Solicitation Amendment 0005

View the file

Other files

File Type Posted
N6660416R07450007.pdf PDF
N6660416R07450006.pdf PDF
N6660416R07450002.pdf PDF
N6660416R07450004.pdf PDF
N6660416R07450003.pdf PDF
N6660416R18830002.pdf PDF
N6660416R07450001.pdf PDF
N6660416R0745.pdf PDF
16-R-0745_Sources_Sought__Draft_SOW_1-5-16.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er question # 8 from industry and correct clause L31X Technical Proposal.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N66604-16-R-0745

X 9B. DATED (SEE ITEM 11)

08-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2016

CODE

NAVAL UNDERSEA WARFARE CTR. DIV., NPT.

ROSEMARY E. BECKMANN, CODE 0223

CONTRACTS DEPARTMENT

1176 HOWELL STREET, BLDG. 1258

NEWPORT RI 02841

N66604 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N66604-16-R-0745

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

SOLICITATION REQUIREMENTS

Offerors shall submit proposals by electronic means rather than in accordance with the template proposal requirements on the cover page o fthe SF-33. All electronic submissions shall be sent to, Rosemary Beckmann, rosemary.beckmann@navy.mil. Please copy Andrew Nagelhout, andrew.c.nagelhout@navy.mil, and George Murphy, george.m.murphy@navy.mil , for all electronic submissions and questions. All submissions must be received by the closing date and time located on the cover page of the SF-33. Furthermore, a single electronic submission shall not exceed 5 megabytes. If this requires submission through multiple emails to send the complete proposal the first email shall include an accounting of each email to follow so the Government can determine it has a complete proposal. Proposal attachments must be in formats readable by Microsoft Office or Adobe PDF.

This solicitation is set-aside 100% for small business

The Government prefers to make a single award as a result of this RFP, however will accept separate proposals for only the CW-1147 domes and only the CW-1181D/CW-1181E domes.

Contractors must be registered in the System for Award Management (SAM) to be eligble for award. Instructions for registraton are available on the SAM website; www.sam.gov .

Distribution D drawings are included in the solicitation FedBizOpps (FBO) posting. Only Companies with Joint Certification Program (JCP) Certifications may access the drawings. Information about JCP certification may be accessed at http://www.dlis.dla.mil/jcp/.

Delivery dates have been aded to Section F, DELIVERY INFORMATION, for system purposes only. See FAR Clause 52.211-8, TIME OF DELIVERY, for the delivery schedule.

MINIMUM AND MAXIMUM QUANTITIES

As referred to in paragraph (b) of the clause entitled, Indefinite Quantity (FAR 52.216-22), the contract minimum and maximum quantities are as follows:

CLIN ITEM DESCRIPTION MINIMUM MAXIMUM

0001 CW-1147 Dome Mold Drawing 1 1

0002 CW-1147 Dome Mold 1 1

0003 CW-1147 Pre-production Dome 1 1

0004 CW-1181D Pre-production Dome 1 1

0005 CW-1181E Pre-production Dome 1 1

QUESTIONS AND ANSWERS:

Q1: Can you provide access to the data package for this solicitation?

A1: The data package is accessed through FedBizOpps by supplying a valid JCP certification number.

Q2: Do you have one contractor who can provide both CW-1147 and CW-1181D/E Domes?

A2: As stated above under solicitation requirements, the Government prefers to make a single award as a result of this RFP, however will accept separate proposals for only the CW-1147 domes and only the CW-1181D/CW-1181E domes.

Q3: Solicitation Section-F states CLIN0002, Dome Mold schedule is 6 months ADC.

Solicitation Section C11 SOW 4.2.2 states that the contractor shall fabricate a mold in accordance with drawings submitted under CLIN0001 and subject to approval by NUWC.

Schedule for CLIN0001 is 2 months ADC. Is the Government intending the first issued Delivery Order to include both CLIN0001 and CLIN0002, and if so, was the schedule for CLIN0002 intended to be 6 months after CLIN0001 approval by the Government; or would it remain 6 months ADC, therefore reducing the schedule for CLIN0002 to 4 months or less (assuming 2 months to complete CLIN0001 and NUWC approval)?

A3: The first delivery order will include CLIN 0001 and CLIN 0002, however no work can be performed on CLIN 0002 until the drawing is approved by NUWC. The schedule for CLIN 0002 is 6 months after contract award as stated in the solicitation. Therefore the schedule for the mold will be approximately 3 ½ months after drawing approval (allows 2 weeks for NUWC drawing approval).

Q4: Solicitation Section-F states CLIN0003, CW-1147 pre-production dome schedule is 10 months ADC.

Solicitation Section C11 SOW 4.2.2 states that NUWC conditional approval of the CLIN0002 dome mold is required before the mold can be used for CLIN0003 pre-production dome.

Schedule for CLIN0002 is 6 months ADC. Is the Government intending to issue a single Delivery Order to include both CLIN0002 and CLIN0003, and if so, was the schedule for CLIN0003 intended to be 10 months after CLIN0002 approval by the Government? Or would it remain 10 months ADC, therefore reducing the schedule for CLIN0003 to 4 months or less (assuming 6 months to complete CLIN0002 and NUWC approval). If another schedule which incorporates the nexus of CLIN0003 is appropriate, so state. For example, CLIN0003 is 10 months ADC or 6 months after NUWC approval of CLIN0002, whichever is greater.

A4: As stated above CLIN 0002 will be funded in the initial delivery order. CLIN 0003 may be funded in the initial delivery order, or in the 2nd delivery order subject to availability of funds.

The schedule for CLIN0003 is 10 months after contract award as stated in the solicitation. Therefore the schedule for the pre-production dome will be approximately 3 ½ months after conditional mold approval (allows 2 weeks for NUWC approval of inspection report).

Q5: Solicitation Section-C11 SOW 4.2.4 states "Based on NUWC acceptance of the pre-production dome (CLIN0003), the CW-1147 dome mold (CLIN0002) will be unconditionally approved.). C11 SOW 4.2.2 states that "The Government will provide conditional approval of the mold (CLIN0002) based on review of the inspection report.". This leaves open the possibility that the Government will only approve payment on CLIN0002 upon acceptance of CLIN0003. Is this how the Government intends to approve payment on CLIN0002? If yes, since conditional approval by the Government is required on CLIN0002, would it be possible for the Government to affect full payment on CLIN0002, based on that conditional approval, since this is a Small Business set aside? The dome mold drawings (CLIN0001) and dome mold (CLIN0002) will be reviewed and approved by both the vendor and Government technical experts. Therefore, it would seem unreasonable for the Government to withhold payment on

CLIN002.

Even if the contractor ceased work on the contract after delivery of CLIN0002, the Navy would still be in possession of detailed, approved mold drawings, and a mold which has been manufactured to those drawings and reviewed by the Government. Therefore, it does not seem reasonable to make payment of CLIN0002 contingent upon completion of CLIN0003, especially when a Small Business concern is involved.

A5: The Government will provide conditional approval of the mold (CLIN0002) based on review of the inspection report. The reason this approval is conditional, is because the final acceptance of the mold is based on the verification that a dome produced with that mold (i.e. the pre-production dome) meets all of the drawing requirements for the CW-1147 Dome. Verifying that the dome is built to the drawing doesn’t ensure that the mold will produce domes that meet drawing requirements. The vendor is responsible to design a mold that will produce domes that meet drawing requirements. Payment of the mold is based on verifying that the mold will produce domes that meet drawing requirements.

Q6: Each of the three domes have a drawing note that requires a test panel to be manufactured and tested for each dome. See drawings 04825002 Note 7D, 7634160 Note 9 and 7487559 Note 9. Can you clarify if a test panel is required to be manufactured and tested for EACH dome manufactured (100% Production Test)? If not a 100% Production Test, please state if any test panels need to be manufactured and tested for any production CLINs, and if so (for example, Production Control LOT sample testing), please state the test panel schedule.

A6: The contractor is required to fabricate a concurrent test panel for each pre-production and production dome to be used for material properties testing as defined on the applicable drawings.

Q7: CLIN0006 CW-1147 dome schedule is listed as 6 months. The mold(s) produced via CLIN0002 will be Government property.

The manufacturing process for this dome could require 4-5 business days, consuming the mold for a work-week.

If the process is demonstrated to consume a work-week, and the Government requires a minimum of 6 domes monthly, will the Government manufacture a second mold?

If not, will the requirement be reduced to 4 monthly?

A7: The intent of this requirement is that deliveries would begin 6 months ARO at some monthly rate. The Government's minimum requirement is a rate of 4 units per month. As a result, clause 52.211-8 Time of Delivery has been clarified.

Q8: Page 60 section 2.1.1.4.1. On the fourth line it states “twenty (15)” domes. Should the quantity be twenty or 15?

A8: The quantity should be 20 domes. Clause L31X has been updated to reflect the correct quantity.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L31X TECHNICAL PROPOSAL

1.0 INSTRUCTIONS FOR SUBMISSION OF PROPOSALS

1.1 General Information

All questions concerning this procurement, either technical or contractual, must be submitted via the email. No direct discussion between the technical representative and prospective Offeror will be conducted. Questions and proposals shall be submitted to all the following points of contact:

Name: Rosemary Beckmann Email: rosemary.beckmann@navy.mil

Name: Andrew Nagelhout Email: andrew.c.nagelhout@navy.mil

Name: George Murphy Email: george.m.murphy@navy.mil

1.2 Submission Requirements

(a) Each Offeror shall submit its entire proposal electronically. The Government will evaluate each Offeror's understanding of the Government's requirements and ability to perform the work on the basis of its proposal.

Offerors shall provide information and documentation in detail to clearly identify its overall qualifications.

(b) Proposals shall be submitted electronically via email to Rosemary Beckmann at rosemary.beckmann@navy.mil. Offerors shall comply with the detailed instructions for the format and content of the proposals; proposals that do not comply may be considered unacceptable and may render the Offeror ineligible for award.

1.3 Proposal Format

(a) The proposal shall be submitted in the English language. The narrative material in the proposal shall be prepared in no smaller than 10 point font, single-spaced with no less than a one inch margin on all sides. In the event photo reduction is used for tables, charts, and drawings, their presentation must be clear and legible. No pictures or hyperlinks are allowed.

(b) Proposals and all attachments shall be readable by Microsoft Office or Adobe Acrobat.

(c) Offerors are required to submit their proposals in separate volumes as follows:

Volume Volume Title Maximum Number of

Pages

I Technical Proposal 10

II Past Performance 2 Per Reference

III Price N/A

Important: Offerors shall not include classified material in the volumes.

(d) Offerors shall provide a cover letter with the following information:

(1) Solicitation number;

(2) The name, address, email address, telephone numbers, Cage Code, DUNS Number, and Tax Identification

Number (TIN) of the Offeror;

(3) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item. Also identify any exceptions the Offeror takes to the terms and conditions of the solicitation;

(4) A statement that the proposal is valid through 180 calendar days from the date specified for receipt of proposals;

(5) Names, titles, telephone numbers, and e-mail addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation;

(6) DCAA and DCMA office points of contact, including branch location, contact name, telephone number, and email address;

(7) Name, title, and signature of a person authorized to sign the proposal; (8) Identify all enclosures being transmitted as part of its proposal; and,

(8) If the Offeror (prime and/or subcontractor) is proposing on a cost reimbursement basis (e.g. Cost Plus Fixed Fee) or a Time and Materials (T&M) basis, include the status of the Offeror’s accounting system and provide supporting documentation (e.g. DCMA letter confirming adequacy of accounting system).

(e) Offerors shall provide fill-in information for the following:

1. NOTE A: Stepladder Pricing Structure

2. FAR 52.211-8 TIME OF DELIVERY

3. G10 CONTRACTUAL AUTHORITY AND COMMUNICATIONS (JUN 2015)

4. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (JULY

2013)

2.0 NON-COST/PRICE FACTORS

Offerors shall provide information by addressing each factor/subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offeror’s capability to support the proposed response to the evaluation factors. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. All information and data provided shall be specific to this solicitation except for the area of Past Performance. Proposals that do not contain the information required in the solicitation risk being determined unacceptable or unawardable by the Government.

In the response to the RFP, the Offeror must address the below factors and subfactors.

2.1 Technical Factors

2.1.1 Technical Capability

2.1.1.1 Producibility/ Throughput/Production Rate

2.1.12 Facilities Description

2.1.1.3 Technical Risk Assessment

2.1.1.4 Administrative Aspects of the Resulting CW1181D/E and CW-1147 domes

2.1.2 Past Performance

3.0 Price

2.1.1 TECHNICAL CAPABILITY

This procurement reflects a build-to-print approach. The contractor shall manufacture, test, package, and deliver CW-1181D, CW-1181E and CW-1147 domes, and associated baseplates and mounting hardware which meet the requirements of the CW1181D/E and CW-1147 dome drawing packages provided as Applicable Documents. The proposal shall describe the Offeror’s existing and/or planned facilities to demonstrate the ability to the manufacture and test domes which will comply with the requirements of the dome applicable drawings and Statement of Work (SOW). The Offeror shall format the proposal using the following outline numbering:

2.1.1.1 Producibility/Throughput Rate

The Offeror shall demonstrate a working knowledge of key manufacturing materials and processes required to produce a consistent product, and address manufacturing capacity. The discussion shall include:

2.1.1.1.1 Critical Materials –the Offeror shall discuss experience using the critical materials specified in the CW1181D/E and CW-1147 dome GFI drawings.

2.1.1.1.2 Critical Processes - the Offeror shall discuss the critical processes necessary to consistently meet the CW1181D/E and CW-1147 dome GFI drawing requirements.

2.1.1.3 Throughput/Production Rate – the Offeror shall demonstrate its manufacturing capacity to support a production rate of 6-8 domes per month on a non-interfering basis with any other of its contractual obligations.

2.1.1.2 Facilities Description.

The Offeror shall list and describe all existing and planned facilities and equipment which are required for the fabrication, manufacturing, inspection, testing, and delivery of the CW1181D/E and CW-1147 domes as set forth in the dome applicable drawings and SOW. That description shall include at a minimum:

a. Incoming inspection

b. In-process testing and inspection

c. Special test equipment and tooling

d. Special manufacturing equipment

e. Calibration equipment and techniques

f. Final inspection

g. Packaging and shipping

h. Documentation control

i. Secure storage for government-furnished information

2.1.13.4 Technical Risk Assessment

Every dome fabrication and manufacturing effort involves risk. The Offeror shall identify potential risks and provide a mitigation approach for each identified risk within the following areas:

2.1.1.3.1 Sub-Contractors and/or Vendors (if applicable). Use of sub-contractors for critical processes or critical materials, and/or sole source vendors for critical or long-lead parts.

2.1.1.3.2 Meeting all performance requirements in the applicable drawings and SOW, and how it affects the production plan and schedule

2.1.1.4 Administrative Aspects of the Resulting CW1181D/E and CW-1147 domes Contract (5 pages)

2.1.1.4.1 Schedule/Milestones

The Offeror shall present a summary schedule, which includes critical tasks and major milestones required to fabricate, inspect and test the proposed domes. The Offeror shall provide the First Year Production schedule.

For the first production year, the Offeror shall assume, solely for the purposes of this proposal, that it has a production dome order for twenty (20) 1147 domes, ten (10) CW-1181E domes and ten (10) CW-1181D domes..

2.1.1.4.2 Configuration Management Plan

The Offeror shall discuss its Configuration Management (CM) plans and procedures and how it will execute CM relative to the production of CW-1147/CW-1181 domes. The Offeror shall include a specific discussion for managing the configuration of engineering drawings and documents pertinent to the CW-1147/CW-1181 domes production program.

2.1.1.4.3 Contract Data Requirements List (CDRL) Management

The Offeror shall discuss the CDRL submittal process and CDRL management in terms of how it collects, distributes and maintains data and the data deliverables required during the execution of the contract.

2.1.1.4.4 Labor Chart

The Offeror shall provide a chart identifying the personnel assigned to the various tasks of the resulting contract in terms of personnel type (e.g. engineer, program manager, technician, etc.). The Offeror shall indicate personnel who are performing multiple discipline tasks, if applicable.

2.1.2 PAST PERFORMANCE

(a) The Offeror shall provide up to three (3) past performance references, if available, that reflect recent relevant experience performed within the last three (3) years of the closing date of the solicitation that demonstrate the ability to handle work performed under this contract. If fewer than three recent relevant past performance references are provided, the Offeror shall affirmatively state it does not have additional recent relevant past performance. Failure to do so may result in the offeror’s proposal being deemed unawardable. Include a discussion on how the references provided are relevant to the work being proposed. Include contract/task order number, contract/task order type, program name, total contract/task order cost, short description of work performed, and names and valid telephone numbers for the Procuring Contract Officer (PCO), Contracting Officer’s Representative (COR), and Program Manager (PM).

(b) Each past performance reference shall not exceed two (2) pages per reference, for a total of six (6) pages.

(c) Subcontractors performing more than twenty-five percent (25%) of the total price of the contract shall also submit three (3) past performance references that reflect recent relevant experience performed within the last three

(3) years and demonstrate the ability to handle work performed under this contract. If fewer than three recent relevant past performance references are provided for the major subcontractor, the Offeror shall affirmatively state the major subcontractor does not have additional recent relevant past performance. Failure to do so may result in the offeror’s proposal being deemed unawardable. Each past performance reference shall not exceed two (2) pages per reference, for a total of six (6) pages per subcontractor.

(End of Summary of Changes)