check Valve; install256-61-001

Lagging; accomplish635-11-001

Steam Jacketed Kettle Hydrostatic Test; accomplish651-11-001

Pumping Services; provide992-31-001

Rigging, Crane and Forklift Service for Gas Turbine Module Changeout;

provide

993-11-001

Page 4 of 4 EXECUTING WORK

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 100-11-001

COAR: 26 PCN: ER04-4806

CMP: NONE

PLANNER: KRIEGER, DANIEL

LAFONTAINE,

CHRISTOPHER

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 2 ITEM NO: 100-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Crane and Rigging Service; provide

1.2 Location of Work:

1.2.1 KTR Facility Pier/Flight Deck/Aft AFFF Station (1-300-1-Q)

1.3 Identification:

1.3.1 Quantity (One EA), Number One and 2 Aqueous Film Forming Foam (AFFF) Concentrate Pump, 70 GPM, 170 PSI, 680 RPM, Mfr. Dwg.: E-4540 Piece 48, Mfr. ID: E-4540 Piece 48 X2NFM-TB, Mfr.: Dover Fluid Management Inc., APL: 016200712

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

3. REQUIREMENTS:

(V)(G) "WEIGHT HANDLING EQUIPMENT INSPECTION"

3.1 Provide crane and rigging services. Inspect crane and all rigging gear being utilized and ensure they are certified for use. Crane and all rigging equipment shall be within calibration for dates work is to be accomplished.

3.1.1 Rig out and dispose of existing pump identified in 1.3.1 and located in 1.2. Provide rigging services to relocate new pump identified in 1.3.1 from the flight deck to 1.2.1, the Aft AFFF Station (1-300-1-Q). The existing and new pumps weigh approximately 1,000 pounds.

3.1.2 Crane off old equipment listed in 1.3, as designated by the

SUPERVISOR.

(V)(G) "COMPARTMENT CLOSEOUT"

3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 Ship's Force will be securing AFF system prior to work commencing, disconnecting existing pump and installing new pump.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

SHIP: USS OSCAR AUSTIN (DDG 79)

SSP: NAPL-007-27 2 of 2 ITEM NO: 100-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 256-61-001

COAR: 26 PCN: EA01-6914

CMP: NONE

PLANNER: KRIEGER, DANIEL

LAFONTAINE,

CHRISTOPHER

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 2 ITEM NO: 256-61-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Sea Water Service Check Valve; install

1.2 Location of Work:

1.2.1 Auxiliary Machinery Room One (4-126-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Number One Seawater Pump Discharge Check Valve, 8 Inch IPS, 250 PSI, MFR ID: 803-1385637-082, APL: 882037507

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

2.2 256-6567450 Rev N, Seawater Cooling System Diagram

2.3 802-5959353 Rev BT, MIL-STD-777D Modified for DDG-51 Class, Schedule of Piping, Valves, Fittings, and Associated Piping Components

2.4 S9086-RK-STM-010/CH-505 Rev 6, Piping Systems

3. REQUIREMENTS:

3.1 Remove existing and install new each check valve listed in 1.3, provided in 5.1, and located in 1.2, using 2.2 for guidance. The valve weighs approximately 600 pounds. Retain all hardware for reuse. Upon removal of existing hardware immediately inspect, identify and report any damage or deterioration to the SUPERVISOR.

3.1.1 Restore each piping flange mating surface exposed by

disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tools. Maintain phonographic finish on each flange that has it.

3.1.2 Chase and tap each exposed threaded area.

3.1.3 Each new material must conform to 2.3, including Category and Group D-1.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish an operational test of each new and disturbed seawater piping at normal system operating pressure using normal system fluid, using Paragraph 505-11 of 2.4 for guidance. Allowable leakage: None.

(V)(G) "COMPARTMENT CLOSEOUT"

3.3 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure

SSP: NAPL-007-27 2 of 2 ITEM NO: 256-61-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 Receive the check valve listed in 5.1 from Ship’s Force via the

SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA Check Valve N/A 4820-00- 878-4325

5.2 PUSH MATERIAL:

1. None.

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 635-11-001

COAR: 26 PCN: See Attachment A

CMP: NONE

PLANNER: KRIEGER, DANIEL

LAFONTAINE,

CHRISTOPHER

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 4 ITEM NO: 635-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Lagging; accomplish

1.2 Location of Work:

1.2.1 Special Clothing Store Room, (4-110-3-A)

1.2.2 Access Trunk, (3-116-1-T)

1.2.3 Communication Center, (2-126-1-C)

1.2.4 Interior Communication and Gyroscope Room, (3-300-0-C)

1.2.5 Fan-Room Structure, (01-300-2-Q)

1.2.6 CIWS Weapons and Aviation Ordnance, (01-300-0-Q)

1.2.7 Access Trunk, (1-338-4-T)

1.2.8 Engine Room Number 2, (4-254-0-E)

1.2.9 Central Control Station and Damage Control, (1-268-0-C)

1.2.10 General Workshop, (2-200-2-Q)

1.2.11 Supply Department Storeroom Number 3, (4-370-5-A)

1.2.12 State Room, (02-145-2-L)

1.2.13 State Room, (02-126-2-L)

1.2.14 Commanding Officer Sea Cabin, (4-158-1-L)

1.2.15 Crew Living Space Number 7, (3-350-2-L)

1.2.16 Bulk Storeroom, (0.5-42-2-A)

1.3 Identification:

1.3.1 Quantity (8 LF), Chill Water Piping Insulation, located in 1.2.1.

1.3.2 Quantity (8 LF), Hot Water Piping Insulation, located in 1.2.1.

1.3.3 Quantity (16 SQFT), Bulkhead Insulation, located 1.2.2

1.3.4 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.3

1.3.5 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.4

1.3.6 Quantity (1 SQFT), Bulkhead Insulation, located 1.2.5

1.3.7 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.6

1.3.8 Quantity (3 SQFT), Bulkhead Insulation, located 1.2.7

1.3.9 Quantity (2 LF), Sea Water Piping Insulation, located in 1.2.8

SSP: NAPL-007-27 2 of 4 ITEM NO: 635-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1.3.10 Quantity (3 LF), Sea Water Piping Insulation, located in 1.2.8

1.3.11 Quantity (3 LF), Fuel Drain Piping Insulation, located in 1.2.8

1.3.12 Quantity (3 LF), Cooling Water Piping Insulation, located in 1.2.8

1.3.13 Quantity (2 LF), Sea Water Piping Insulation, located in 1.2.8

1.3.14 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.8

1.3.15 Quantity (6 LF), Sea Water Piping Insulation, located in 1.2.8

1.3.16 Quantity (6 SQFT), Bulkhead Insulation, located 1.2.9

1.3.17 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.10

1.3.18 Quantity (338 SQFT), Bulkhead Insulation, located 1.2.11

1.3.19 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.12

1.3.20 Quantity (2 LF), 8 Inch, Sea Water Piping Insulation, located in 1.2.13

1.3.21 Quantity (7 LF), One Inch, Sea Water Piping Insulation, located in 1.2.14

1.3.22 Quantity (20 SQFT), Ventilation Insulation, located in 1.2.15

1.3.23 Quantity (2 SQFT), Bulkhead Insulation, located 1.2.16

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

2.2 804-5959214 Rev C, Piping Insulation - Installation Details

2.3 508-6218533 Rev V, Piping & Machinery Insulation Schedule

2.4 MIL-STD-769K CHG 1, Insulation Requirements for U.S. Naval Vessels

3. REQUIREMENTS:

3.1 Record and document any compartment designations, equipment labeling, and system markings affected by the accomplishment of this work specification.

3.1.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report in English, listing the results of

3.1 to the SUPERVISOR.

3.2 Remove existing and install new insulation and lagging material for the equipment listed in 1.3, located in 1.2, using 2.2 through 2.4 as guidance.

3.3 Accomplish the requirements of 009-011 of 2.1 in locations listed in

1.2 for the installation of new insulation and lagging removed in 3.2, using 2.2 through 2.4 as guidance.

(V)(G) "COMPARTMENT CLOSEOUT"

3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding

SSP: NAPL-007-27 3 of 4 ITEM NO: 635-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 Ships Force will accomplish the painting requirement for 3.2 of 009- 011, for new insulation, lagging, and reusable covers to match surrounding areas.

4.2 Ship's Force will need to secure systems that produce condensation on surfaces to be insulated or lagged. Contractor is to notify and coordinate with Ship's Force to ensure system has sufficient time to mitigate condensation.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: NAPL-007-27 4 of 4 ITEM NO: 635-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

PCN Identification

SS02-4454 DEGGRADED LAGGING

SS02-4474 DEGRADED LAGGING

EM04-4751 DEGRADED LAGGING

ER01-3803 LAGGING JOB

EA01-6820 LAGGING REQUEST

EM02-3862 LAGGING REQUIRED

EM02-3762 STO LAGGING.

EM02-3860 LAGGING REQUIRED

SS02-4475 DEGRADED LAGGING

SS02-4545 MISSING LAGGING

CG03-2330 LAGGING HOLE ON OVERHEAD

CG04-3910 LAGGING MT 22 CEILING

CA02-1365 LAGGING IN BERTHING 2 TRUNK

CM02-1194 DEGRADED LAGGING

SS03-0517 DEGRADED LAGGING

SS01-0260 DEGRADED LAGGING

CE01-2974 DAMAGED LAGGING

EM02-3861 LAGGING REQUIRED

EM02-3759 STO LAGGING.

CC01-4219 DAMAGE LAGGING

EM02-3859 LAGGING REQUIRED

EM02-3863 LAGGING REQUIRED

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 651-11-001

COAR: 26 PCN: EE02-L037

EE02-L038

EE02-L036

CMP: NONE

PLANNER: KRIEGER, DANIEL

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 2 ITEM NO: 651-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Steam Jacketed Kettle Hydrostatic Test; accomplish

1.2 Location of Work:

1.2.1 Crew/Chief Petty Officer Galley (1-191-0-Q)

1.3 Identification:

1.3.1 Quantity (One EA), Steam Jacketed Kettle, 10 Gallon, Mfr:

Dover, Model TDB-40, APL 43A040063, Item Number 245, Sheet 5 of 2.3

1.3.2 Quantity (One EA), Steam Jacketed Kettle, 20 Gallon, Mfr:

Dover Steam, Model EE-20, APL 43A010075, Item Number 215, Sheet 5 of 2.3

1.3.3 Quantity (One EA), Steam Jacketed Kettle, 40 Gallon, Mfr:

Dover, Model EE-40, APL 430470067, Item Number 214, Sheet 5 of 2.3

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

2.2 Maintenance Requirement Card, MRC Control Number: 95 G5Z6 Y (Hydrostatically Test Steam Jacket of Electrically Operated Steam Kettle)

2.3 651-8436197 Rev A, ShipAlt DDG-51-71605 DDGM, Advanced Galley Instl Crew/CPO Arr Mods & Ml

2.4 65111-3-009 Rev A/1, Steam Kettle Operational Test

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2, using 2.3 and 2.4 for guidance.

(V)(G) "VISUAL INSPECTION"

3.1.1 Visually inspect each Steam Jacket Kettle for bulging or cracks in accordance with 2.2. Accept/Reject Criteria: No bulging or cracks.

(V)(G) "HYDROSTATIC TEST"

3.1.2 Accomplish the requirements of 009-071 of 2.1 for the

shipboard hydrostatic test of each steam jacket kettle listed in 1.3, in each location listed in 1.2.

3.1.2.1 Hydrostatic test each steam kettle using clean, fresh water at 45 PSIG for a minimum of 30 minutes. Allowable leakage:

None.

3.1.3 Install a metal tag with test pressure and date accomplished in accordance with Paragraph g. of 2.2.

SSP: NAPL-007-27 2 of 2 ITEM NO: 651-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.1.4 Submit one legible copy, in approved transferrable media, of a report in English, listing the identification tag test data for each steam kettle tested to the SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.2 Accomplish an operational test of each steam kettle tested in 3.1 in accordance with 2.4. Allowable leakage: None.

(V)(G) "COMPARTMENT CLOSEOUT"

3.3 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 Ships force will supply the hazmat for step "l" of 2.2. (MIL-S-

45180, TYII)

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 992-31-001

COAR: 26 PCN: SERV-L272

CMP: NONE

PLANNER: KRIEGER, DANIEL

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 1 ITEM NO: 992-31-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Pumping Services; provide

1.2 Location of Work:

1.2.1 Auxiliary Room Number One (4-126-0-E)

1.2.2 A/C Machinery and Pump Room (5-300-01-E)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

2.2 S9086-T8-STM-010 /CH-593 Rev 8, Pollution Control

3. REQUIREMENTS:

3.1 Provide pumping services to spaces listed in 1.2, for removal, storage, and disposal of up to 10,000 gallons of HAZMAT liquids to include but not limited to fresh water, salt water, bilge water, oil and oily waste and AFFF, in accordance with 2.2.

3.1.1 Remove pumping equipment upon completion of work.

(V)(G) "COMPARTMENT CLOSEOUT"

3.2 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS OSCAR AUSTIN (DDG 79) ITEM NO: 993-11-001

COAR: 26 PCN: SERV-L270

SERV-L271

CMP: NONE

PLANNER: KRIEGER, DANIEL

ROSSEN, ALEXA

STAPLES,

MICHAEL.FDRMC

SSP: NAPL-007-27 1 of 2 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rigging, Crane and Forklift Service for Gas Turbine Module Changeout; provide

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY27 CH-2)

3. REQUIREMENTS:

(V)(G) "WEIGHT HANDLING EQUIPMENT INSPECTION"

3.1 Provide crane and each material handling service, to include a man basket for personnel and a material basket, forklift, transportation, riggers, and an operator during the entire availability for loading, transporting, and unloading material and equipment in support of a Gas Turbine Module Changeout. Inspect all weight handling equipment and rigging gear being utilized and ensure they are certified for use. All weight handling and rigging equipment shall be within calibration for dates work is to be accomplished.

3.1.1 Accomplish a total of 60 crane lifts at 20,000 pound maximum per lift.

3.1.1.1 Crane must be capable of handling material from the top of the mast to the furthest outboard point of the ship.

3.1.1.2 Man basket must be minimum 3x3 SQFT.

3.1.1.3 Material basket must be able to safely hold 1000lbs.

3.1.2 Accomplish a total of 25 forklift lifts at 15,000 pound maximum per lift.

3.1.3 Provide 240 man-hours for rigging of ships force material.

3.1.4 Provide a lay down area and enclosed space for equipment and material. Enclosed space shall be no less than 400 SQFT and be at a height of 9 feet.

3.2 Install and maintain each steel tube and clamp type scaffolding in the location listed in 1.2.1, with sufficient level and projection to safely reach and accomplish each required task in support of marine gas turbine change out.

SSP: NAPL-007-27 2 of 2 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.1 Planking must be secured (cleated) to preclude shifting.

3.2.2 Scaffolding must be capable of sustaining a load of 1,200 pounds at any point or level of the scaffolding.

3.2.3 End of each tubing resting on structure and transmitting weight of the scaffolding must terminate on framing immediately below and have a 10.2 pound sole plate to preclude damage to structure.

3.2.4 Install safety railing around perimeter of each scaffolding platform.

3.2.5 Erect each shroud/curtain to contain each environmental pollutant generated during work. Each shroud/curtain must envelope entire temporary staging.

3.3 Remove scaffolding upon completion of work.

(V)(G) "COMPARTMENT CLOSEOUT"

3.4 Accomplish a joint inspection with the SUPERVISOR and the Commanding Officer's designated representative upon completion, inspection, and acceptance, by the contractor, of work within each compartment. Ensure Attachment A, Work Completion Certification, is completed in accordance with 009 004 of 2.1.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.