N6660424Q0144 Amend 0004.pdf

PDF 152 KB Posted

Attached to
Construction- Bldg 1319 Stairwell Renovations Federal contract opportunity
Solicitation number
N6660424Q0144
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This solicitation is for construction services to renovate the stairwells in Building 1319 at the Naval Undersea Warfare Center Division in Newport, Rhode Island. Interested contractors can request access to the solicitation attachments, including drawings, specifications, and photos, by registering in SAM.GOV. The Naval Sea Systems Command within the Department of the Navy is the issuing agency. Contractors are not required to have JCP certification to receive the solicitation documents but must have an active SAM registration. Any questions can be directed to the points of contact listed in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Construction- Bldg 1319 Stairwell Renovations, newest first.
File Type Posted
II. H. Davis-Bacon Act WD # RI20240001 20240223.pdf PDF
Environmental Hazmat Inspection Memo B1319.pdf PDF
N6660424Q0144 Amend 0003.pdf PDF
N6660424Q0144 Amendment 0002.pdf PDF
N6660424Q0144 Amend 0001.pdf PDF
N6660424Q0144.pdf PDF
I. E. Davis-Bacon Act WD # RI20240001 20240112.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301126989

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See section A.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660424Q0144

X 9B. DATED (SEE ITEM 11)

17-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Feb-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

JAY PARKER, CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424Q0144

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 01-Mar-2024 02:00 PM to 07-Mar-2024 02:00 PM.

The required performance has changed from PROJECT TITLE AND DESCRIPTION: Bldg 1319 Stairwell RenovationsProposal Due: 1 Mar 2024 before 2:00 pm ET. Email to jay.a.parker2.civ@us.navy.mil and michael.n.ouellette.civ@us.navy.mil. Questions accepted up to 23 Feb 2024. Offeror MUST be registered in the System for Award Management to be considered for award.This requirement is 100% Small Business Set-Aside:

NAICS 236220; $45 MillionMagnitude per FAR 36.204: Between $100,000 and $250,000.Method of Payment: If no surcharge is applicable, the Government’s preferred method of payment is via credit card. Otherwise, Electronic Payment through Wide Area Workflow will be used. Please confirm Government Purchase Card is an acceptable form of payment within the proposal.Site Visit: 2:00 PM ET 31 Jan 2024. See Section A for complete details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS REQUIRED, PLEASE SEE

SECTIONS L AND M FOR SPECIFIC REQUIRMENTS. OFFERORS NOT SUBMITTING THIS

INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION FOR AWARD. to PROJECT TITLE AND DESCRIPTION: Bldg 1319 Stairwell RenovationsProposal Due: 7 Mar 2024 before 2:00 pm ET. Email to jay.a.parker2.civ@us.navy.mil and michael.n.ouellette.civ@us.navy.mil. Questions accepted up to 29 Feb 2024.

Offeror MUST be registered in the System for Award Management to be considered for award.This requirement is 100% Small Business Set-Aside: NAICS 236220; $45 MillionMagnitude per FAR 36.204: Between $100,000 and $250,000.Method of Payment: If no surcharge is applicable, the Government’s preferred method of payment is via credit card. Otherwise, Electronic Payment through Wide Area Workflow will be used. Please confirm Government Purchase Card is an acceptable form of payment within the proposal.Site Visit: 2:00 PM ET 31 Jan 2024. See Section A for complete details.IMPORTANT: PLEASE NOTE THAT TECHNICAL INFORMATION IS

REQUIRED, PLEASE SEE SECTIONS L AND M FOR SPECIFIC REQUIRMENTS. OFFERORS NOT

SUBMITTING THIS INFORMATION RISK BEING EXCLUDED FROM CONSIDERATION FOR AWARD..

The following have been modified:

GENERAL INFORMATION:

Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award

NUWCDIVNPT PID: N66604-24-SIMACQ-NPT-10-0121

NUWCDIVNPT Point of Contact: Jay Parker, jay.a.parker2.civ@us.navy.mil, (401) 832 2687

Amendment 0004: The purpose of this amendment it to:

1. Extend the proposal due date from 1 MAR 2024 @ 1400 EST to 7 MAR 2024 @1400 EST.

2. CLINs 001 and 002 extend delivery date from 90days to 120 days ADC.

3. 52.211-10 extend work completion date from 90 days to 120 days after award.

4. Add Attachment 4 Environmental Hazmat Inspection Memo B1319 dated 21-Feb-2024.

5. Remove Attachment 3 Davis-Bacon Act WD # RI20240001 dated 01-Jan-2024 and replace with Davis-Bacon Act WD # RI20240001 dated 23-Feb-2024.

6. Provide answers to RFI 0004 listed below.

RFIs 0004: N6660423Q0207: B1319 Stairwell Renovation

1. Has environmental testing been done for this job, will be getting done, or needs to be accounted for?

Response: See attached Environmental Hazmat Inspection Memo B1319 dated 21- Feb-2024.

2. Would the Navy entertain increasing the 90 days for project completion to 120 days?

Between gathering submittals, getting approval on submittals, gathering materials, coordinating mobilizations, completing the work, and inspections, the 90 days doesn't seem like enough time from our prior knowledge. This sentiment is also shared with our subcontractors per conversations we've had with them.

Response: Yes see attached amendment 0004 which has extended the project completion date from 90 days to 120days.

All other terms and conditions remain unchanged.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ADC 1 NAVAL STATION NWPT, RECEIVING

OFFICER

RECEIVING OFFICER

47 CHANDLER STREET

NEWPORT RI 02841

401-841-3827 FOB: Destination

N66604

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

120 dys. ADC 1 NAVAL STATION NWPT, RECEIVING

OFFICER

RECEIVING OFFICER

47 CHANDLER STREET

NEWPORT RI 02841

401-841-3827

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

90 dys. ADC 1 NAVAL STATION NWPT, RECEIVING

OFFICER

RECEIVING OFFICER

47 CHANDLER STREET

NEWPORT RI 02841

401-841-3827

To:

CAGE

120 dys. ADC 1 NAVAL STATION NWPT, RECEIVING

OFFICER

RECEIVING OFFICER

47 CHANDLER STREET

NEWPORT RI 02841

401-841-3827

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after award. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs Rev 2 B1319

Stairwells Renovation 020924

150 09-FEB-2024

Attachment 2 A-102 Drawing Rev2 B1319 Stairwell Renovation 021224

9 12-FEB-2024

Attachment 3 Davis-Bacon Act WD #

RI20240001

15 12-JAN-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs Rev 2 B1319

Stairwells Renovation 020924

150 09-FEB-2024

Attachment 2 A-102 Drawing Rev2 B1319 Stairwell Renovation 021224

9 12-FEB-2024

Attachment 3 Davis-Bacon Act WD #

RI20240001 20240223

15 23-FEB-2024

Attachment 4 Environmental Hazmat Inspection Memo B1319

24 21-FEB-2024