QUESTIONS AND ANSWERS FROM SITE VISITS 9/19/16 9/20/16
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_-_Audio_Booths.docx | DOCX document | |
| Product_-_100__Total_Small_Business_Set-Aside_(MOD_4).doc | DOC document | |
| Product_-_100__Total_Small_Business_Set-Aside_(MOD_2).doc | DOC document | |
| Product_-_100__Total_Small_Business_Set-Aside_(MOD_1).doc | DOC document | |
| Product_-_100__Total_Small_Business_Set-Aside.doc | DOC document | |
| Performance_Work_Statement_Occupatonal_Audiology.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Audio Booth 4 Site Visits 09/19 and 09/20/16 Areas 52, 22, 13, and Yuma Clinic Key Points /Contractor Questions
Area 52: RM 177 “Double Wall”(4 man double) Area 22: RM A23 “Single Wall” (6 man single) Area 13: RM B4 “Single Wall” (6 man single) Yuma, “Double Wall” (4 man double) OK without space configuration changes
Key Points:
· Will Contractor dismantle and remove old booths off base or palletize for delivery to DRMO?
· All 4 sites required a timeline of approximately 6 – 10 weeks prep/manufacturing time, after receipt of order (ARO) for new booths
· All 4 sites will require alarm systems to be deactivated for removal and install
· Contractor will deliver and install all units
· Yuma will require fire protection systems temporarily disconnected during uninstall/removal of old booth and install of new booth (during this period a “fire watch” is required)
· Visiting Contractor (Precision Fire) suggested adding an additional sprinkler in ceiling as well as “dropping down” existing sprinkler to provide protection to inside of audio booth.
Contractor Questions:
· Will Contractor dismantle and remove old booths off base or palletize for delivery to DRMO?
· Yes
· Reason for “double” booth?
· Per LCDR Veseyolah: for diagnostics, Med Staff will be present
· Will booths be “hard-wired” in for power?
· No, “hospital quality” wall plug in.
· Who will be responsible for electrical temporary shut off?
· Per Facilities personnel: Contractor, contact Facilities for access to disconnect power.
· Do you need a window to view patient (s)?
· Yes
· Do you have accessibility for removal of old booth and delivery/install of new booth?
· Yes, contact clinic in advance and Clinic gate (just inside Base Main Gate) can be opened for truck access.
· Do you need a sprinkler “dropped down” into booth for fire protection?
· Yes
· Can Clinic be accessed beyond standard 8-5 timeframe?
· Yes, contact clinic in advance. Earliest start time: 0630; latest end time: 1730
· Total removal/install time?
· 3 days: 2 to remove and 1 to install
· On 2nd visit 09/19/20-09/20/16: Will any sites require “drop down” or “false” ceiling to be lifted?
· No, plenty of room