Building 3 RFI’S Round 4 (01-18-2023) (REVISIONS)
RFI’s Submitted:
1) In the spec, you request VCT tile and an Epoxy floor. Which one is correct?
ANSWER: New Epoxy floor. VCT Tile will not work/hold up in the space.
2) In the spec you state that there should be a steel U channel bottom track and the rest of the system can be aluminum. Based on the sample I brought and the existing building we looked at, can we use the standard aluminum bottom track?
ANSWER: Steel and Aluminum will work.
3) The specification does not request any fire detection in the room. Please confirm that is correct.
ANSWER: Room needs a pull station and strobe. Equivalent to the following:
NEW FIRE ALARM HORN/STROBE AND PULL STATION SHALL BE
COMPATIBLE WITH EXISTING FIRE ALARM CONTROL PANEL (GAMEWELL
ZANS 400). PROVIDE 3/4" EMT CONDUIT PAINTED RED FOR NEW DEVICE.
RED STRIPED METAL CLAD CABLE DESIGNED FOR FIRE ALARM CIRCUITS
MAY BE USED WHERE CONCEALED ABOVE SUSPENDED CEILINGS.
CONNECT NEW DEVICE INLINE WITH NEAREST EXISTING DEVICE.
COORDINATE INSTALLATION WITH THE NAVFAC FIRE ALARM TECHNICIAN
AND THE NAVAL STATION NEWPORT FIRE DEPARTMENT.
4) The spec calls for 10’ high walls but looks like 12’ high in the drawings. Please clarify.
ANSWER: 12 Feet.
5) The specs calls out 3070 door but the plans have a 6’ x 7’ door. Please advise
ANSWER:
HW-101 (DOUBLE DOOR)
• 6 PAIR HINGES (A5111). SATIN S/S (630)
• 2 MORTISE PUSH PAD EXIT DEVICE W/ LEVER (TYPE 10, FUNCTION
F08, SATIN S/S FINISH)
• PROVIDE AN INTERCHANGEABLE CORE CYLINDER TO ACCEPT A
GOVERNMENT FURNISHED CORE MANUFACTURED BY "BEST".
• 1 PAIR OF FLUSH BOLTS (INACTIVE LEAF)
• 2 8" X 34" KICK PLATE (J102). SATIN S/S (630)
• 1 FULL PERIMETER RUBBER BULB GASKET
• 2 DOOR SWEEPS W/ BLACK VINYL INSERT
6) Drawing 22-038A_ Pre-construction Note #2 :OFFICE MODULE IS TO BE
SURROUNDED BY CHAIN LINK FENCE WITH LOCKABLE SLIDING STEEL
CAGE. Please provide specification and design intent.
ANSWER: No steel cage will be needed.
7) Government provided modular office system. Please provide manufacturer & shop drawings.
ANSWER: There is no “Government Provided Office Module” unit will need to be provided by contractor.