N66604-20-Q-0811 Amendment 4.pdf
PDF 1 MB Posted
- Attached to
- Sewer Repair (NUWCDIVNPT) Federal contract opportunity
- Solicitation number
- N6660420Q0811
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N66604-20-Q-0811 Amendment 3.pdf | ||
| N66604-20-Q-0811 Amendment 2 .pdf | ||
| N66604-20-Q-0811 Amendment 1.pdf | ||
| N6660420Q0811.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300827244
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Amendment is to answ er questions from industry, provide the NAVSTA Soil Management Plan (see Question 15) and extend the proposal due date to 2:00 PM, 4/16/2020.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660420Q0811
X 9B. DATED (SEE ITEM 11)
06-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Apr-2020
CODE
NAVAL UNDERSEA WARFARE CENTER
MICHAEL NORMAN OUELLETTE , CODE 0221
CONTRACTS DEPARTMENT
1176 HOWELL STREET, BLDG. 1258
NEWPORT RI 02841-1708
N66604 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6660420Q0811
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 06-May-2020 12:00 AM to 16-Apr-2020 12:00 AM.
The required performance has changed from PROJECT TITLE AND DESCRIPTION: Sewer Repair; This Construction project is to repair and replace a section of underground sewer pipe that has settled. The work includes building temprorary barriers, excavating the hallway, replacement of the pipe, backfilling, pouring new concrete floor, finishing the floor with epoxy to match exisiting surfaces, removal of temporary barriers, and repairing adjacent surfaces damaged during work. SITE VISIT: TBD; MEET AT BUILDING 80 NUWC DIVISION
NEWPORT--PLEASE ALLOW FOR SUFFICENT TIME FOR PROCCESSING SITE VISIT REQUEST;
SUBMIT ASAP (SEE SECTION A FOR INSTRUCTIONS)PROPOSAL DUE: TBD (approx. 2 weeks after site visit); OFFEROR MUST HAVE ACTIVE SAM REGISTRATION TO BE ELIGIBLE FOR
AWARD.MAGNITUDE: PER FAR 36.204, THE MAGNITUDE OF THE PROPOSED CONSTRUCTION IS
BETWEEN $25,000 AND $100,000.THE METHOD OF PAYMENT WILL BE WIDE AREA
WORKFLOW.TECHNICAL INFORMATION IS REQUIRED WITH PROPOSAL SUBMISSION; SEE
SECTION L.THIS IS A 100% SMALL BUSINESS SET ASIDE; NAICS 237110; $39.5 MIL to PROJECT TITLE AND DESCRIPTION: Sewer Repair; This Construction project is to repair and replace a section of underground sewer pipe that has settled. The work includes building temprorary barriers, excavating the hallway, replacement of the pipe, backfilling, pouring new concrete floor, finishing the floor with epoxy to match exisiting surfaces, removal of temporary barriers, and repairing adjacent surfaces damaged during work. SITE VISIT: TBD; MEET AT
BUILDING 80 NUWC DIVISION NEWPORT--PLEASE ALLOW FOR SUFFICENT TIME FOR
PROCCESSING SITE VISIT REQUEST; SUBMIT ASAP (SEE SECTION A FOR INSTRUCTIONS)PROPOSAL DUE: 04/16/2020 @2:00pm EST; OFFEROR MUST HAVE ACTIVE SAM REGISTRATION TO BE ELIGIBLE FOR AWARD.MAGNITUDE: PER FAR 36.204, THE MAGNITUDE OF THE PROPOSED CONSTRUCTION IS
BETWEEN $25,000 AND $100,000.THE METHOD OF PAYMENT WILL BE WIDE AREA
WORKFLOW.TECHNICAL INFORMATION IS REQUIRED WITH PROPOSAL SUBMISSION; SEE
SECTION L.THIS IS A 100% SMALL BUSINESS SET ASIDE; NAICS 237110; $39.5 MIL.
The following have been modified:
GENERAL INFORMATION SITE VISIT
Q&A
Q1: Is there a plumbing as‐built drawing available for this portion of the building or can NAVFAC confirm the depth of the existing sewer line from the point where the work begins to where it ends? From the drawings, it appears excavation to a maximum depth of 6’6” will be required. This will help us determine the needs for trench protection and/or any shoring required for any undermined slab.
A1: The depth estimated to be at 6’6”. However, contractor shall provide excavation to a depth of 7’‐8’, as necessary to complete repair.
Q2: Is there a structural as‐built drawing available for this portion of the building? There is a row of columns along the south corridor wall, one or two of which are in the area of the work. As these footings are within the building’s structural footprint, there is a chance they only 18” or 24” below grade. They would, therefore, potentially be undermined during excavation to perform the work.
A2: Shoring shall be provided to prevent undermining existing column footings.
Q3: Is a covered, heated enclosure still required around the area where the exterior work is being performed, or can chain link fencing with fabric walls and a weather/pest‐protective barrier at the personnel door be substituted, as this work will be performed during warmer months?
A3: The heated enclosure can be substituted for chain link fencing with fabric walls and a weather/pest‐protective barrier at the personnel door. When workers are not on site, a temporary stop must be in place to prevent the
N6660420Q0811 door from swinging open due to wind (the electric strike will be removed by NUWC Security to allow direct access to the site by the contractor).
Q4: Please confirm there is no requirement to replace the recessed floor mat being removed and disposed of at the personnel door.
A4: There is no requirement to replace the recessed floor mat.
Q5: While the slab is curing 28 days to be suitable for placement of the epoxy floor, should we plan on leaving all temporary barriers/provisions in place, or should the corridor and personnel door be opened for limited access, such as use as an emergency egress only?
A5: The corridor and personnel door should be opened for limited access.
Q6: What material is proposed under the exterior slab?
A6: Select backfill as described on drawings 19‐041A, sheet 1.
Q7: Will a roof design be provided for the temporary heated enclosure?
A7: No.
Q8: How will Room 207 be accessed?
A8: There is a double door to the north. Refer to the key plan on drawings 19‐041A, sheet 1.
Q9: Can a photo of the hallway floor (to be demolished during construction) be provided? To show condition, cove base, etc.
A9: No.
Q10: How many sprinkler heads are in the work area that need to be covered?
A10: Five Q11: How many smoke detectors/alarms are in the work area that need to be covered?
A11: Four Q12: How many air/heat vents are in the work area that need to be covered?
A12: One Q13: How many doors in the hallway need to be covered and/or sealed?
A13: Three Q14:Can excavatable flowable fill concrete be used instead of select backfill for the sewer trench inside the building?
A14: Yes. Use material conforming to the Rhode Island Department of Transportation Standard Specifications for Road and Bridge Construction, Section 603 Controlled Low Strength Material (CLSM), Table 1 for excavatable fill.
Q15: Do we expect to encounter (and have to handle/dispose) of arsenic soil in performance of this project?
A15: : All excess soil materials shall be managed (handle/dispose) in accordance with NAVSTA Soil Management Plan (see attachment).
(End of Summary of Changes)
Soil Management Plan
Naval Station Newport, Newport, RI
This Soil Management Plan (SMP) has been prepared to establish procedures that will be followed should future construction, demolition or maintenance activities at the Naval Station Newport (NAYSTA) require the need to manage disturbed or excavated soil. The plan cannot be used to manage soils on Navy Installation Restoration (IR) sites, soils with known contamination, such as PCBs, asbestos, or mercury, soils regulated by the State of RI with contamination other than arsenic, and on propelty leased to private entities (e.g .
pri vatized Housing) .
Background
The property, located in Newport, RI, was established in 1869 with the construction of a torpedo station. The Navy War College was added in 1884 and the site was used for sailor training and housing and fueling facilities during World War II. Post WWII the property footprint and training activities were reduced while research and development efforts were increased . The soils on the property were found to contain arsenic that exceeds regulatory levels during a property-wide site investigation that included the collection and analysis of more than 1000 soil samples These soils must be removed and disposed of, or covered with Department (i.e. State of Rhode Island Department of Environmental Management) approved engineered controls, consisting of building foundations, asphalt pavement, and landscaping and environmental land use controls (ELUR) in order to prevent direct exposure to regulated soils.
Applicable Area
This SMP, and affiliated ELUR (when applicable), restricts the property to industrial or commercial usage, and pertains to the entire property. See attached site figure.
Soil Management
The direct exposure pathway is the primary concern at the site. Individuals engaged in activities at the site may be exposed through incidental ingestion, dermal contact, or inhalation of entrained soil particles if proper precautions are not taken. Therefore, the following procedures will be followed to minimize the potential of exposure.
During site work, the appropriate precautions will be taken to restrict unauthorized access to the property.
During all site/earth work, dust suppression (i.e. watering) techniques must be employed at all times. In the event that an unexpected observation or situation arises during site work, such activities will immediately stop (such as olfactory or visual evidence of waste material or contamination, PCB contamination or asbestos debris disposal). Workers will not attempt to handle the situation themselves but will contact the appropriate authority for fUlther direction.
If excess soil is generated /excavated from the property, the soil is to remain on-site for analytical testing, to be performed by an environmental professional, in order to determine the appropriate disposal and/or management options. The soil must be placed on and covered with polyethylene/plastic sheeting during the entire duration of its staging and secured with appropriate controls to limit the loss of the cover and protect against storm-water and/or wind erosion (i .e. hay bales, silt fencing, rocks, etc).
Excavated soils will be staged and temporarily stored in a designated area of the property.
Within reason, the storage location will be selected to limit the unauthorized access to the materials (i.e. away from public roadways/walkways). No soil will be stockpiled on-site for greater than 60 days without prior Department approval.
Soils excavated from the site may not be re-used as fill on residential property.
Excavated fill material shall not be re-used as fill on commercial or industrial properties unless it meets the Department's Method 1 Residential Direct Exposure Criteria for all constituents listed in Table 1 of the Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases (Remediation Regulations) .
Excavated soil to be reused on non-Navy commercial or industrial properties must be sampled and analyzed, by a qualified environmental professional, at a frequency of one sample per 500 tons for all constituents in Table 1. Copies of the laboratory analysis results shall be maintained by the site owner and included in the annual inspection report for the site, or the closure report if applicable. In the event that the soil does not meet any of these criteria, the material must be properly managed and disposed of off site at a licensed facility.
Site soils, which are to be disposed of off-site (and not reused off-site), must be done so at a licensed facility in accordance with all local, state, and federal laws. Copies of the material shipping records associated with the disposal of the material shall be maintained by the site owner and included in the annual inspection report for the site.
Best soil management practices should be employed at all times and regulated soils should be segregated into separate piles (or cells or containers) as appropriate based upon the results of analytical testing, when mUltiple reuse options are planned (i.e. reuse on site, reuse at a Department approved industrial/commercial property, or disposal at a Department approved licensed facility) .
All non-disposable equipment used during the soil disturbance activities will be properly decontaminated as appropriate prior to removal from the site. All disposable equipment used during the soil disturbance activities will be properly containerized and disposed of following completion of the work. All vehicles utilized during the work shall be properly decontaminated as appropriate prior to leaving the site.
At the completion of site work, all exposed soils that remain on the site (i.e. have not been removed to licensed disposal facility) are required to be recapped with Department approved engineered controls (i.e. 2 feet of clean fill or equivalent; building foundations;
4 inches of pavement/concrete underlain with 6 inches of clean fill; and/or 1 foot of clean fill underlain with a geotextile liner) consistent or better than the site surface conditions prior to the work that took place. These measures must also be consistent with the Department approved ELUR recorded on the property. Any clean fill material brought on site is required to meet the Department's Method 1 Residential Direct Exposure Criteria or be designated by an Environmental Professional as Non-Jurisdictional under the Remediation Regulations. The Annual Inspection Report for the site, or Closure Report if applicable, should include either analytical sampling results from the fill demonstrating compliance or alternatively include written certification by an Environmental Professional that the fill is not jurisdictional.
Worker Health and Safety
To ensure the health and safety of on-site workers, persons involved in the excavation and handling of the material on site are required to wear a minimum of Level D personal protection equipment, including gloves, work boots and eye protection. Workers are also required to wash their hands with soap and water prior to eating, drinking, smoking, or leaving the site.
Department Approval
In accordance with the Departments' requirements, no soil at the property is to be disturbed after an engineering control has been implemented in any manner without prior VvTitten permission of the Department's Office of Waste Management, except for minor inspections, maintenance, and landscaping activities that do not disturb the contaminated soil that is left in place.
As part of the notification process, the Navy shall publish a notice, annually in the Newport Daily News that indicates that soil contain arsenic above the Department's Method 1 Direct Exposure Criteria, that soil work is planned on the property, and that individuals will be notified if work is to be done adjacent to privately-owned property.
In addition, the Navy will prepare an annual report to be submitted to the Department that summarizes construction work done on the property were soil was removed and inspections of sites on the property were soils with arsenic have been left in place and land use restrictions have been applied.
For soil that is removed, the report will identify the location, quantity, and ultimate destination. For sites with land use restrictions the inspections will include the location of the site and certification that the engineering controls remain in place.
_DJ)---'av,_id-D-�-r-oc_zG:')_' P�E-�---=�<.....,,______,,_�=---�12!� O Environmental Division Director Chief of Office of Waste Management
Naval Station Newport Department of Environmental Management
| Amendment 4 |
| NAVSTA Newport Soil Management Plan |
File details come from the government source that posted it. Updated .