RFQ_N6817119Q0056-0006.pdf

PDF 447 KB Posted

Attached to
Playground Equipment and Assembly Federal contract opportunity
Solicitation number
N6817119Q0056
Issued by
Department of the Navy United States Naval Forces Europe Naval Forces Africa

About this file

RFQ_N6817119Q0056-0006.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Playground Equipment and Assembly, newest first.
File Type Posted
RFQ_N6817119Q0056-0005.pdf PDF
RFQ_N6817119Q0056-0004.pdf PDF
RFQ_N6817119Q0056-0003.pdf PDF
ATTACHMENT_2-QUESTIONS_ANSWERS(b).pdf PDF
N6817119Q0067-0003.pdf PDF
RFQ_N6817119Q0056-0002.pdf PDF
RFQ_N6817119Q0056-0001.pdf PDF
RFQ_N6817119Q0056.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6258819RC046Z0

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Subject RFQ is hereby amended as follow s:

1. Revise the QUESTIONS & ANSWERS Section to amend the answ er to Question #1 and add Question #8;

2. Change the Product Specif ications and Assembly & Installation specif ications to indicate that ASTM or EN safety standards, w hichever is more stringent is required, and to provide verif ication that the equipment complies w ith the more stringent standard;

3. The Required Response Date and Time is September 19, 2019 at 01:00 PM (Naples Italy Local Time);

4. The Date for Final Questions is September 13, 2019 at 04:00 PM (Naples Italy Local Time).

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6817119Q0056

X 9B. DATED (SEE ITEM 11)

11-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2019

CODE

NAVSUP FLC SIGONELLA NAPLES OFFICE SHORE

PSC 817 BOX 50

FPO AE 09622

N68171 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6817119Q0056

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

QUESTIONS & ANSWERS

1. Q. Since we are talking about a U.S. Military Installation, doesn't the equipment - according to military standards - has to be manufactured according to U.S. IPEMA standards (CPSC consumer product safety commission/ASTM American society for testing and materials) and certified by TÜV AMERICA, by any Chance?

A. Modification 0006 changes the language for safety standard requirements to require ASTM Standards or

EN Standards, whichever is more stringent. (See PRODUCT SPECIFICATION and ASSEMBLY &

INSTALLATION sections)

2. Q. Is there a tolerance level in height of structures?

A. +/-10%. PRODUCT SPECIFICATION has been amended to indicate the tolerance.

3. Q. What site preparation will be needed?

A. Play Area #21 requires no site preparation. Play Area #18 will require the removal of old/damaged top

(finish) layer of 13 mm thickness. (See ASSEMBLY & INSTALLATION section)

4. Q. Safety and security on the job site

A. Safety and security will be in accordance with Base rules. The contractor is responsible for maintaining a safe and secure work area.

5. Q. Calculations for the Rubber Surfacing (CLIN 0003) are higher than being requested in the RFQ. Will that be revised?

A. Yes. The play areas were re-measured. Play Area #18 is measured at 150 sq.m.; Play Area #21 is measured at 205 sq.m.; Total area to be covered is 355 sq.m. The quantity of CLIN 0003 has been revised to reflect the correct total measurement of 355 sq.m.

6. Q. Is a specific color required for the Rubber surfacing?

A. It is requested that color options be included in the quote. (INSTRUCTION TO OFFERORS –

ADDENDUM paragraph (A)(2)(c))

7. Q. Will electricity hook-up be provided?

A. Contractor will need to provide its own portable generator for electricity needs of its equipment/tools.

8. Q. We’re a bit confused because you mix ASTM Standards 1487 with European EN1176. The technical dimensions such as head entrapments, distances etc. are not identical…..Also you can not combine the EN1176 with the American ADA.

A. Modification 0006 changes the language for safety standard requirements to require ASTM

Standards or EN Standards, whichever is more stringent. (See PRODUCT SPECIFICATION and ASSEMBLY & INSTALLATION sections)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Sep-2019 01:00 PM to 19-Sep-2019 01:00 PM.

The following have been modified:

52.212-1 ADDENDUM

INSTRUCTIONS TO OFFERORS - ADDENDUM

Quotes shall be submitted electronically to the Contract Specialist, Mr. Arthur Conkwright and Sebastiano Paciello by the date and time indicated on page 1 block 8 of this document, at the following email address:

arthur.conkwright@eu.navy.mil and sebastiano.paciello.it@eu.navy.mil

Electronic mail sent to this address shall clearly reference the solicitation number, N6817119Q0056, in the Subject

Line. Final Questions shall be submitted not later than 1600 hours (Naples, Italy Local Time) Thursday

September 13, 2019 at arthur.conkwright@eu.navy.mil and sebastiano.paciello.it@eu.navy.mi. l Questions submitted after this date and time may not be answered. Other methods of submitting questions are not authorized and will not be acknowledged or addressed.

Quote Delivery: Quotes shall be delivered by email no later than September 19, 2019 at 01:00 PM (Naples, Italy Local Time) to Arthur Conkwright at arthur.conkwright@eu.navy.mil AND Sebastiano Piciello at sebastiano.piciello.it@eu.navy.mil. Quoters are advised that delays can be experienced with the

Government’s email system. Additionally, the email system capacity for each email is 10 MB. Emails greater than 10 MB will not be delivered and will not be considered. Therefore, quotes exceeding the size limit must be sent via multiple emails. Zip Files will not be accepted.

Quoter must comply with the instructions in the provision at FAR 52.212-1 and this Addendum for the format and content of the quotes; quotes that do not comply may be considered unacceptable and may render the Quoter ineligible for award.

Important: The Quoter shall be registered in the System for Award Management (SAM) database prior to award of the contract. SAM website at https://www.sam.gov/SAM/.

Site Visit: Interested companies are invited to perform a walk-through/site visit of the subject project site with the Housing Technical Representative. Attendance to the Walk-through/Site Visit is not a mandatory requirement to be able to submit a quote. However, it is highly recommended to attend the walk-through/site visit in order to inspect the work in place and to visually inspect the amount of work to be accomplished.

Description of work may not reflect all conditions (and stated quantities and/or dimensions) that may affect the work.

The Site Visit will be held on 23 July 2019 at 10:00AM at the following location:

NSA, Support Site – Family Housing Playgrounds #18 and #21

Via Boscariello, 81031 Gricignano d’Aversa (CE) mailto:arthur.conkwright@eu.navy.mil mailto:sebastiano.paciello.it@eu.navy.mil mailto:arthur.conkwright@eu.navy.mil mailto:sebastiano.paciello.it@eu.navy.mi mailto:arthur.conkwright@eu.navy.mil mailto:sebastiano.piciello.it@eu.navy.mil https://www.sam.gov/SAM/

The attendance is limited to two persons for each company. Please submit the company name, name of the attendees, and any other questions strictly regarding the site visit to:

Mr. Gianni Lanzillo

Gianni.Lanzillo.IT@eu.navy.mil

Tel: +39-081.8114440/4655

Attendees shall arrive to the main gate of NSA Support Site to meet Mr. Lanzillo and/or his representative no later 09:45 AM.

QUOTATIONS

(A) A quotation in English. Any quote received in other than English will be rejected. Quotes shall consist of the following:

(1) Standard Form 1449, Quoter shall submit a signed copy of the SF-1449 Solicitation/Contract/Order for

Commercial Items, with blocks 17a, and 30a through 30c completed. All solicitation amendments must be acknowledged or signed and returned with the quote.

(2) Technical Capability – The following shall be submitted to demonstrate technical capability:

(a) This is a BRAND-NAME or EQUAL requirement. The Brand Name of the items and their salient characteristics are identified in the PRODUCT SPECIFICATIONS. Please follow the instructions provided in the provision at

FAR 52.211-6 to demonstrate the technical capability of the items included in your quote.

(b) Existing product literature for the items proposed.

(c) Color options for the Rubber Surfacing (CLIN 0003)

(d) Verification that the equipment complies with ASTM or EN standards, whichever is more stringent.

(3) Pricing

(a) SF1449 Contract Line Items (CLINs) pricing scheduled entitled: Supplies/Services - Quoters shall submit prices for all CLINs. CLINs may be priced in either U.S. Dollar or Euro.

The quoter agrees to hold these prices firm for 45 calendar days from the date specified for receipt of quotes.

(b) Manufacturers warranty information and contractor installation warranty information shall be included with the pricing submittal.

(4) RFQ Provisions

(a) Quoter shall fill in the following provisions or confirm that the following provisions have been completed on the

SAM website at https://www.sam.gov/SAM/.

(i) FAR 52.204-17 Ownership or Control of Offeror

(ii) FAR 52.204-20 Predecessor of Offeror

(iii) FAR 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX

LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

mailto:Gianni.Lanzillo.IT@eu.navy.mil https://www.sam.gov/SAM/

(iv) FAR 52.212-3 Alternate I “Offeror Representations and Certifications – Commercial Items”

(b) Quoter shall complete and return the following provisions:

(i) FAR 52.225-18 Place of Manufacture (AUG 2018)

(ii) DFARS 252.229-7001 – Tax Relief (SEPT 2014)

(iii) FAR 52.204-24 – Representation Regarding Certain Telecommunications and Video Surveillance

Services or Equipment

(c) Local Certifications and Declarations: Quoter shall submit a copy of the following Certifications and

Declarations:

(i) Latest valid Company Certification of Employees’ Regular Contribution (Documento Unico Regolarita

Contributiva (DURC)) demonstrating payment of regular tax contribution;

(ii) “Documentation Antimafia” as per D Lgs 159/2011

(iii) Company certificate from the Chamber of Commerce (C.C.I.A.A.) demonstsrating its registration to

“Registro delle Imprese”.

Failure to provide this information or failure to complete them on the SAM website will result in the Quoter’s quotation being determined unacceptable and it will not be considered for award.

ASSEMBLY AND INSTALLATION

Line Item 0004 – Assembly and Installation

The Contractor shall furnish all equipment, power-generation, materials, labor, supervision and effort necessary for the assembly and installation of the playground equipment and surfacing material. All man-power employed by the

Contractor shall consist of qualified operators and competent workmen who are proficient in performing services required by this contract, using modern tools, methods, and techniques. Equipment, workmanship and testing shall be in strict accordance with the required and advisory provisions of the American Society for Testing and Materials

(ASTM) technical performance standards and of the applicable Italian Safety Law “Degreto Ministeriale (D.M.) No.

37/08”.

Play Area #18 will require the removal of old/damaged top (finish) layer of surfacing material having a thickness of approximately 13 mm. Play Area # 21 requires no additional site preparation.

Upon completion the Contractor shall thoroughly inspect and perform adjustments as required to all equipment parts for misalignment, loose joints, and signs of malfunctioning, improper adjustment, defective threads, or other defects that may affect serviceability of said equipment.

The Contractor shall release at completion of work an installer’s declaration of conformity that each provided and installed product has been installed in strict accordance with the required and advisory provisions as per the

European Safety standards/norms and provided products complies with applicable ASTM and IMQ/ISO regulations and also with the following:

Playground equipment certification in accordance with ASTM F1487 Standards or UNI-EN1176-1/A2:2003, EN1176-2/A1:2003, EN1176-6/A1:2002, whichever is more stringent, ASTM F1292 Standard Specification for Impact Attenuation of Surfact Systems Under and Around

Playground Equipment, or Impact Absorbing Surfacing Rubber Flooring certification UNI-EN1177 (1997), whichever is more stringent, and

Wooden products certification of Certified Management system ICILA, ISO 9001 and Environmental system certified DNV, ISO 14001.

PRODUCT SPECIFICATIONS

Line Item 0001:

A Colorful playground equipment for children aged 3 to 6, structure shall be made entirely of natural larch PEFC certified solid wood protected by a natural paintwork, free of toxic and polluting impregnating agents. The supporting structure made up of uprights cut out of the heart (in order to reduce the splits) in minimum 100 mm diameter cylindrical larch wood, anchored to the ground by means of hot-galvanized steel tubular brackets, fixed to the uprights by bolts.

Composed as minimum out of the following components (or similar); at least of one main tower with two small towers (of min. high of 550 cm), joined to the main and between each other by means of tunnels made of polyethylene minimum 120 cm long and with circular opening of min. 40 cm diameter, and bridges having a top walkway in solid larch wood, fixed to a galvanized steel frame and covered in colored polyester. A high play tower connected to a lower covered platform, with a first tower, out of three platforms one above each other. Beneath with a play floor where children can hide. The lowest platform shall be equipped with an abacus with HDPE polyethylene discs. The upper platform shall be reached via an easy type of staircase with metal railings, a climbing arch and a rock wall with plastic climbing grips. The highest platform approx. height of 200 cm* and can be ascended via an incorporated spiral staircase (or similar). The upper platform shall be equipped with a curved type of metal balustrade with plastic steering wheel, a telescope and a spinning game. From the upper platform it can be slid down via a metal spiral fireman’s pole. The whole shall be covered with a two-fold roof from rounded colorful HDPE polyethylene panels. One can go to the other playhouse by using the HDPE polyethylene crawl tunnel. The upper platform has an approx. height of 100 cm* and can be left via a plastic slide. The playhouse should be able to access via an easy staircase with metal handrails. The round wooden larch poles have a minimum diameter of 10 cm and are fixed into or onto the ground using metal base supports. Bridges complete with side protection slats in min.18 mm thick of colored polyethylene.

* +/-10%

Sample Playground Equipment Combo-set 3 Towers (Europlay or equal manufacturer):

Line Item 0002:

One double swing suitable for 2 children from 3 to 6 years, made of a bended powder-coated green metal tube with a minimum diameter of 60 mm, complete of two safety seats + chest type seat attached to maintenance-free type swing hooks with galvanized steel chains, swing shall be fixed directly into the ground by using proper steel brackets.

Sample Playground Equipment Double Swing set (Europlay or equal manufacturer):

Line Items 0001 and 0002 Salient Characteristics:

All nuts and bolts are protected with safety plugs or black cap covers

Maximum overall dimensions: cm 890 x 510 x 440 (h)*

Minimum Fall height: 100 cm

Maximum Impact area: cm 1127 x 981

Age usage children from 3 to 6 years

Product certified design for public game areas - schools - socialization activities

Approved ASTM F1487 Standards or EN 1176:2008 CERTIFICATION, whichever is more stringent.

Type of wood: larch

Min. 10 cm thick round wooden poles cut outside the heart

All metal parts are polyester coated

HDPE Polyethylene sheet material

Ropes 16 mm (minimum) polypropylene rope with steel-wire reinforcement

Plastic slides, handles, steering wheel and climbing grips

HDPE polyethylene crawl tunnel

Protection caps

Galvanized metal base supports

Non-slip rock wall

Metal tubes of min. 6 cm diameter, treated against rust and polyester coated

Safety seats on galvanized chains

Maintenance-free swing hooks

* +/-10%

Line Item 0003:

A wet pour EPDM rubber impact absorbing surfacing material, approx. 355 sq. m, , in accordance with ASTM F1292 standards or according to safety regulations UNI EN 1177:2008 (whichever is more stringent) a wet pour rubber EPDM type, elastic material, draining, completely homogeneous, non-slip, non-flammable and weather resistant and complying with the performance requirements of BS 7188 for Abrasive Wear [un-aged], Slip Resistance [Dry & Wet] and Ease of Ignition. New rubber surfacing shall come with protective surrounding rubber edge finishing and mounted on the existing concrete surface. New play area layout design shall be of multi color/effects with design theme to be slected by Customer.

Line Item 0003 Salient Characteristics:

Two layer porous impact absorbing rubber surfacing

Surfacing rubber casting work shall be in accordance with ASTM F1292 standards or according to safety regulations UNI EN 1176-77, whichever is more stringent, elastic material, draining, completely homogeneous, non-slip, non-flammable and weather resistant and complying with the performance requirements of BS 7188 for Abrasive Wear [un-aged], Slip Resistance [Dry & Wet] and Ease of Ignition.

Min. thickness mm 80 + 13 (HIC 240 cm)

Floor surfacing bottom layer in SBR black min. thickness 80 mm out of granules of variable size from 3-7 mm, composed of 18 kg per square meter by SBR granules and 2.34 kg of one-component moisture curing polyurethane resin; and from surface layer (final) made of EPDM 13 mm thick, composed of square meters by 12.50 kg of granules EPDM and 2.40 kg of one-component moisture curing polyurethane resin.

EPDM (compound minimum 26,10% of EPDM, additives, fillers) pigmented origin in its totality, in manufacturing processes, solids particle size variable from 1-4 mm containing approximately 22% of polymer.

Where necessary, polyurethane paving PRIMER for anchoring to the substrate shall be used and accomplished with metal staffs and special sets.

Surface Layer shall be a rubber flooring poured on-site, out of elastic material, draining, completely homogeneous, non-slip, non-flammable, weather resistant and quick drying, finishing in the top layer of

EPDM as follows: EPDM granules (from grinding VIRGIN very high quality), with polymer content of

22%, staining carried out exclusively with mineral pigments that do not contain heavy metals, particle size

1/4 mm, tied with BINDER component polyurethane-based MDI / TDI permanently elastic medium reactivity with atmospheric moisture.

Wet Pour Rubber Surfacing ‘Wearing Course’ an EPDM rubber crumb mixed and bonded with a polyurethane resin screed, rolled and floated by hand to the required finish color EPDM (Ethylene

Propylene Dine Modified)

Resistance to fire EN 13501-1 E fl/E.

Temperature resistance -40°C/+80°C

The impact absorbing base layer depth must meet the required Critical Fall Height (CFH) of the play equipment in accordance with ASTM F1292 standards or BS EN 1177 requirements, whichever is more stringent. Therefore, prior the initial of work, the Contractor shall verify carefully the proper full base thicknesses before pouring the new surfacing.

(End of Summary of Changes)

File details come from the government source that posted it.