Building 3 RFI’S Round 2 (01-09-2023, 1430)
RFI’s Submitted:
1) In the spec, you request VCT tile and an Epoxy floor. Which one is correct?
ANSWER: New Epoxy floor. VCT Tile will not work/hold up in the space.
2) In the spec you state that there should be a steel U channel bottom track and the rest of the system can be aluminum. Based on the sample I brought and the existing building we looked at, can we use the standard aluminum bottom track?
ANSWER: Steel and Aluminum will work.
3) The specification does not request any fire detection in the room. Please confirm that is correct.
ANSWER: No fire detection in the room.
4) The spec calls for 10’ high walls but looks like 12’ high in the drawings. Please clarify.
ANSWER: 12 Feet.
5) The specs calls out 3070 door but the plans have a 6’ x 7’ door. Please advise
ANSWER:
HW-101 (DOUBLE DOOR)
3 PAIR HINGES (A5111). SATIN S/S (630)
1 MORTISE PUSH PAD EXIT DEVICE W/ LEVER (TYPE 10,
FUNCTION F08, SATIN S/S FINISH)
PROVIDE AN INTERCHANGEABLE CORE CYLINDER TO ACCEPT A
GOVERNMENT FURNISHED CORE MANUFACTURED BY "BEST".
1 PAIR OF FLUSH BOLTS (INACTIVE LEAF)
2 8" X 34" KICK PLATE (J102). SATIN S/S (630)
1 FULL PERIMETER RUBBER BULB GASKET
2 DOOR SWEEPS W/ BLACK VINYL INSERT
6) Drawing 22-038A_ Pre-construction Note #2 :OFFICE MODULE IS TO BE
SURROUNDED BY CHAIN LINK FENCE WITH LOCKABLE SLIDING STEEL
CAGE. Please provide specification and design intent.
ANSWER: No steel cage will be needed.
7) Government provided modular office system. Please provide manufacturer & shop drawings.
ANSWER: There is no “Government Provided Office Module” unit will need to be provided by contractor.