N6660424Q0144 Amend 0001.pdf

PDF 143 KB Posted

Attached to
Construction- Bldg 1319 Stairwell Renovations Federal contract opportunity
Solicitation number
N6660424Q0144
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is an amendment to a solicitation for construction services to renovate stairwells in Building 1319 at the Naval Undersea Warfare Center Division in Newport, Rhode Island. The amendment replaces project specifications and drawings, and provides answers to contractor questions. Renovation work includes replacing flooring with a rubber product instead of vinyl, selecting a neutral gray color, and addressing availability issues for vinyl baseboard. Interested contractors must request access to solicitation attachments in SAM.GOV and direct any other questions to the points of contact by email. The solicitation number is N6660424Q0144.

View the file

Other files for this federal contract opportunity

Other files attached to Construction- Bldg 1319 Stairwell Renovations, newest first.
File Type Posted
N6660424Q0144 Amend 0004.pdf PDF
II. H. Davis-Bacon Act WD # RI20240001 20240223.pdf PDF
Environmental Hazmat Inspection Memo B1319.pdf PDF
N6660424Q0144 Amend 0003.pdf PDF
N6660424Q0144 Amendment 0002.pdf PDF
N6660424Q0144.pdf PDF
I. E. Davis-Bacon Act WD # RI20240001 20240112.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301126989

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Section A

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Feb-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660424Q0144

X 9B. DATED (SEE ITEM 11)

17-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2024

CODE

NAVAL UNDERSEA WARFARE CENTER

JAY PARKER, CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660424Q0144

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION:

Distribution: To be provided at award NUWCDIVNPT PR Number: To be provided at award

NUWCDIVNPT PID: N66604-24-SIMACQ-NPT-10-0121

NUWCDIVNPT Point of Contact: Jay Parker, jay.a.parker2.civ@us.navy.mil, (401) 832 2687

Amendment 0001: The purpose of this amendment it to:

1. Remove Attachment 1 Specs B1319 Stairwells Renovation dated 01-Jul-2023 and replace with Specs Rev 1 B1319 Stairwells Renovation dated 01-Jul-2023.

2. Remove Attachment 2 Drawings B1319 Stairwell Renovation dated 01-Jul-2023 and replace with A-102 Drawing Rev 1 B1319 Stairwell Renovation dated 01-Jul-2023.

3. Provide answers to RFI 0001 listed below.

RFIs 0001: N6660423Q0207: B1319 Stairwell Renovation

1. What is the design intent for the flooring for tiles and treads? It is understood that the flooring specified is Armstrong and there will be a substitution to Nora flooring.

Response: Rubber offers more slip resistance, especially when wet. Armstrong flooring is vinyl-based rather than rubber and so will be substituted for something else. Nora is a candidate for that substitution and will be reviewed during pre-construction submittals.

Design intent is to protect against slips, trips and falls and to not clash with the new paint. Suggest therefore a neutral color like gray with raised round or other such pattern (chevron, diamond) to provide extra traction.

2. Would any portion of work need to be done during off hours?

Response: TBD as the stairwells provide egress they cannot be roped off or have access blocked during construction.

3. Based on market research it has been determined that the color for the vinyl Cove base is no longer available. What is an acceptable substitution?

Response: Any other cool or neutral gray color. This can also be worked out in more detail during pre-con submittals.

N6660424Q0144

All other terms and conditions remain unchanged.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs B1319 Stairwells

Renovation

150 01-JUL-2023

Attachment 2 Drawings B1319 Stairwell Renovation

9 01-JUL-2023

Attachment 3 Davis-Bacon Act WD #

RI20240001

15 12-JAN-2024

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specs Rev 1 B1319

Stairwells Renovation

150 01-JUL-2023

Attachment 2 A-102 Drawing Rev 1 B1319 Stairwell Renovation

9 01-JUL-2023

Attachment 3 Davis-Bacon Act WD #

RI20240001

15 12-JAN-2024

(End of Summary of Changes)

File details come from the government source that posted it. Updated .