Building 3 Site Visit #1 (12-13-2022, 1300)
RFI’s Submitted:
1) What is the distance from the power panel to where the modular will be located?
ANSWER: POWER PANEL PP-M1 IS ESTIMATED 100’ AWAY FROM OFFICE
MODULE. PANEL PP-M1 IS ILLUSTRATED IN DRAWING PACKAGE 22-038A
SHEET E-1.
2) What make and model of Fire Suppression do you currently use so we can continue it in the modular?
ANSWER: EXISTING FIRE SUPPRESSION IS A DRY PIPE SYSTEM.
EXISTING SYSTEM IS TO CONTINUE TO NEW SUPPRESSION HEADS IN
OFFICE MODULE. THE MAKE AND MODEL OF THE FIRE SUPPRESSION
SYSTEM IS MAINLY VICTAULIC VALVES AND PLUMBING.
3) What make and model of the fire detection system do you use so we can continue it in the modular?
ANSWER: EXISTING SYSTEM IS A GAMEWELL ZAN400.
4) Where is the HVAC system going outside?
ANSWER: HVAC UNITS ARE TO BE MOUNTED OUTSIDE ON BRACKETS
(AS SHOWN IN DETAIL ON SHEET M-1).