N66604-20-Q-0811 Amendment 3.pdf

PDF 203 KB Posted

Attached to
Sewer Repair (NUWCDIVNPT) Federal contract opportunity
Solicitation number
N6660420Q0811
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Sewer Repair (NUWCDIVNPT), newest first.
File Type Posted
N66604-20-Q-0811 Amendment 4.pdf PDF
N66604-20-Q-0811 Amendment 2 .pdf PDF
N66604-20-Q-0811 Amendment 1.pdf PDF
N6660420Q0811.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1300827244

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to respond to questions from industry. Please See Section A.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6660420Q0811

X 9B. DATED (SEE ITEM 11)

06-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Apr-2020

CODE

NAVAL UNDERSEA WARFARE CENTER

MICHAEL NORMAN OUELLETTE , CODE 0221

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841-1708

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6660420Q0811

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

GENERAL INFORMATION SITE VISIT

Q&A

Q1: Is there a plumbing as-built drawing available for this portion of the building or can NAVFAC confirm the depth of the existing sewer line from the point where the work begins to where it ends? From the drawings, it appears excavation to a maximum depth of 6’6” will be required. This will help us determine the needs for trench protection and/or any shoring required for any undermined slab.

A1: The depth estimated to be at 6’6”. However, contractor shall provide excavation to a depth of 7’-8’, as necessary to complete repair.

Q2: Is there a structural as-built drawing available for this portion of the building? There is a row of columns along the south corridor wall, one or two of which are in the area of the work. As these footings are within the building’s structural footprint, there is a chance they only 18” or 24” below grade. They would, therefore, potentially be undermined during excavation to perform the work.

A2: Shoring shall be provided to prevent undermining existing column footings.

Q3: Is a covered, heated enclosure still required around the area where the exterior work is being performed, or can chain link fencing with fabric walls and a weather/pest-protective barrier at the personnel door be substituted, as this work will be performed during warmer months?

A3: The heated enclosure can be substituted for chain link fencing with fabric walls and a weather/pest-protective barrier at the personnel door. When workers are not on site, a temporary stop must be in place to prevent the door from swinging open due to wind (the electric strike will be removed by NUWC Security to allow direct access to the site by the contractor).

Q4: Please confirm there is no requirement to replace the recessed floor mat being removed and disposed of at the personnel door.

A4: There is no requirement to replace the recessed floor mat.

Q5: While the slab is curing 28 days to be suitable for placement of the epoxy floor, should we plan on leaving all temporary barriers/provisions in place, or should the corridor and personnel door be opened for limited access, such as use as an emergency egress only?

A5: The corridor and personnel door should be opened for limited access.

Q6: What material is proposed under the exterior slab?

A6: Select backfill as described on drawings 19-041A, sheet 1.

Q7: Will a roof design be provided for the temporary heated enclosure?

A7: No.

Q8: How will Room 207 be accessed?

A8: There is a double door to the north. Refer to the key plan on drawings 19-041A, sheet 1.

Q9: Can a photo of the hallway floor (to be demolished during construction) be provided? To show condition, cove base, etc.

A9: No.

Q10: How many sprinkler heads are in the work area that need to be covered?

A10: Five Q11: How many smoke detectors/alarms are in the work area that need to be covered?

A11: Four Q12: How many air/heat vents are in the work area that need to be covered?

A12: One

N6660420Q0811

Q13: How many doors in the hallway need to be covered and/or sealed?

A13: Three Q14:Can excavatable flowable fill concrete be used instead of select backfill for the sewer trench inside the building?

A14: Yes. Use material conforming to the Rhode Island Department of Transportation Standard Specifications for Road and Bridge Construction, Section 603 Controlled Low Strength Material (CLSM), Table 1 for excavatable fill.

(End of Summary of Changes)